Installation of Pipeline End Manifold (PLEM)
and Subsea Tie-In of Expansion Spools
Zamri B Ahmad Petroleum Management (PMU),
PETRONAS
© 2011 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
PETRONAS-PETRAD-INTSOK-CCOP
Deepwater Subsea Tie-Back Workshop 25 – 26th January 2011
![Page 2: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/2.jpg)
• INTRODUCTION
• Background Information
• Scope of Presentation
• INSTALLATION PRELIMINARIES
• Pipeline End Manifold (PLEM)
• Expansion Spools
• Installation Barge
• Final Assembly
• INSTALLATION PROCEDURE
• Pipeline End Manifold (PLEM)
• Expansion Spools
• Final Assembly
• CONCLUSION
OUTLINE
1
Introduction Installation Preliminaries Installation Procedure Conclusion
![Page 3: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/3.jpg)
2 2
Pipeline End Manifold (PLEM):
• commonly used for subsea manifold to tie-in of underwater pipelines.
• used to comingle 2 or more pipelines together and eliminate the
need for additional risers.
INTRODUCTION:
Background Information Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 4: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/4.jpg)
3
Introduction Installation Procedure Installation Preliminaries Conclusion
INTRODUCTION:
Background Information
![Page 5: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/5.jpg)
4
Introduction Installation Procedure Installation Preliminaries Conclusion
INTRODUCTION:
Background Information
![Page 6: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/6.jpg)
5 5
Installation of PLEM and expansion spools:
• require great precision
• sensitive to weather conditions
• high installation cost
INTRODUCTION:
Background Information Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 7: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/7.jpg)
1. Installation of PLEM.
2. Installation of 2 expansion spools.
6
INTRODUCTION:
Scope of Presentation
CPP
PLEM
MOPU 1
MOPU 2
10” 6km
16” 25km
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 8: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/8.jpg)
Designed Weight: ~ 70 MT
Dimension: 14m x 6m
Water Depth: 114ft (43.9m)
7
INSTALLATION PRELIMINARIES:
Pipeline End Manifold (PLEM) Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 9: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/9.jpg)
8
INSTALLATION PRELIMINARIES:
Pipeline End Manifold (PLEM) Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 10: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/10.jpg)
Expansion Spool at Pipeline / PLEM Expansion Spool at PLEM / MOPU
16” diameter
Full Well Stream (FWS)
9
INSTALLATION PRELIMINARIES:
Expansion Spools Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 11: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/11.jpg)
10
INSTALLATION PRELIMINARIES:
Expansion Spools Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 12: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/12.jpg)
DP DLB Lewek Champion
• 358 person accommodation
• 1 x 800MT main crane
• 2 x 30MT secondary crane
• Dynamic Positioning with 6 Azimuth thrusters (max thrust 378.7kN)
11
INSTALLATION PRELIMINARIES:
Installation Barge Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 13: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/13.jpg)
PLEM
Expansion
spool
Pipeline to CPP
MOPU Leg
Footing
Expansion
spool
12
For future
expansion
INSTALLATION PRELIMINARIES:
Final Assembly Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 14: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/14.jpg)
13
INSTALLATION PROCEDURE:
Pipeline End Manifold (PLEM)
PLEM
Pre-installation:
USBL
beacons
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 15: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/15.jpg)
14
INSTALLATION PROCEDURE:
Pipeline End Manifold (PLEM)
Barge setup for PLEM installation
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 16: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/16.jpg)
15
INSTALLATION PROCEDURE:
Pipeline End Manifold (PLEM)
PLEM footprint and debris survey.
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 17: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/17.jpg)
Stage 2 Stage 1 Stage 3 16
INSTALLATION PROCEDURE:
Pipeline End Manifold (PLEM) Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 18: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/18.jpg)
Barge Set-Up for Pipeline /
PLEM Spool Installation
17
INSTALLATION PROCEDURE:
Expansion Spools Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 19: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/19.jpg)
Pipeline on an A Frame
18
INSTALLATION PROCEDURE:
Expansion Spools
Lifting Riggings on Expansion Spool
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 20: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/20.jpg)
INSTALLATION PROCEDURE:
Expansion Spools
Stage 2 Stage 1 Stage 3 19
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 21: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/21.jpg)
20
INSTALLATION PROCEDURE:
Expansion Spools
Expansion spool tie-in to PLEM
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 22: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/22.jpg)
SPOOL PLEM
21 +/- 300mm
INSTALLATION PROCEDURE:
Expansion Spools
2
Introduction Installation Procedure
1
Installation Preliminaries Conclusion
![Page 23: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/23.jpg)
22
INSTALLATION PROCEDURE:
Expansion Spools
Expansion spool tie-in to pipeline
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 24: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/24.jpg)
Flange Protector Drawings
23
INSTALLATION PROCEDURE:
Expansion Spools Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 25: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/25.jpg)
Barge Set-Up for PLEM / MOPU
Spool Installation
24
INSTALLATION PROCEDURE:
Expansion Spools Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 26: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/26.jpg)
25
INSTALLATION PROCEDURE:
Final Assembly Introduction Installation Procedure
PLEM
Expansion
spool
Pipeline to CPP
MOPU Leg
Footing
Expansion
spool
Installation Preliminaries Conclusion
![Page 27: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/27.jpg)
26
Similar approach is used for deepwater installation.
However, the challenges are greater. Due to the depth;
• human divers are out of bound. Thus extensive use of ROVs
• high-accuracy beacons are needed for positioning.
• DP vessel are required as apposed to anchor handling.
CONCLUSION:
Introduction Installation Procedure Installation Preliminaries Conclusion
![Page 28: Paper09 Zamriahmad Petronas Pmu](https://reader033.vdocument.in/reader033/viewer/2022052215/5448d8a7b1af9f10108b4bea/html5/thumbnails/28.jpg)
27
THANK YOU
Introduction Installation Procedure Installation Preliminaries Conclusion