Renewables share in Total Energy
Global = 17-18% O/W Traditional Biomass = 9% Other renewable = 8% 30 Countries have a share of more than 20% EU & US = 12% Europe & Majors = 10% Japan = 6%
3
4
Global ScenarioShare of Renewable Energy
2030 2040 2050Conservative 10 – 15 15 -Moderate 22 35 40High 40% 60 80
5
Share of Renewable Electricity
Countries Existing 2030 2050
Europe 21% 36 – 65 97 – 100
US 11% 15 – 71 30 – 90
Japan 10% 20 – 57 85 – 100
China 18% 25 – 43 50 – 92
India/Other Asia 31% 16 – 62 27 – 86
LA 54 – 86 60 – 100
Africa 50 34 – 92
6
World Capacities of various Renewable Technologies - Status & Projections GW
2006 2011 2030
Hydro 800 970 1300 – 1740
Wind 74 238 920 – 2700
Solar PV 8 70 490 – 1000
CSP 0.40 1.8 40 – 140
Biomass 45 72 210 – 340
Geo thermal 9.5 11 30 – 50
Ocean 0.3 0.5 10 – 20
938+ 1362
World Total 4000
USA 900
Pakistan 25
7
Countries Share in various RENUSA GER Spain Italy China India Japan ROW
Solar PV % 5.7 35.6 6.5 18.3 4.4 7.1
Solar Heating Added Capacity%
0.9 1.9 0.6 0.8 81% 1.5 8.1
Solar Heating Total Capacity%
1 5% 4 64.8 1.5
Wind Power Additions MW
4.8 2 1.1 17 3
WP total capacity MW
42 28 20 45 13
Hydro % Total 49 6
8
Comparative features of various Renewable Technologies
Plant Size MW Capacity Factor %
Energy Cost US Cents / kwh
Biomass 25 – 100 70 – 80 7.9 – 17.6
Geo thermal 1 – 100 60 – 90 5.7 – 10.7
Hydro Power Grid base 1 – 18000 30 – 60 5 – 10
Micro Hydro 0.1 – 1000 kw - 5 – 40
Ocean (Tidal) 1 – 250 23 – 29 21 – 28
Solar PV roof top 3.5 kw 10 – 20 22
Solar PV Utility 2.5 – 100 10 – 20 20
Wind Power on shore 1.5 – 3.5 20 – 40 5.21 – 16.5
Biogas CHP 0.5 – 5 MW 80 11.8 – 35.2 USD/GJ
Bio diesel 16.5 – 177
Ethanol 20 – 102/L
Renewable Energy Cost TrendsLevelized cents/kWh in constant $20001
Wind
1980 1990 2000 2010 2020
PVC
OE
ce
nts
/kW
h
1980 1990 2000 2010 2020
40
30
20
10
0
100
80
60
40
20
0
BiomassGeothermal Solar thermal
1980 1990 2000 2010 2020 1980 1990 2000 2010 2020 1980 1990 2000 2010 2020
CO
E c
en
ts/k
Wh
10
8
6
4
2
0
70
60
50
40
30
2010
0
15
12
9
6
3
0
Source: NREL Energy Analysis Office (www.nrel.gov/analysis/docs/cost_curves_2002.ppt)1These graphs are reflections of historical cost trends NOT precise annual historical data.Updated: October 2002
10
Wind Power in Pakistan• 2X50 MW projects already installed(Zorlu,FFC)• Several at Planning Stage• Total Potential Sindh-30,000 MW• Actual Potential : 10% of Total(2500 MW)• High Capacity Factor-31%• Unrealistically High Tariff-16 cents per kWh
12
Feed in Tariff in EU RegionWind Power
5.11
7.4 7.5 7.78 7.80 8.6110.21 10.21 10.65
11.67 11.9613.00
17.21
0.002.004.006.008.00
10.0012.0014.0016.0018.0020.00
US c
ents
/kw
h
13
Wind Power capacity factors in selected countries%
0
5
10
15
20
25
30
35
40
14
Wind Is The Cheapest Power Source in Uruguay
• The average winning price in a recent Uruguayan auction for three 50MW wind power projects was US $63.70 per MWh. The cost of diesel or fuel-oil generated electricity in Uruguay is $135 – 140 per MWh.
15
Wind Power in Brazil is Cheaper than Gas
• Developers of 44 wind farms bid an average of BRZ$99.58 (US$62) per MWh – below the average price for the two natural gas projects (BRZ$103.26), and a hydro project (BRZ$102)
• 1 USD=2 BRZ• http://www.greenwellfuture.com/
wind_power_in_brazil
16
Comparative Solar Suitability of regions
18
Solar PV Cells
19
Family of PV cells and efficiencies
20
21
Solar PV applications and Business models thereof
•Residential/small off-grid•Residential grid integrated•Utility distributed•Utility Power Plant
22
Off-grid Solar PV application
23
Grid Connected Residential PV application
24
Schematic layout of Solar PV utility Power Plant
25
26
27
28
29
30
31
32
33
34
35
36
37
Solar PV Cost & Tariff in various countries(2013)
Capital Cost USD/W Tariff CapacityPV Panels BoS Total Usc/kWh Factor%
India(regulated) 0.63 0.85 1.481 16.2 19India Auctions 11.8-15.9Europe(Germany) 0.78 0.9 1.68 17.55 10Spain/Italy 15.6 14.8USA(Calif,Texas,Florida) 15-17 18California Auctions 8.92-12 19Pakistan(proposed) 2.392 23.29 17_______________________________________________________________________
Source: compiled by the Author(CERC India, PV-magazine, NEPRA)
38
Comparative CAPEX for Solar PV utilities(centralized)in various regions(2013)in USD/W
India China Europe/USUS target 2020 (Sunshot)
Total(panels+ BoS)o/w 1.481 1.35 1.681 1
Panels 0.63 0.5 0.78 0.5
BOS o/w 0.85 0.85 0.9 0.5
land Civil Works(% of BoS) 14 0.2
Racking structures-do 13 0.2
Inverter-do 7 0.18
Grid Interface/do 15 0.12
Various incl IDC/do 10 0.2
Source: compiled by the Author(CERC India, Solar Server, GTM Market Study)
39
Comparative Solar PV Installed costs 2012-13(USD/W)IRTPV-March2013
Europe USA ChinaPV Module 0.69 0.69 0.50BoS 0.47 1.00 0.57Owner’s Cost(say)
0.25 0.25 0.25
Total 1.41 1.94 1.32
40
41
42
Pakistan Projected Demand of REN(2025-50)
2013 2025 2050
Total Installed Capacity
25000 MW 50,000 MW 150,000 MW
REN Share(10,20,40%)
2500 10000 60,000
Wind 1500 5000 30,000
Solar PV 1500 5000 30,000
Hydro 6000 15000 30,000
Bio-Mass-gas BioCNG
43
Pakistan Solar PV Tubes well market
•Total Tube well = 1,000,000•o/w Diesel = 834905 – 11000 MW• Electric = 85868 – 1104 MW• 40% run less than 800 hrs•Bulk of the Pumps 11-75 ft head •75-80% of Tube Wells in Punjab•Diesel – Number of days of Tube Well per year = 125•Electric Number of days of Tube Well per year = 184•10 – 15 -20 – 22 – 25 HP Avg 17•Replacement demand = 400,000 (1994 and older)•Average annual demand = 30,000 pumps @ 10 kw per = 300 MW/pr say = 100 MW (for 10,000 pumps)
44
Item units Amount/ValueSolar PV capacity kW 15Capacity factor hours 1600Annual Electricity produced kWh 24000Replacement cost of Diesel Rs/kWh 25Annual Diesel replacement Rs/yr 600000CAPEX Solar PV and Pump Rs 1800000Investment Payback Period years 3Equity @30% Rs 540000Loan Rs 1260000Repayment period years 10interest rate %p.a 14Annual Debt servicng Rs 241,559 Annual saving for first 10 yrs Rs 298,441 Equity payback Period yrs $1.81 Present Value of 25 yrs saving Rs 5,446,224 Net Present Value @10% Rs 3,646,224 IRR % 33.31Electricity cost in1-10 years Rs/kWh 10.06 Electricity cost in11-25 years 0
Micro-economics of Solar PV in Tube-well visa-vis Diesel EngineCase study of a 15 kW Solar Tube-well replacing diesel engine
45
46
47
ISSUES
•T & D Losses•High cost of Energy (circular debt)•High Capital Costs•Institutional Issues•Lack of Transparency•Lack of Competitions•Local content /technology
48