Page 1: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Parking and Transportation

Annual Public HearingApril 22, 20193:00-4:00 pm

Page 2: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Meeting Agenda

1. Introductions2. Program Successes3. Upcoming Summer Construction Projects4. Proposed Budget Plans for FY205. Other Notable Activities6. Open Forum for Input From Public 7. Adjourn the Annual Hearing by 4:00 pm

Page 3: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Program Successes:

• Replaced parking ramp equipment with point-to-point encrypted (P2PE) credit card processors

• Replaced pay lot equipment with P2PE credit card processors

• Resurfaced A-2 Lot• Removed the 525 House expanding AA Lot parking• Converted C Lot from employee parking to resident

student parking• Hired our first FT Customer Service Representative• Changed 68 outside incandescent lights to LED

lighting

Page 4: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

FY19 Parking Expenditures

Page 5: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Summer Construction Projects

• LED Lighting Upgrade Continues• 4th Avenue Resurfacing Project

Page 6: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

LED Lighting Project

Page 7: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

LED LightingProject-116 Lights Total37 Atwood Mall68 Green Path11 TBD

Page 8: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

4th AvenueResurfacing Project

Page 9: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

FY20 Parking Budget:

• Fund 5.0 FTE positions• Equipment purchases:

• Patrol Vehicle• Dump truck with a vibrating box

• Continued funding for MTC services:• Routes 91 & 92• Sundowner Route 93

• Additional lot improvements

Page 10: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Other Notable Activities:

• Bus Service RFP• Parking is joining Facebook and Twitter!• [email protected]• AIMS received an update!!• On-line parking appeals now live• Extending students’ option to ‘bill account’ to spring

semester• A little branding in the 4th Avenue Parking Ramp….

Page 11: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/20194/26/2019

More brandingcoming next year!

Page 12: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Parking Appeals Committee

Committee Members:Jane Eckhoff Representing AFSCMEJoyce Zwack Representing AFSCMEJessie Cash Representing MMADaniel Huwe Representing MSUAASFKristy Modrow Representing MSUAASFHung-Chih Yu Representing IFONimantha Manamperi Representing IFOVacant Representing Students

If interested in filling a vacancy, contact Georgian Gross, our Parking Coordinator.

Page 13: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Permit Sales Will Begin April 23rd

for Students.

Employees will begin April 30th.

Watch your email and the Parking website for exact dates and times.

Page 14: Parking and Transportation4/26/2019 Program Successes: • Replaced parking ramp equipment with point- to-point encrypted (P2PE) credit card processors • Replaced pay lot equipment

4/26/2019

Open Forum for Input from the Public

Email thoughts or suggestions to:[email protected]