panel p1j: navigation data april 2003 ccsds p1j final report spring meeting, esa/estec, netherlands...

9
April 2003 Panel P1J: Navigation Data CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572

Upload: alexina-norton

Post on 13-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003

Panel P1J: Navigation Data

CCSDS P1J FINAL REPORT

Spring Meeting, ESA/ESTEC, Netherlands

Dates: April 1-4, 2003Felipe Flores-Amaya

NASA/GSFC/Code 450/Code 572

Page 2: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 2

Panel P1J: Navigation DataAgenda

Accomplishments

Application of ODM

Future Work

Issues

Participants

Page 3: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 3

Panel P1J: Navigation DataAccomplishments (1)

Completed a detailed review of latest version of the Orbit Data Message (ODM) Red Book, based on P2 personnel input to separate syntax and semantics and to incorporate use of XML. P1J completed a reorganization of the document to provide ASCII and XML transport options of the orbit parameters and ephemeris messages. Continued discussions of tracking data requirements and write up of operational characteristic of tracking data support and tracking data descriptions, as a first step for producing a tracking data Recommendation.

Continued discussion and write up to define requirements on spacecraft ID’s, to be delivered to the Space Assigned Numbers Authority (SANA) for action.

Continued discussions on attitude and plan to write a draft for an attitude data message Recommendation.

Page 4: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 4

Panel P1J: Navigation DataAccomplishments (2)

Participated in another joint P1J/P1K session, to discuss the timing service issues. Agreed to write navigation timing issues to be provided to P1K and to the new Time Synchronization Architecture Working Group.

Received copy of the white book REAL-TIME TRACKING DATA TRANSFER SERVICE SPECIFICATION (SLE related) and P1J will provide feedback.

Discussed, reviewed and completed charter for the Navigation working group.

Reviewed and discussed all open action items

Page 5: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 5

Panel P1J: Navigation DataApplication of ODM

ESOC-JPL did a test using Ulysses spacecraft to exchange the ephemeris message (EPM). Transmission and processing was successful.

ESA-JPL ICD specifies use of EPM as the navigation operational interface for the Rosetta and Mars Express missions; which are currently scheduled to launch on Jan 2004 and June 2003, respectively.

CNES-DLR will perform testing to exchange the orbit parameters message (OPM). Plan to use OPM to support future missions (TBD)

Page 6: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 6

Panel P1J: Navigation DataFuture Work

Finalize the ODM Red Book, including input from XML personnel.Schedule: Start internal review April 7, end review May 15, then request advancing

Red Book to Blue Book status

Develop draft for Attitude data exchangeSchedule: First draft white book May 10, 2003

Complete write up for Tracking data exchange requirements.Schedule: drafts due April 18, followed by internal review by CCSDS navigation

personnel.

Complete a write up for spacecraft ID for delivery to SANA.Schedule: Following feedback from navigation personnel document will be ready by

May 1, 2003.

First meeting of Navigation Working Group week of Oct/Nov 2003, Annapolis, MD USA

Page 7: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 7

Panel P1J: Navigation DataResolutions

• P1J requests MC to approve promotion of ODM RB to BB status, subject to final review from XML personnel to be completed by May 2003.

Page 8: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 8

Panel P1J: Navigation DataIssues

Ask to confirm that the new Time Synchronization Architecture working group will be responsible for investigations of timing issues.

Ref. P1 action item A-P-00-2

Page 9: Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code

April 2003 P1J Final Report 9

Panel P1J: Navigation Data

Participants

F. Flores-Amaya (Chairman/NASA/GSFC)

T. McElrath (NASA/JPL)

R. Kiehling (DLR)

J. Foliard (CNES)

C. Acton (NASA/JPL)

S. Pallaschke (ESA/ESOC)

R. Kannenberg (NASA/GST)