Paerdegat Basin Natural Area Park and Ecology Park
Jamaica Bay Task Force Meeting
May 6, 2014
John McLaughlin
Director, Office of Ecological Services
Bureau of Environmental Planning and
Analysis
New York City Department of Parks and Recreation
![Page 2: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/2.jpg)
Project Location
2
South Natural Area
Park
North Natural Area Park
Ecology Park
CSO Facility
![Page 3: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/3.jpg)
Project History
• Paerdegat Basin CSO Facility (30MG
storage tank and 20MG in-line storage)
• Online May 2011 ($404M)
• CSO Facility included the natural area
restoration and designates project area
as parkland.
• Restoration of significant tidal wetlands
and coastal uplands which further
augment water quality and ecological
improvements.
• Development of the Natural Area Park
and Ecology Park Involved numerous
stakeholders:
– DEP/DPR
– Community Board 18 (Bergen Beach,
Georgetown, Canarsie)
– NYSDEC Natural Resources
– ACOE.
3
![Page 4: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/4.jpg)
Natural Area Park - Objectives
4
![Page 5: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/5.jpg)
Background Information
• Project was partially funded under American Reinvestment and Recovery Act (ARRA) - $15M
• Approximately 40% of remain construction cost was picked up by DEP
• Project bids received in October 2009.
• Notice of Award issued December 16, 2009.
• Notice to Proceed issued March 15, 2010.
• Status – Substantial Completion of grading, landscaping and other work completed
in fall 2013
– Small contract planting remaining this spring
– Replacement plantings
5
![Page 6: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/6.jpg)
Overview of Natural Area Park
• Tidal Wetland Restoration: 4.5 acres
• Upland Natural Area Park: 21 acres North NAP
20 acres South NAP
• Ecology Park: 5 acres
(supervised public access)
• Perimeter Treatment
– Fencing and
sidewalks
6
![Page 7: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/7.jpg)
Sand Reuse
7
![Page 8: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/8.jpg)
Stockpiling of Sand
8
![Page 9: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/9.jpg)
Sand Placement on North Side
9
![Page 10: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/10.jpg)
Project Design Intent – North NAP
• Creation of tidal salt marsh
wetlands
• Spot removal and clearing of
invasive vegetation with no
excavation/fill activities. Re-
vegetated with native species.
10
![Page 11: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/11.jpg)
Project Design Intent – South NAP
• Excavation of historic fill along
shoreline to create tidal salt marsh
wetlands
• Excavated material graded to
create undulating topography
typical of coastal grassland
• Clean sand cap up to 2’ thick over
fill and excavation areas
• Stabilize area through native
coastal plant communities
11
![Page 12: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/12.jpg)
Ecology Park Layout
12
![Page 13: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/13.jpg)
Transformation of Site
13
Restoration of cleared areas with maritime grassland
habitat; water views
Debris and garbage to be removed
Placement of upland sand and tidal wetland planting
Invasive vines and vegetation to be cleared
Protection and preservation of native vegetation
Example of previously completed upland planting.
![Page 14: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/14.jpg)
Entrance
14
![Page 15: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/15.jpg)
Signage
15
![Page 16: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/16.jpg)
Perimeter Fence
16
![Page 17: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/17.jpg)
Signage
17
![Page 18: Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin](https://reader030.vdocument.in/reader030/viewer/2022032419/55a271831a28ab44278b47e6/html5/thumbnails/18.jpg)
Thank You