panahsaz...panahsaz engineering company 2) water industry-construction operation of water intake...
TRANSCRIPT
anahsazP Engineering Company
anahsazP Engineering Company
• PanahSaz-e-Iran Engineering Co. was established in 1989
by the efforts of a group of committed experts and engineers
with brilliant records in performing developmental and
engineering projects of the country in order to execute
infrastructural projects by considering the needs of country.
• PanahSaz-e-Iran Engineering Co. is proud of being the origin
of creative and useful effects on execution of important
industrial plans in different fields since 1989 until now with
the goal of progress and along with social justice by
maintaining the observance of good relation with employers
and relying on managerial and administrative capabilities of
domestic committed and expert forces. Execution of more
than 50 plans by PanahSaz-e-Iran Engineering Co.
throughout Iran is a proof to this claim.
About Panahsaz
anahsazP Engineering Company
Contractor Competency Certificates
Grade 1 in The Field of Oil and Gas and Petrochemical
Grade 1 in The Field of Construction
Grade 1 in The Field of Hydraulics
Grade 1 in The Field of Transportation
Grade 2 in The Field of Utilities & Equipment
Grade 5 in The Field of industry and Mining
Grade 5 in The Field of Agriculture
anahsazP Engineering Company
Abilities:(Engineering, Procurement, Construction, Commissioning)
LPG/ LNG double wall tank (Cryogenic).
Floating Roof Tanks (Internal/External)
Fixed Roof Tank (Pressure Vessel/Atmospheric)
Spherical Tank
Gas &water pipe lines.
water & waste water treatments and water reservoirs.
concrete bridges, steel deck bridges and stay – cable bridges.
Dam , intake , jetty , quay ports and related structures , building ,
installation & other utilizes
anahsazP Engineering Company
Abilities:(Engineering, Procurement, Construction)
cooling system for power plants.
industrial slaughter house.
all heavy structures
soil improvement works including pre- cast pile driving ,sheet
piling , drilling of cast in situ piles & micro piles .
Quay & Ports
Irrigation, Drainage & Pumpage Station
Building Construction
anahsazP Engineering Company
Projects in map:
anahsazP Engineering Company
PROJECT LIST & REFERENCES
1) Oil, Gas & Petrochemical Industry
Completed Project
Incompleted ProjectDouble Wall LPG Storage Tanks – Assalouyeh-Phases 4 & 5 Double Wall LPG Storage Tanks – Assalouyeh-Phases 6, 7 & 8 Double Wall LPG Storage Tanks – Assalouyeh-Phases 9 & 10(EPC contract)Double Wall LPG Storage Tanks – Assalouyeh-Phase 14 (EPC contract)Double Wall LPG Storage Tanks – Assalouyeh-Phases 15 & 16 (EPC contract)Double Wall LPG Storage Tanks – Assalouyeh-Phases 17 & 18 (EPC contract)Double Wall LPG Storage Tanks – Assalouyeh-Phase 19(EPC contract) Double Wall LPG Storage Tanks – Assalouyeh-Phases 22, 23 & 24(EPC contract)Double Wall LPG Storage Tanks -SIRR Island(EPC contract)Double Wall LPG Storage Tanks – Kharg Island(EPC contract)Condensate & Pentane storage Tanks – Kharg Island(EPC contract)Construction of Pipe Racks -Area3 - – Assalouyeh-Phases 17 & 18Civil works-Area5- – Assalouyeh-Phases 17 & 18Construction and Infrastructural Operations of the Project for Ethan and Propane Recovery from NF2 Fixed Roof, Fire water storage tank- Phases 17 & 18(EPC contract)Floating Roof, Condensate storage tanks, EPC 2(EPC contract)
anahsazP Engineering Company
Name of Project: Construction of double Wall tanks
Client: Hyundai
Period of Work: 14.5 Months
Date of Completion: aug.2005
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phases 4 and 5 )
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phases 6, 7 and 8 )
Name of Project: Construction of double wall tanks
Client: TIJD Consortium
Period of Work: 24 Months
Date of Completion: sep.2006
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phases 9 and 10 )
Name of Project: Construction of double wall tanks
Client: OIEC
Period of Work: 25 Months
Date of Completion: Nov.2006
anahsazP Engineering Company
Name of Project: Construction of double wall tanks
Client: sepanir
Period of Work: 25 Months
Date of Completion: ongoing
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phases 15 and 16 )
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phases 17 and 18 )
Name of Project: Construction of double wall tanks
Client: IPMI
Period of Work: 28 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phase 14 )
Name of Project: Construction of double wall tanks
Client: IPMI
Period of Work: 28 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phase 19 )
Name of Project: Construction of double wall tanks
Client: PETROPARS
Period of Work: 26 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(South Pars Gas Field Development Phases 22, 23 and 24 )
Name of Project: Construction of double wall tanks
Client: PETROSINA ARIYA
Period of Work: 24 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(Double Wall Gas Tanks-SIRR Island- EPC)
Name of Project: Construction of double wall tanks
Client: OIEC
Period of Work: 36 Months
Date of Completion: May.2012
anahsazP Engineering CompanyOil, Gas & Petrochemical Industry
(Construction of Buildings and Civil Operations of Sirri NGL Project )
Name of Project: Construction of Buildings and Civil Operations of Sirri NGL Project
Client: OIEC
Period of Work: 36 Months
Date of Completion: May.2012
anahsazP Engineering Company
Name of Project: Construction of double wall tanks
Client: IRITEC
Period of Work: 36 Months
Date of Completion: Ongoing
Oil, Gas & Petrochemical Industry
(Double Wall Gas Tanks-Khaeg Island- EPC)
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(Construction of condensate & pantan storage Tanks – kharg Island- EPC)
Name of Project: Construction of condensate & pantan storage Tanks
Client: IRITEC
Period of Work: 24 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(Construction of Pipracks -area3 -South Pars Gas Field Development Phases 17 and 18)
Name of Project: Construction of Pipracks -area3
Client: IPMI
Period of Work:12 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(Civil works-area5- South Pars Gas Field Development Phases 17 and 18)
Name of Project: Construction of Civil works-area5
Client: IPMI
Period of Work:30 Months
Date of Completion: Ongoing
anahsazP Engineering Company
Oil, Gas & Petrochemical Industry
(Construction of Fire water storage tank- Phases 17 and 18)
Name of Project :Construction of Fire water storage tank
Client: IPMI
Period of Work:12 Months
Date of Completion: May.2012
anahsazP Engineering CompanyOil, Gas & Petrochemical Industry
( Construction of condensate storage tanks-EPC )
Name of Project: Construction of condensate storage tanks
Client: PETROPARS
Period of Work: 24 Months
Date of Completion: Ongoing
anahsazP Engineering Company
2) Water Industry
Construction Operation of Water Intake System of Neka Combinational Cycle Power Plant-
Design and Construction of Jetty and Supporting Facilities of Naft khazar(EPC)-
Construction of Zahak Treatment Plant -
Construction of Kashan Ring Tanks, RS2, RF2, RN1 -
Design and Construction of Sewage Treatment Plant of Shahr ghods-
Construction Operation of Water Intake System of Paresar Combinational Cycle Power Plant -
Construction of pump station, pipe lain of likvan
Completed Project
Incompleted Project
anahsazP Engineering Company
Water Industry(Construction of Water Intake System of Neka Combinational Cycle Power Plant)
Construction of Water Intake System of Neka Combinational Cycle Power Plant
Client: MAPNA Group
Period of Work: 21 Months
Date of Completion: june.2006
anahsazP Engineering Company
Water Industry(Construction of Water Intake System of Paresar Combinational Cycle Power Plant)
Construction of Water Intake System of Neka Combinational Cycle Power Plant
Client: MAPNA Group
Period of Work:36Months
Date of Completion:ongoing
anahsazP Engineering Company
Water Industry(Construction of Zahak Treatment Plant)
Construction of Zahak Treatment Plant
Client: ABFA Sistan va balochestan
Period of Work:24Months
Date of Completion:2005
anahsazP Engineering Company
Water Industry(Construction of Kashan Ring Tanks, RS2, RF2, RN1)
Construction of Kashan Ring Tanks, RS2, RF2, RN1
Client: ABFA Isfehan
Period of Work:24Months
Date of Completion:2010
anahsazP Engineering Company
Water Industry(Design and Construction of Sewage Treatment Plant of Shahr ghods )
Design and Construction of Sewage Treatment Plant of Shahr ghods
Client: ABFA Tehran
Period of Work:48Months
Date of Completion:ongoing
anahsazP Engineering Company
Water Industry(Construction of pump station, pipe lain of likvan )
Construction of pump station, pipe lain of likvan
Client: JAHAD Ardebil
Period of Work:12Months
Date of Completion:ongoing
anahsazP Engineering Company
3) Quay & Ports
Design and Construction of Jetty and Supporting Facilities of Naft khazar(EPC)
Harbours, Utility, Infrastracure for Amir-Abad Port
Construction of Fishing Nahr ghasr Port
Design and Construction of Sejafi Port and Related Buildings
Construction of Jetty and Supporting Facilities of Shadegan
Completed Project
Incompleted Project
anahsazP Engineering Company
Quay & Ports (Design and Construction of Jetty and Supporting Facilities of Naft khazar(EPC))
Construction of Jetty and Supporting Facilities of Naft khazar(EPC)
Client : Naft-e-Khazar Co.
Period of Work:24Months
Date of Completion: march.2010
anahsazP Engineering Company
Quay & Ports (Harbours, Utility, Infrastracure for Amir-Abad Port)
Harbours, Utility, Infrastracure for Amir-Abad Port
Client Iran Fisheries Organization
Period of Work:36 Months
Date of Completion: jun.2004
anahsazP Engineering Company
Quay & Ports (Construction of Fishing Nahr ghasr Port )
Construction of Fishing Nahr ghasr Port
Client : Iran Fisheries Organization .
Period of Work:15 Months
Date of Completion: march.2006
anahsazP Engineering Company
Quay & Ports (Construction of Jetty and Supporting Facilities of Shadegan )
Construction of Jetty and Supporting Facilities of Shadegan
Client : Khuzestan Water and Electricity Organization.
Period of Work:24 Months
Date of Completion: ongoing
anahsazP Engineering Company
Quay & Ports (Design and Construction of Sejafi Port and Related Buildings )
Design and Construction of Sejafi Port and Related Buildings
Client : Khuzestan Water and Electricity Organization.
Period of Work:24 Months
Date of Completion: May 2010
anahsazP Engineering Company
4)Irrigation, Drainage & Pumpage Station(Construction of Pumping Station No. 1 of Jofeir Irrigation and Drainage )
Design and Construction of Sejafi Port and Related Buildings
Client : Khuzestan Jahad-Agriculture Organization.
Period of Work:12 Months
Date of Completion: May 2006
anahsazP Engineering Company
Construction of Azadegan non-Flat Highway Bridge
Construction of Takhti and Kashani Underpasses
Construction Operation of Hafez Bridge
Bridge Design and Construction on Karoun River
Construction of Ahwaz 8th Bridge
5) Bridge
anahsazP Engineering Company
Bridge(Construction of Azadegan non-Flat Highway Bridge)
Construction of Azadegan non-Flat Highway Bridge
Client : Tehran 18th Municipality Zone.
Period of Work:18 Months
Date of Completion: Dec.2006
anahsazP Engineering Company
Bridge(Construction of Takhti and Kashani Underpasses)
Kashani Underpasses with Basij-e-Mostazafan Boulevard
Client : Islamshahr Municipality.
Period of Work:10 Months
Date of Completion: oct 2005
anahsazP Engineering Company
Bridge( Construction Operation of Hafez Bridge )
Construction Operation of Hafez Bridge
Client Shiraz Municipality.
Period of Work:20 Months
Date of Completion: jul.2004
anahsazP Engineering Company
Bridge(Bridge Design and Construction on Karoun River - EPC)
Bridge Design and Construction on Karoun River
Client: Khuzestan Water and Electricity Organization
Period of Work:36 Months
Date of Completion: oct.2008
anahsazP Engineering Company
Construction of Ahwaz 8th BridgeClient: Ahwaz Municipality. Period of Work:36 MonthsDate of Completion: oct 2008
Bridge(Construction of Ahwaz 8th Bridge)
anahsazP Engineering Company
6) Building Construction
Construction of 4 buildings paydar shahr
Construction of doma building
Construction of 8 buildings to yas complex
anahsazP Engineering Company
Construction of 4 Buildings Paydar Shahr
Client: Kosha Paydar Eng.co
Period of Work:24Months
Date of Completion: ongoing
Area:144000 M2
Structure Type: Concrete Structure
Type of Roof: Post Tension
Land use : Residential
Building(Construction of 4 Buildings Paydar Shahr)
anahsazP Engineering Company
Building(Construction of Doma Building)
Construction of Doma Building
Period of Work:18Months
Date of Completion: ongoing
Area : 5300 m2
Type Structure: Steel structure
Land use : Residential
anahsazP Engineering Company
Construction of 8 Buildings to Hemat Complex
Client : yas co
Period of Work:24 Months
Date of Completion: Ongoing
Area : 66547 m2
Structure Type: Steel structure
Landscaping : 13300 m2
Land use : Residential & Commercial
Building(Construction of 8 Buildings to Yas Complex)
anahsazP Engineering Company
AWARDS
anahsazP Engineering Company
AWARDS