Page 1: PARALLEL-BAR PROTOTYPING STATUS

Page 1

Jean Delayen

Center for Accelerator ScienceOld Dominion University

andThomas Jefferson National Accelerator Facility

PARALLEL-BARPROTOTYPING STATUS

LHC-CC 11, CERN 14-15 November 2011

Page 2: PARALLEL-BAR PROTOTYPING STATUS

Page 2

JLab 11 GeV Deflector

Page 3: PARALLEL-BAR PROTOTYPING STATUS

Page 3

Cavity Drawing

Page 4: PARALLEL-BAR PROTOTYPING STATUS

Page 4

Cavity Assembly(Tuning before

weld)

Body Weldment

Cavity Shoulders

Cavity shoulder machining

Center Shell Weldment

Forming/Machining

End Cap Weldments

End Cap Forming/Machinin

g Beam Pipes/Ports

Beam Pipe Rolling/Machining Flange Machining

FABRICATION OVERVIEW

Page 5: PARALLEL-BAR PROTOTYPING STATUS

Page 5

OFC copper unit will be fabricated before Niobium cavity.• Components forming and machining

Each components will have longitudinal margin for tuning and welding • Sub-assembly e-beam welding

All weld seams are full thickness butt weld, weld parameter study done• Warm tuning

Initial measurement of frequency before welding• Sub-assembly BCP

Currently BCP is preferred. JLAB BCP supports 80-100 mT gradient• Assembly welding• Frequency measurements before and after vacuum load• Stiffener welding• Frequency measurements before and after vacuum load • Final BCP and high pressure rinse

• Electro polish is also considered

Fabrication Procedure

Page 6: PARALLEL-BAR PROTOTYPING STATUS

Page 6

Center shell forming(Die cross section)

Center shell machiningWeld margin included

EBW seams: 40% pre-pass, 50kV 48mAmp 6 in/min beam speedWelding will be both sides to ensure the smooth surface inside

Machined cavity shoulder Welding cavity shoulder and center shell

Body Weldment

Page 7: PARALLEL-BAR PROTOTYPING STATUS

Page 7

End cap side Center shell side

Transition blockAluminum trial part shown

Page 8: PARALLEL-BAR PROTOTYPING STATUS

Page 8

End cap forming

Machining(Weld and tuning margin included)

Machining port openings Welding beam port and coupler ports

End Cap Weldment

Page 9: PARALLEL-BAR PROTOTYPING STATUS

Page 9

Beam pipes and coupler ports are made.Blank flanges are not shown.

Pipe ends need to be machined before welding.

Al-Mg gaskets for final assembly. For tunings and measurements Indium seal will be used.

Niobium beam ports with Nb-Ti flanges

Page 10: PARALLEL-BAR PROTOTYPING STATUS

Page 10

Multi step frequency measurements to compare with the analyses

1. Warm Tuning before Final Weld

2. Frequency measurement after final weld3. Evacuate and measure frequency4. Weld stiffeners5. Evacuate and measure frequency6. Final BCP and high pressure rinse

Frequency Measurements

Page 11: PARALLEL-BAR PROTOTYPING STATUS

Page 11

LHC Crab Cavity (ODU/Niowave)

Page 12: PARALLEL-BAR PROTOTYPING STATUS

Page 12

LHC Crab Cavity

Page 13: PARALLEL-BAR PROTOTYPING STATUS

Page 13

Cavity Assembly

Page 14: PARALLEL-BAR PROTOTYPING STATUS

Page 14

Cavity Parts

• Mechanical design of the end plates with flanges is finished and the parts of this subassembly are manufactured

• Outer conductor forming design is in progress

Page 15: PARALLEL-BAR PROTOTYPING STATUS

NIOWAVEwww.niowaveinc.com

400 MHz LHC Crab Cavity Parts in Production (1)

• Copper prototype of the end plates was stamped

• And the nipples were pulled

Page 16: PARALLEL-BAR PROTOTYPING STATUS

NIOWAVEwww.niowaveinc.com

400 MHz LHC Crab CavityParts in Production (2)

• Beam and side port pipes are brazed with the stainless steel conflat flanges

• Both of the Nb end plates were stamped and nipples were pulled

• The preparation for the welding of the brazed beam pipes and side ports pipes is underway

• The OC parts and dies are in production

Page 17: PARALLEL-BAR PROTOTYPING STATUS

NIOWAVEwww.niowaveinc.com

17

400 MHz LHC Crab CavityParts in Production (3)

Page 18: PARALLEL-BAR PROTOTYPING STATUS

NIOWAVEwww.niowaveinc.com

LHC Crab Cavity Schedule• Complete EB Welding of End Caps with beam ans side ports

– November 8th, 2011 • Welding Fixture for the Outer Conductor manufacture

– November 21st, 2011 • Complete OC fabrication

– November 28th, 2011 • Complete Cavity Fabrication (Welding of End-plates with OC)

– December 12th, 2011 • Welded Cavity leak checking and inspection

– December 19th, 2011• Flash Cavity Etch (~20 m)

– December 21st, 2011• Stiffening Ribs design and fabrication

– January 31st, 2012

Page 19: PARALLEL-BAR PROTOTYPING STATUS

NIOWAVEwww.niowaveinc.com

LHC Crab Cavity Schedule2012

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul

Design PhaseCrabbing cavity designRF coupler designHOM dampers designLLRF tuners designAluminum model designColdmass designDesign Review at ODU/JLabFinal Design Approved

Fabrication PhaseProcure Niobium & NbTiProcure componentsFabricate Al cavity modelLLRF test of Al modelFabricate Nb cavity w/o SR End-Plates Outer Conductor Stiffening RibsProcess cavityAssemble ColdmassCold shock & leak checkShip module to ODU/JLab

Vertical Test PhaseSetup testing at ODU/JLabCooldown cavity & cryoMeasure f, Q vs EMeasure HOMMeasure microphonicsMeasure static Cryo loadPhase II Complete

PHASE IIICryomodule designProcure cryomodule componentsFabricate LHe vesselInstall He vesselFabricate LN jacketCryomodule assembleyCryomodule test setup at ODU/JLab

Milestones Date to complete Milestones Date to completeCrabbing Cavity Design Complete Niobium Cavity Fabrication CompleteAluminum Model Complete Complete assembly of ColdmassLLRF Test of Cu Model Complete Measure f, Q vs EFinal Design Approved Phase II Complete

30-Jun-1228-Feb-1130-Jun-11 30-Jun-12

31-Dec-11

2010 2011

31-Oct-1030-Apr-1231-Dec-10