Portsmouth 29640US Route 1 Improvements

Public Advisory Committee Meeting - 4

December 16, 2020

Page 2: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Welcome and Introductions

• Jennifer Reczek, PE – NHDOT Project Manager• David McNamara, PE – Consultant Project Manager• Corey Spetelunas, PE – NHDOT Project Engineer• Stephanie Micucci, PE – NHDOT Project Engineer• Tyler Gagnon – Consultant Project Engineer

Page 3: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Agenda

• Welcome and Introductions• Recap of PAC3 – November 2019• Bicycle and Pedestrian Options• Transit Discussion• Next Steps and Schedule

Page 4: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Recap - PAC 3 Meeting• Purpose and Need Discussion

– No additional comments• Alternative 3

– Preferred• Alternative 2

– Acceptable• Alternative 1

– Not Desirable• Roundabouts

– Continue discussion– Price was a concern

• Overall Corridor Priorities

Page 5: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Questions/Comments?

Page 6: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian Designs• Alternative 3 – Minimal Build Layout

– Existing 66’ Right of Way (ROW)• Additional 12’ of ROW at select parcels

– Minimum 32’ of travel and turning lanes– 5’ for Utility panels and curbing– Maximum 29’ for bicyclists and pedestrians inside

ROW (34’ includes utility panels and curbing)

Page 7: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian Designs• Base Option (29’ to 30’):

– West Side - 10’ Shared-Use Path with 0 to 4’ Grass Panel and 5’ Shoulder

Base Option – West Side

Page 8: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian Designs• Base Option (29’ to 30’):

– East Side – 0 to 3’ Bike Lane Buffer, 6’ Bike Lane and 5’ Sidewalk

Base Option – East Side

Page 9: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian Designs

Base Option – No Grass Panel

Base Option – No Bicycle Lane Buffer

Page 10: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian Designs• Experienced Bicyclists (28’):

– 3’ Buffer/6’ Bike Lane/5’ Sidewalk – Both Sides

• Family/Recreational (30’):– 10’ Shared-Use Path, 5’ Shoulder – Both

Sides• Original Corridor Study (20’):

– 5’ Shoulder/5’ Sidewalk – Both Sides

Page 11: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Questions/Comments?

Page 12: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Ocean Road

Wilson RoadConstitution

DriveHeritage Ave.West Road

Begin Project

End Project

Page 13: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian – Critical Section- Service Credit Union

10’ Shared Use/4’ Grass Panel/5’ Shldr – 6’ Bike Lane/Existing Grass Panel/5’ Sidewalk

3’ Buffer/6’ Bike Lane/5’ Sidewalk

Page 14: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian - Critical Section – Turf Depot

10’ Shared Use/5’ Shldr

Page 15: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian – Critical Section – Whidden Cemetery (east side)

3’ Buffer/6’ Bike Lane/5’ Sidewalk

6’ Bike Lane/5’ Sidewalk

Page 16: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian – Critical Section – Whidden Cemetery (west side)

Offset Shared Use Path, 5’ Shldr - 6’ Bike Lane/5’ Sidewalk

3’ Buffer/6’ Bike Lane/5’ Sidewalk

Page 17: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian – Critical Section – Haps Roast Beef

10’ Shared Use/ 4’ Grass Panel/5’ Shldr - 6’ Bike Lane/5’ Sidewalk

10’ Shared Use/5’ Shldr - 3’ Buffer/6’ Bike Lane/5’ Sidewalk

Page 18: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian – Critical Section – Wing-Itz

10’ Shared Use/5’ Shldr - 3’ Buffer/6’ Bike Lane/5’ Sidewalk

10’ Shared Use/4’ Grass Panel/5’ Shldr - 6’ Bike Lane/5’ Sidewalk

Page 19: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Bicycle/Pedestrian – Critical Sections – 1950 Lafayette

10’ Shared Use/5’ Shldr - 3’ Buffer/6’ Bike Lane/5’ Sidewalk

10’ Shared Use/4’ Grass Panel/5’ Shldr - 6’ Bike Lane/5’ Sidewalk

Page 20: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Construction Costs

• Base Construction Cost (PAC 3)– 10’/4’/5’ and 6’/5’

• Construction Cost Change:– Add 3’ Bike Lane Buffer

• $25/LF

• 10,000 foot corridor– $250,000

Page 21: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Project Costs

1: 5 Lanes w/Median

(85' Width)

2: 5 Lanes w/TWLTL

(87' Width)

3: 3 Lanes w/TWLTL

(63' Width)

4: Two Multi Lane Roundabouts*

Segment 1 Sub-Total $5,800.000 $3,900,000 $2,900,000 --

Segment 2 Sub-Total $3,800,000 $2,700,000 $2,400,000 $5,100,000

Segment 3 Sub-Total $4,200,000 $2,300,000 $1,500,000 --

Segment 4 Sub-Total $5,000,000 $2,800,000 $2,100,000 --

Corridor Total $18,800,000 $11,700,000 $8,900,000 --

• Full Segment Construction Costs• Includes Contingency and Construction Engineering

*Alternative 4 is 0.4 miles long and can replace any other Alternative’s Segment 2.

Page 22: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Questions/Comments?

Page 23: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Transit– Existing Facilities

Page 24: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Transit – Existing Facilities - NB

Page 25: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Transit – Existing Facilities - SB

Page 26: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Questions/Comments?

Page 27: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Next Steps

• Public Informational Meeting – Winter 2021

• Continue Data Gathering and Analysis– Environmental– Noise– Traffic Analysis

• Refine Conceptual Designs

Page 28: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Schedule

• Finalize Alternatives – Winter 2021• Environmental Evaluation – Spring 2021• Public Informational Meeting – Winter

2021• Public Hearing –Summer/Fall 2021• Finalize NEPA – Fall 2021• Final Design - 2022 to 2024• Construction – Beginning in 2025

Page 29: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Questions/Comments?

Page 30: PAC4 121620 Final.ppt - Compatibility Mode...Microsoft PowerPoint - PAC4_121620_Final.ppt - Compatibility Mode Author dmcnamara Created Date 2/3/2021 7:20:03 PM

Contact Information

• Jennifer Reczek, PE – NHDOT Project Manager

– 603-271-3401– [email protected]