County of Fairfax, Virginia Fairfax County & Franconia-Springfield Parkways Alternatives Analysis & Long-Term Planning Study Public Information Meeting #1 October 2018

Upload: others

Post on 21-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Fairfax County & Franconia-Springfield Parkways

Alternatives Analysis & Long-Term Planning Study

Public Information Meeting #1

October 2018

Page 2: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

• Introductions

• Corridor History & Background

• Previous Studies

• Funded and Planned Corridor Improvements

• Project Goals and Objectives

• 2040 Comp Plan Traffic Analysis

• Public Input & Activities

• Questions/Comments

Agenda

Sunrise Valley Drive, Reston, VA, 1988; source: Google Earth Pro2

Page 3: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, VirginiaCorridor History and Background

• Planning began more than 40 years ago

3Franconia-Springfield Parkway

Page 4: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

• Nearly 25 years to construct

• Several studies of corridor during, and since

• This study intended to update Comprehensive Plan and set the course for improvements over the next 25 years

Corridor History and Background

1987 2006 20182012

Construction Begins

Construction Complete

Planning, Design,

ConstructionHOV Study

to

Long-Term Study

Route 286 Corridor Study

toVDOT Existing Conditions Study

4

VDOT Widening, US 29 to VA 123

Page 5: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

• Identified operational deficiencies, gaps in non-auto transportation network, and safety issues

• Developed more than 350 short-term recommendations– Operational

– Safety

– Bicycle/Pedestrian

– Transit

VDOT Existing Conditions Study (2016)

5

http://www.virginiadot.org/projects/northernvirginia/fairfax_county__franconia-springfield_pkwy.asp

Page 6: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Example Short-Term Improvement:FSP WB Ramps and Backlick Road

Install high visibility crosswalk, curb ramps,

pedestrian signals, and push buttons

Replace existing protected-permissive signal display

with a protected only signal display

Upgrade curb ramp

Proposed sign

Proposed yield bar

Proposed crosswalk

Shift stop bar for through and left turns back 10 feet

6

Page 7: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

• VDOT & FCDOT coordinating on implementation

and identification of potential funding sources

• VDOT has completed 49 pedestrian/traffic operations/safety improvements

• FCDOT has commenced work on improvements at Terminal Road, Spring Village Drive/Bonniemill Lane, and Sunrise Valley Drive

• FCDOT prioritizing remaining projects (capital intensive and/or requiring right-of-way) for inclusion in the County’s Transportation Priorities Plan (TPP)

Short-Term Improvements Status

7

Page 8: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Funded and Planned Corridor Improvements

• 2045 Financially Constrained Long-Range Transportation Plan (CLRP) – Adopted 2016– Regionally significant projects AND

– Identified funding plan over 20-30 years

• Fairfax County Comprehensive Plan (CP)– State-mandated planning guide

– Transportation Plan Map

– Additional improvements beyond CLRP

– Unconstrained

8

Page 9: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

CLRP

6 travel lanes 6 travel lanes

and 4 express lane

6 travel lanes6 travel

lanes

Metrorail Silver Line

4 travel lanes

9

NorthCorridor

Roadway Widening

Interchange ImprovementsHOV-3+

Page 10: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

CLRP

CPRoadway Widening

New Roadway

Interchange Improvements

HOV-3+

Roadway Widening

Interchange ImprovementsHOV-3+

NorthCorridor

10

6 travel lanes

4 travel lanes

4 travel lanes

Page 11: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, VirginiaCLRP

4 travel lanes

8 travel lanes

6 travel lanes

4 travel lanes

Roadway Widening

Interchange ImprovementsHOV-3+

11

SouthCorridors

Page 12: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

6 travel lanes

4 travel lanes

4 travel lanes

4 travel lanes

6 travel lanes

CLRP CPRoadway Widening

New Roadway

Interchange ImprovementsHOV-3+

Roadway Widening

Interchange ImprovementsHOV-3+

SouthCorridors

12

Page 13: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Prov

ide

for t

hrou

gh a

nd lo

cal m

ovem

ent

of p

eopl

e an

d go

ods

Incr

ease

tran

sit a

nd p

ed/b

ike

mod

es

Prov

ide

adeq

uate

loca

l acc

ess

Prov

ide

a ne

twor

k of

side

wal

ks a

nd tr

ails

Deve

lop

cost

-eff

ectiv

e im

prov

emen

ts

that

min

imize

neg

ativ

e im

pact

s

Min

imize

env

ironm

enta

l im

pact

s

Ensu

re s

afet

y of

all

mod

es

Incr

ease

ope

ratio

nal e

ffic

ienc

y

Link

land

use

with

tran

spor

tatio

n po

licie

s

Cont

ext s

ensi

tivity

No.

1Efficiently carry people and goods to provide congestion relief

X X X X

2 Maximize person throughput X X

3 Safely carry people and goods X X X

4Connect Fairfax County's communities and neighborhoods

X X X

5Minimize impacts to the natural and built environments

X X X

Countywide Objectives and Polices (from the Transportation Policy document of the Comprehensive Plan)

Study Goals (The Parkway will…)

Proposed Project Goals

13

• Used to compare alternatives

• Public input welcome

Page 14: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

• VDOT conducted Existing Conditions (2016)

• Developed 2040 traffic volumes

• Conducted traffic analysis of Weekday AM and PM peak period conditions

• Includes CLRP and CP network improvements

• Reported analysis results:– Travel times

– Average and maximum queues

– Average delays

2040 Comp Plan Traffic Analysis

14

Page 15: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, VirginiaCP 2040 AM Peak

DRAFT15

CP 2040 PM Peak

Key Improvements:

• 6 lanes throughout this segment

• HOV throughout this segment

• New and improved interchanges, including Sunrise Valley Drive and McLearen Road

• I-66 Express Lanes

LegendPeak Period Congestion (Queuing)

High Overall Intersection Delays

North

Page 16: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, VirginiaCP 2040 AM Peak

LegendPeak Period Congestion (Queuing)

High Overall Intersection Delays16

CP 2040 PM Peak

Central

Key Improvements:

• HOV lanes• Widening Route 123 to 6

lanes • New interchanges at Popes

Head and Shirley Gate Road

Page 17: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, VirginiaCP 2040 AM Peak

17

CP 2040 PM Peak

LegendPeak Period Congestion (Queuing)

High Overall Intersection Delays

South

Key Improvements:• FSP HOV lanes (2)• FSP widening to 8 lanes• New or improved interchanges, including

at FSP with Beulah Street and at FCP with John J. Kingman and FCP with Richmond Highway

• Backlick Road widening to 6 lanes

Page 18: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Resulting Traffic Operations with Comp Plan Network

• Operations vary, depending on location

• Reduced queuing and delay at locations with new interchanges

• New and improved roadway network and capacity improves circulation

• Some areas of congestion remain

18

Page 19: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Remaining Operational Challenges with CP Network

• Bottlenecks at the following locations:– Dulles Toll Road interchange

– Rugby Road

– Huntsman Boulevard

– Loisdale Road

• Congestion at locations downstream of capacity improvements

19

Page 20: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

High Occupancy Vehicle (HOV3+)• How best to utilize 5th & 6th Lanes

• HOV planned for some time in both CLRP & CP

• The Good:o Provides for shorter travel times for HOV3+

o Allows for better transit performance

• The Bad:o Results show low HOV3+ demand

o Congestion in non-HOV lanes

• Public input on options for HOV2+/HOV3+/HOT/Express lanes

20

Page 21: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Locations without adjacent shared-use path:1. FCP: Sugarland Road to

Heather Way

2. FCP: Monument Drive to Route 29

3. FCP: FSP to Loisdale Road

Missing Bike/Ped Connections

1

2

321

Page 22: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Transit• Fairfax County Transit Development Plan 2016-22

o Proposed New Cross-County, Limited Stop Route 496

o Herndon to Franconia-Springfield Metrorail Stations

o Serve Fort Belvoir North

o Weekday Service, 6:00 a.m. to 7:30 p.m.

o Headways 20 min peak, 30 min off-peak

o Forecasted 344,000 annual boardings

o To be further evaluated with Silver Line Phase 2

• Countywide Transit Network Study (2050 Horizon)o Express Bus Service

22

Page 23: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Proposed Fairfax Connector Route 496

23

Page 24: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Technology and Shared Mobility• Communications provide

connectivity between modes and vehicles

• Fairfax County is investigating technology, automation, and alternative mobility services

24

Image Credit: Shared Use Mobility Center

Image Credit: USDOT

Page 25: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

• Online survey conducted by FCDOT with more than 3,000 responses

• 8 questions related to existing and future use of the parkways

97%

17%23%

12%

1%0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Drive Walk Bike Transit Other (pleasespecify)

Travel Mode

How would you like to use the Parkways?*

Public Input November 2016 Survey Feedback

25*Respondents were able to select more than one travel mode; thus, the sum of all selections is greater than 100%

Page 26: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Public Input November 2016 Survey Feedback

57.2%

46.1%

29.6%25.4%

17.3%11.4%

5.0%

17.3%

0%

10%

20%

30%

40%

50%

60%

70%

What strategies would you like to see for meeting future transportation needs?

26

46.4%

48.3%

5.3%

Should the Parkways have a consistent design or have area-specific designs?

Consistent Design

Area Specific Designs

Suggest locations

DRAFT

Page 27: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Public Input Activities• Building off VDOT’s 2016 survey, we have

developed public input activities to solicit public feedback on future network options

• Web based survey at project website, similar to activities (for individuals who couldn’t attend meeting)

• This input will inform the development of alternatives to evaluate

• Web based survey activities will go live on Tuesday, October 16, 2018 for 30 days

27

Page 28: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Public Input Activities

28

• Corridor Travel Prioritieso Dot exercise – Rank each

corridor travel strategy

• Neighborhood Connectionso Map exercise – new multimodal

connection needs and desires

• Comprehensive Plan Mapo What should be added or

removed from the Comp Plan?

Page 29: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Next Steps & Schedule• Gather feedback (Tonight & Online - Oct 16 through

Nov 16, 2018)

• Develop, evaluate mitigation alternatives

• Report results, further discuss

(Outreach Winter 2019)

• Refine mitigation alternatives, further evaluate

• Present final results (Outreach Summer 2019)

• Recommendations & Prioritization (Fall 2019)

• Documentation (Winter 2020)

29

Page 30: Parkways Long-Term PublicMeetingPresentation …...Microsoft PowerPoint - Parkways_Long-Term_PublicMeetingPresentation_low res 2018-10-09 Author nparad Created Date 10/18/2018 2:53:09

County of Fairfax, Virginia

Questions?

Fairfax County DOT Project Manager:

Thomas Burke, P.E., AICP(703) 877-5600 TTY 711

[email protected]

Project website:https://www.fairfaxcounty.gov/transportation/

study/fairfax-county-parkway

30