parque productivo uruguay (ppu) canelones, uruguay conceptual approach & strategic orientation...
TRANSCRIPT
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Conceptual Approach & Strategic OrientationFinal Submission # 01December 2011
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Confidential & Controlled Copy
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Contents
2
# Domain Ref Topic of Guidelines
1Commercial Theme & Identity
1.1 Theme urban design, Images for urban details, envelops, and Look & Feel
1.2 Urban constraints and business demand Zones, usages, density, heights, coverage, etc
2 Plots Commercialization
2.1 Tabulated Plots, Areas Breakdown, Gross Built up Areas, Set Backs, Accessibilities, etc.
2.2 Sample of Planning & Building regulations, Sample of Plot’s Marketing Pack
3 Accessibility & Transportation
3.1 Terminals Proposals for Railways, Air Cargo, Trucks, Public Transportation, etc.
3.2 Administration of Gates, Emergency Service, Public Parking facilities, etc.
4 Infrastructure & Environment
4.1 Utilities and Services framework, Reservoirs development, Environmental design, etc.
4.2 Waste management, Energy solutions, Carbon trade, Regional integration, etc.
5 Urban Utilities & Services
5.1 Habitat Facilities, Shared Business Facilities, Community Facilities, etc.
5.2 Areas of Urban Improvements & Excellence
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Schematic Design Overview
3These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
4These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Commercial Theme & Identity
1
Market Facts 1
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
5These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Parks Advantages Disadvantages
1. PROGRESO / LAS PIEDRAS Very good accessesLimited industrial sectors. Area reserved for agro-industries.Limited Infrastructure of services.
2. COLÓN AND LA PAZVery good locationVery good development potential.Few limitations for industrial uses.Abundant availability of land.
Limited infrastructure of services.
3. NUEVO PARÍS / CERRO / LA TEJA
Excellent accesses.Industrial Zone par excellence.Good infrastructure of services.
Various settlements established.
4. MONTEVIDEO PORT / BELLA VISTA AND AGUADA
Close to the port and Montevideo.Transportation means.
Difficulties due to high vehicular density.High land value.
5. CARRASCO ROADWAY / NORTH CARRASCO
Closeness to the AirportGood accesses and transportation means.Good infrastructure of services.
Accesses are not so direct.Is on an avenue within a city
6. CARRASCO AIRPORT Closeness to Airport and Zonamérica.Good accesses.
Limited industrial sectors.Distance to the port and Montevideo.
7. ZONAMÉRICA / COLONIA NICOLICH [NICOLICH COLONY]
Very good infrastructureCloseness to the airportGood access routes.
Limited industrial sectors.Distance to the port and Montevideo.Only sell to countries outside Mercosur.
8. MALDONADO ROADWAYGood accesses.° Closeness to Airport and private condominiums.
Distance to the port and Montevideo.
9. JOAQUÍN SUÁREZ
Proximity to the railway.Services.Proximity to urban centers.Location and accesses.Good availability of labor in the zone.
ByCOLLIERS INTERNATIONALIndustrial Market Study for UruguayOctober 31, 2011
The Industrial Parks of Uruguay
Market Facts 2
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
6
ByCOLLIERS INTERNATIONALIndustrial Market Study for UruguayOctober 31, 2011
EXISTING INDUSTRIAL PARKS IN CANELONES AND MONTEVIDEOParks Advantages Infrastructure Area
1. POLO OESTE (FRIMOSA)This venture is not included in the provisions of law17,547 that regulates the Industrial Parks. Therefore,from a formal point of view, this is not an IndustrialPark.
To be determined.Total land area: 70 HectaresMinimum plot area: 3,000 sq.m.Maximum plot area: 94,000 sq.m.
2. PTIC PARQUETECNOLOGICOINDUSTRIAL DEL CERRO
Municipal Site (Ex Cerro Cold Storage Plant).The companies installed have loan contracts with themunicipal administration.Companies are allowed
Perimeter Wall (to be constructed)CCTV
Total land area: 17 Hectarescovered spacesMinimum area: 80 sq.m. Maximum plot area: 20,000 sq.m.
3. ZONA ESTE PARQUEINDUSTRIAL Y LOGISTICOPLAZA INDUSTRIAL SA
Currently in approval process: warehouses, poweravailability, treatment plant for primary sanitation, andtelecommunications center.
Perimeter security and Access controlPrivate vigilance serviceFire suppression safety in common areasMedical emergenciesImport - Export
Total land area: 14 HectaresMinimum plot area: 7,500 sq.m.Maximum plot area: 17,000 sq.m.
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Site Analysis
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
The Site is 146 Hectares1,460,000 m2
Local Wind
7This is carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Urban Design
Approach to Proposed Urban Design
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
AdminOSS
Services911
Light & Logistics IndustriesElectronics
ManufacturingLogistics & Distribution
Heavy IndustriesAutomotivesMetal Works
Textiles & Garments
Business SupportIT Development
OutsourcingEntrepreneurs
Agro Processing F&B
RetailStationary
New Alternate Access Road
CrossingLocal Road
Reservoir Pond
Air Cargo Yard Freight Yard
Railways Station
Trucks Terminal
CrossingLocal Road
Environmental Buffer
8These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Summary of RE Products
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
9
Administration 55,542
Area m2
69
Traffic nos.
321
Power KW
Agro-Processing 175,216 1,586 5,358
Light Industry & Logistics 512,000 725 9,470
Heavy Industry 538,000 685 23,100
Business Support 130,000 644 3,762
500
Solar KWH
5,165
9,317
18,845
2,069
8,036
GFA m2
131,358
286,718
352,978
55,003
1,410,758 3,709 42,011 35,896835,093
9
Plots
29
54
23
22
137
161
Population
3,757
1,694
1,540
1,505
8,657
Total Plot Area m2 1,410,758
Total Gross Floor Area (GFA) m2 835,093
Total Infrastructure Area m2 546,678
Total Landscape Area m2 268,240
Total Population 8,657
Estimated Total Cost of Infrastructure $ 27,333,900
Traffic Generation at Peak Hour 3,709
Energy & Power Demand KW 42,011
59%
39%
2%
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Real Estate Statistics
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
10These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
4%12%
36%
38%
9%
Land Allocation
AdministrationProcessing IndustriesLight Industries & LogisticsHeavy IndustriesBusiness Support
1%16%
34%
42%
7%
GFA Allocation
AdministrationProcessing IndustriesLight Industries & LogisticsHeavy IndustriesBusiness Support
7%21%
39%
17%
16%
Plot Allocation
AdministrationProcessing IndustriesLight Industries & LogisticsHeavy IndustriesBusiness Support
Administration Processing Industries
Light Industries & Logistics
Heavy Industries Business Support
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Plot Area m2
MaxMinAvr
Administrati
on
Proces
sing I
ndustries
Light In
dustries
& Lo
gistics
Heavy
Industr
ies
Business
Support
0500
1,0001,5002,0002,5003,0003,5004,000
Daily Dynamics
PopulationVehicles
Making a Difference
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
11
Pre-defined Strategic Usage and Utilities
Pre-planned Integrated Businesses
State of the Art OSS, Facilities and Installations
Advanced Monitoring and Control Systems
Futuristic Infrastructure
Connectivity to Surface, Air & Sea Freight
Proximity to Population Centers
Friendly Environment & Administration
Readiness for Change & Improvement
Regional & International Magnet
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Consent on the Park is unrelated to detailed consent on plots
Processing time for the investors may goes as much as 14 months
No coordination or integration among proposed activities and lines of business
Risks are higher on Plot Investors, which create hurdles for interests and operations
Development of the Park is conceptual rather than engineered, which is unfriendly to investors
Uncertainties are high with regard to infrastructure and facilities
The Current States: Ethraa Added Value:
Theme Snapshots
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
12These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Thank You..!
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
13These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Conceptual Approach & Strategic OrientationFinal Submission # 02December 2011
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Confidential & Controlled Copy
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Contents
15
# Domain Ref Topic of Guidelines
1 Commercial Theme & Identity
1.1 Theme urban design, Images for urban details, envelops, and Look & Feel
1.2 Urban constraints and business demand Zones, usages, density, heights, coverage, etc
2Plots Commercialization
2.1 Tabulated Plots, Areas Breakdown, Gross Built up Areas, Set Backs, Accessibilities, etc.
2.2 Sample of Planning & Building regulations, Sample of Plot’s Marketing Pack
3 Accessibility & Transportation
3.1 Terminals Proposals for Railways, Air Cargo, Trucks, Public Transportation, etc.
3.2 Administration of Gates, Emergency Service, Public Parking facilities, etc.
4 Infrastructure & Environment
4.1 Utilities and Services framework, Reservoirs development, Environmental design, etc.
4.2 Waste management, Energy solutions, Carbon trade, Regional integration, etc.
5 Urban Utilities & Services
5.1 Habitat Facilities, Shared Business Facilities, Community Facilities, etc.
5.2 Areas of Urban Improvements & Excellence
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Schematic Design Overview
16These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
17These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Plots Commercialization
2
Z001: Administration Zone
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
18
ICT Operation Ctr
Crime Prevention Ctr
Traffic Control Ctr
First Aid Ctr Fire Bridge Ctr
Access Control Ctr
Emergency Service
Border Control Ctr
PPU Management PPU One Stop Shop Government Center Operations Center
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Z002: Agro-Processing Zone
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
19
Food Products
Meat Products
Confections Products
Catering Products
Dairy Products
Flour Products
Soft Drinks Products
Packing Products
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Food Packing Products
Z003: Light Industries & Logistics Zone
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
20
Consumer Products
Furniture Products
Packing Products
Logistics Services Leather Products
Garments Products
Chemical Products
Printing Products
Tools Manufacturing Shipping & Forwarding Textile Products Detergents Products
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Z004: Heavy Industries Zone
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
21
Auto Parts
Metal Products
Building Materials
Heavy Equipments
Metal Processing
Industrial Chemicals
Industrial Equipments
Tools & Accessories
Engines & Motors
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Z005: Business Support Zone
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
22
Financial Service
Media Studios
Professional Leagues
Business Centers Legal Service
Data Centers
Retail Service
Commercial Offices
Call Centers Business Processing Training Centers Consultancies
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Areas Tabulations: Z001
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
23
IdentificationArea
m2Coverage
m2GFA
m2No. of Floors
Floor Area m2
Capita Set Backs m Landscape Car M'bik B-Psgnr TruckVehicles
Power KW
SolarKWH
Code Particular Function 50 Front Rare Side-1 Side-2 m2 % 10% 30% 60% 2,500 40 165
Administration Cluster 55,542 14% 6,201 11% 96
Plots 38,023 18% 8,036 9 6,664 161 945 2% 16 48 2 3 69 321 550
Infrastructure 17,519 32% 5,256 30% 23% 69% 3% 5%
ADM001 Plot 1 OSS 2,987 41% 2,761 3 1,227 55 20 20 10 10 325 11% 6 17 33 1 23 110 101
ADM002 Plot 2 Transit Terminal 6,860 0% 0 0 30 0 10 10 10 10 620 9% 0 0 0 0 0 0 2
ADM003 Plot 3 Emergency St. 2,169 35% 576 1 768 12 5 70 10 10 0 0% 1 3 7 0 5 23 63
ADM004 Plot 4 Operations Ctr-1 3,076 39% 2,700 3 1,200 54 5 70 10 10 0 0% 5 16 32 1 23 108 99
ADM005 Plot 5 Substation (1) 2,010 37% 0 0 738 0 5 70 10 10 0 0% 0 0 0 0 0 0 61
ADM006 Plot 6 Substation (2) 2,077 66% 0 0 1,368 0 2 10 2 10 0 0% 0 0 0 0 0 0 113
ADM007 Plot 7 Operations Ctr-2 2,657 50% 2,000 2 1,333 40 2 10 2 10 0 0% 4 12 24 1 17 80 110
ADM008 Plot 8 Store Yard 4,087 0% 0 0 0 0 0 0 0 0 0 0% 0 0 0 0 0 0 0
ADM009 Plot 9 Truck Terminal 12,100 0% 0 0 0 0 0 0 0 0 0 0% 0 0 0 0 0 0 0
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Areas Tabulations: Z002
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
24
IdentificationArea
m2Coverage
m2GFA
m2No. of Floors
Floor Area m2
Capita Set Backs m Landscape Car M'bik B-Psgnr TruckVehicles
Power KW
Solar KWH
Code Particular Function 25 Front Rare Side-1 Side-2 m2 % 10% 30% 60% 2,500 75 165
Agro Processing Cluster 175,216 54% 23,833 14% 2,254
Plots 131,358 48% 93,914 58 62,609 3,757 10,676 8% 376 1,127 45 38 1,585 5,358 5,165
Infrastructure 43,858 25% 13,157 30% 24% 71% 3% 2%
PRS001 Plot 1 Processing 8,057 62% 7,487 2 4,991 299 2 10 10 10 293 4% 30 90 180 3 123 561 412PRS002 Plot 2 Processing 4,814 49% 3,563 2 2,375 143 2 10 10 10 207 4% 14 43 86 1 58 267 196PRS003 Plot 3 Processing 3,791 48% 2,741 2 1,827 110 2 10 10 10 208 5% 11 33 66 1 45 206 151PRS004 Plot 4 Processing 4,152 51% 3,206 2 2,137 128 2 10 10 10 230 6% 13 38 77 1 53 240 176PRS005 Plot 5 Processing 3,791 48% 2,741 2 1,827 110 2 10 10 10 208 5% 11 33 66 1 45 206 151PRS006 Plot 6 Processing 5,402 53% 4,293 2 2,862 172 2 10 10 10 230 4% 17 52 103 2 70 322 236PRS007 Plot 7 Processing 6,854 35% 3,636 2 2,424 145 2 10 10 10 1,343 20% 15 44 87 1 60 273 200PRS008 Plot 8 Processing 3,025 48% 2,183 2 1,455 87 2 10 10 10 230 8% 9 26 52 1 36 164 120PRS009 Plot 9 Processing 2,488 39% 1,455 2 970 58 2 10 10 10 209 8% 6 17 35 1 24 109 80PRS010 Plot 10 Processing 3,025 48% 2,183 2 1,455 87 2 10 10 10 230 8% 9 26 52 1 36 164 120PRS011 Plot 11 Processing 3,584 41% 2,183 2 1,455 87 2 10 10 10 225 6% 9 26 52 1 36 164 120PRS012 Plot 12 Processing 8,121 36% 4,328 2 2,885 173 2 10 10 10 940 12% 17 52 104 2 71 325 238PRS013 Plot 13 Processing 6,668 50% 5,004 2 3,336 200 2 10 10 10 933 14% 20 60 120 2 82 375 275PRS014 Plot 14 Processing 4,618 46% 3,209 2 2,139 128 2 10 10 10 608 13% 13 39 77 1 53 241 176PRS015 Plot 15 Processing 2,860 42% 1,814 2 1,209 73 2 10 10 10 347 12% 7 22 44 1 30 136 100PRS016 Plot 16 Processing 2,956 48% 2,121 2 1,414 85 2 10 10 10 205 7% 8 25 51 1 35 159 117PRS017 Plot 17 Processing 2,790 43% 1,815 2 1,210 73 2 10 10 10 262 9% 7 22 44 1 30 136 100PRS018 Plot 18 Processing 10,432 46% 7,184 2 4,789 287 2 10 10 10 1,588 15% 29 86 172 3 118 539 395PRS019 Plot 19 Processing 2,802 44% 1,866 2 1,244 75 2 10 10 10 271 10% 7 22 45 1 31 140 103PRS020 Plot 20 Processing 3,128 47% 2,183 2 1,455 87 2 10 10 10 317 10% 9 26 52 1 36 164 120PRS021 Plot 21 Processing 3,522 50% 2,619 2 1,746 105 2 10 10 10 364 10% 10 31 63 1 43 196 144PRS022 Plot 22 Processing 4,811 50% 3,638 2 2,425 146 2 10 10 10 169 4% 15 44 87 1 60 273 200PRS023 Plot 23 Processing 4,275 52% 3,308 2 2,205 132 2 10 10 10 138 3% 13 40 79 1 54 248 182PRS024 Plot 24 Processing 4,275 52% 3,308 2 2,205 132 2 10 10 10 138 3% 13 40 79 1 54 248 182PRS025 Plot 25 Processing 4,811 50% 3,638 2 2,425 146 2 10 10 10 169 4% 15 44 87 1 60 273 200PRS026 Plot 26 Processing 4,403 50% 3,273 2 2,182 131 2 10 10 10 169 4% 13 39 79 1 54 245 180PRS027 Plot 27 Processing 3,750 50% 2,835 2 1,890 113 2 10 10 10 138 4% 11 34 68 1 46 213 156PRS028 Plot 28 Processing 3,750 50% 2,835 2 1,890 113 2 10 10 10 138 4% 11 34 68 1 46 213 156PRS029 Plot 29 Processing 4,403 50% 3,273 2 2,182 131 2 10 10 10 169 4% 13 39 79 1 54 245 180
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Areas Tabulations: Z003
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
25
Identification Area m2
Coverage m2
GFA m2
No. of Floors
Floor Area m2
Capita Set Backs m Landscape Car M'bik B-Psgnr TruckVehicles
Power kw Solar kwh
100 165Code Particular Function 50 Front Rare Side-1 Side-2 m2 % 10% 30% 60% 3,000
Light Industry & Logistics Cluster 512,000 17% 101,588 20% 1,016
Plots 286,718 39% 84,704 54 112,939 1,694 11,475 4% 169 508 20 28 726 8,470 9,317
Infrastructure 225,282 44% 90,113 40% 23% 70% 3% 4%
LGT001 Plot 1 Light Industry 10,050 41% 3,123 1 4,164 62 2 10 10 20 1,666 17% 6 19 37 1 26 312 344
HVY002 Plot 2 Light Industry 5,402 53% 2,147 1 2,862 43 2 10 10 10 230 4% 4 13 26 1 18 215 236
HVY003 Plot 3 Light Industry 3,791 48% 1,370 1 1,827 27 2 10 10 10 208 5% 3 8 16 0 11 137 151
HVY004 Plot 4 Light Industry 3,791 48% 1,370 1 1,827 27 2 10 10 10 208 5% 3 8 16 0 11 137 151
HVY005 Plot 5 Light Industry 3,791 48% 1,370 1 1,827 27 2 10 10 10 208 5% 3 8 16 0 11 137 151
HVY006 Plot 6 Light Industry 5,402 53% 2,147 1 2,862 43 2 10 10 10 230 4% 4 13 26 1 18 215 236
HVY007 Plot 7 Light Industry 4,403 50% 1,637 1 2,182 33 2 10 10 20 169 4% 3 10 20 1 14 164 180
HVY008 Plot 8 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156
HVY009 Plot 9 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156
HVY010 Plot 10 Light Industry 3,310 46% 1,140 1 1,520 23 2 10 10 10 120 4% 2 7 14 0 10 114 125
HVY011 Plot 11 Light Industry 3,310 46% 1,140 1 1,520 23 2 10 10 10 120 4% 2 7 14 0 10 114 125
HVY012 Plot 12 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156
HVY013 Plot 13 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156
HVY014 Plot 14 Light Industry 4,403 50% 1,637 1 2,182 33 2 10 10 20 169 4% 3 10 20 1 14 164 180
HVY015 Plot 15 Light Industry 7,241 58% 3,123 1 4,164 62 2 10 10 10 251 3% 6 19 37 1 26 312 344
HVY016 Plot 16 Light Industry 6,661 55% 2,728 1 3,637 55 2 10 10 10 230 3% 5 16 33 1 23 273 300
HVY017 Plot 17 Light Industry 7,241 58% 3,123 1 4,164 62 2 10 10 10 251 3% 6 19 37 1 26 312 344
HVY018 Plot 18 Light Industry 3,025 48% 1,091 1 1,455 22 2 10 10 10 138 5% 2 7 13 0 9 109 120
HVY019 Plot 19 Light Industry 3,025 48% 1,091 1 1,455 22 2 10 10 10 138 5% 2 7 13 0 9 109 120
HVY020 Plot 20 Light Industry 3,025 48% 1,091 1 1,455 22 2 10 10 10 138 5% 2 7 13 0 9 109 120
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Areas Tabulations: Z003 (Cont’d)
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
26
HVY021 Plot 21 Light Industry 3,025 48% 1,091 1 1,455 22 2 10 10 10 138 5% 2 7 13 0 9 109 120HVY022 Plot 22 Light Industry 3,025 48% 1,091 1 1,455 22 2 10 10 10 138 5% 2 7 13 0 9 109 120HVY023 Plot 23 Light Industry 3,025 48% 1,091 1 1,455 22 2 10 10 10 138 5% 2 7 13 0 9 109 120HVY024 Plot 24 Light Industry 4,161 51% 1,603 1 2,137 32 2 10 10 10 230 6% 3 10 19 1 13 160 176HVY025 Plot 25 Light Industry 3,791 48% 1,370 1 1,827 27 2 10 10 10 208 5% 3 8 16 0 11 137 151HVY026 Plot 26 Light Industry 5,402 53% 2,147 1 2,862 43 2 10 10 10 230 4% 4 13 26 1 18 215 236HVY027 Plot 27 Light Industry 7,241 58% 3,123 1 4,164 62 2 10 10 10 251 3% 6 19 37 1 26 312 344HVY028 Plot 28 Light Industry 6,661 55% 2,728 1 3,637 55 2 10 10 10 230 3% 5 16 33 1 23 273 300HVY029 Plot 29 Light Industry 7,241 58% 3,123 1 4,164 62 2 10 10 10 251 3% 6 19 37 1 26 312 344HVY030 Plot 30 Light Industry 5,402 53% 2,147 1 2,862 43 2 10 10 10 230 4% 4 13 26 1 18 215 236HVY031 Plot 31 Light Industry 3,791 48% 1,370 1 1,827 27 2 10 10 10 208 5% 3 8 16 0 11 137 151HVY032 Plot 32 Light Industry 4,161 51% 1,603 1 2,137 32 2 10 10 10 230 6% 3 10 19 1 13 160 176HVY033 Plot 33 Light Industry 3,791 48% 1,370 1 1,827 27 2 10 10 10 208 5% 3 8 16 0 11 137 151HVY034 Plot 34 Light Industry 4,403 50% 1,637 1 2,182 33 2 10 10 20 169 4% 3 10 20 1 14 164 180HVY035 Plot 35 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156HVY036 Plot 36 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156HVY037 Plot 37 Light Industry 3,310 46% 1,140 1 1,520 23 2 10 10 10 120 4% 2 7 14 0 10 114 125HVY038 Plot 38 Light Industry 3,310 46% 1,140 1 1,520 23 2 10 10 10 120 4% 2 7 14 0 10 114 125HVY039 Plot 39 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156HVY040 Plot 40 Light Industry 3,750 50% 1,418 1 1,890 28 2 10 10 10 138 4% 3 9 17 0 12 142 156HVY041 Plot 41 Light Industry 4,403 50% 1,637 1 2,182 33 2 10 10 20 169 4% 3 10 20 1 14 164 180HVY042 Plot 42 Retail 3,176 82% 1,952 1 2,603 39 2 2 2 2 0 0% 4 12 23 1 16 195 215HVY043 Plot 43 Retail 3,176 82% 1,952 1 2,603 39 2 2 2 2 0 0% 4 12 23 1 16 195 215HVY044 Plot 44 Light Industry 2,399 45% 812 1 1,082 16 5 10 5 10 95 4% 2 5 10 0 7 81 89HVY045 Plot 45 Light Industry 3,338 54% 1,361 1 1,814 27 5 10 5 10 137 4% 3 8 16 0 11 136 150HVY046 Plot 46 Light Industry 3,338 54% 1,361 1 1,814 27 5 10 5 10 137 4% 3 8 16 0 11 136 150HVY047 Plot 47 Light Industry 3,338 54% 1,361 1 1,814 27 5 10 5 10 137 4% 3 8 16 0 11 136 150HVY048 Plot 48 Light Industry 3,338 54% 1,361 1 1,814 27 5 10 5 10 137 4% 3 8 16 0 11 136 150HVY049 Plot 49 Light Industry 3,338 54% 1,361 1 1,814 27 5 10 5 10 137 4% 3 8 16 0 11 136 150HVY050 Plot 50 Light Industry 3,338 54% 1,361 1 1,814 27 5 10 5 10 137 4% 3 8 16 0 11 136 150HVY051 Plot 51 Light Industry 8,239 28% 1,748 1 2,331 35 5 10 10 10 1,712 21% 3 10 21 1 15 175 192HVY052 Plot 52 Freight Yard 32,050 0% 0 1 0 0 5 5 5 5 0 0% 0 0 0 0 0 0 0HVY053 Plot 53 Railways St. 16,725 0% 0 1 0 0 5 5 5 5 0 0% 0 0 0 0 0 0 0HVY054 Plot 54 Air Cargo Yard 16,911 0% 0 1 0 0 5 5 5 5 0 0% 0 0 0 0 0 0 0
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Areas Tabulations: Z004
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
27
Identification Area m2
Coverage m2
GFA m2
No. of Floors
Floor Area m2
Capita Set Backs m Landscape Car M'bik B-Psgnr TruckVehicles
Power KW
Solar KWH
Code Particular Function 100 Front Rare Side-1 Side-2 m2 % 10% 30% 60% 3,000 150 165
Heavy Industry Cluster 538,000 29% 109,931 20% 924
Plots 354,997 58% 153,999 22 205,332 1,540 36,730 10% 154 462 18 51 686 23,100 18,845
Infrastructure 183,003 34% 73,201 40% 22% 67% 3% 7%
HVY001 Plot 1 Heavy Industry 31,502 53% 12,488 1 16,650 125 10 20 20 40 3,427 11% 12 37 75 4 54 1,873 1,374
HVY002 Plot 2 Heavy Industry 19,776 58% 8,545 1 11,393 85 10 10 20 20 2,698 14% 9 26 51 3 37 1,282 940
HVY003 Plot 3 Heavy Industry 11,979 54% 4,860 1 6,480 49 10 10 20 20 1,495 12% 5 15 29 2 21 729 535
HVY004 Plot 4 Heavy Industry 19,124 59% 8,393 1 11,191 84 30 10 10 10 1,744 9% 8 25 50 3 36 1,259 923
HVY005 Plot 5 Heavy Industry 9,967 55% 4,134 1 5,512 41 20 10 10 10 968 10% 4 12 25 1 18 620 455
HVY006 Plot 6 Heavy Industry 15,521 58% 6,774 1 9,032 68 20 10 20 20 1,809 12% 7 20 41 2 29 1,016 745
HVY007 Plot 7 Heavy Industry 20,828 59% 9,265 1 12,353 93 20 5 20 20 1,134 5% 9 28 56 3 40 1,390 1,019
HVY008 Plot 8 Heavy Industry 19,307 57% 8,318 1 11,091 83 20 5 20 20 1,134 6% 8 25 50 3 36 1,248 915
HVY009 Plot 9 Heavy Industry 24,663 55% 10,146 1 13,528 101 20 20 20 20 2,179 9% 10 30 61 3 44 1,522 1,116
HVY010 Plot 10 Heavy Industry 28,065 59% 12,341 1 16,454 123 20 20 20 20 2,375 8% 12 37 74 4 53 1,851 1,357
HVY011 Plot 11 Heavy Industry 15,126 56% 6,363 1 8,484 64 30 10 10 10 1,582 10% 6 19 38 2 28 954 700
HVY012 Plot 12 Heavy Industry 11,879 54% 4,850 1 6,466 48 20 10 10 10 1,485 13% 5 15 29 2 21 727 533
HVY013 Plot 13 Heavy Industry 10,604 54% 4,264 1 5,685 43 30 10 10 10 1,160 11% 4 13 26 1 18 640 469
HVY014 Plot 14 Heavy Industry 7,988 62% 3,713 1 4,950 37 10 10 10 10 1,226 15% 4 11 22 1 16 557 408
HVY015 Plot 15 Heavy Industry 7,988 62% 3,713 1 4,950 37 10 10 10 10 1,226 15% 4 11 22 1 16 557 408
HVY016 Plot 16 Heavy Industry 9,765 48% 3,526 1 4,701 35 30 10 10 10 1,077 11% 4 11 21 1 15 529 388
HVY017 Plot 17 Heavy Industry 10,459 63% 4,915 1 6,553 49 10 10 10 10 1,336 13% 5 15 29 2 21 737 541
HVY018 Plot 18 Heavy Industry 13,153 54% 5,288 1 7,051 53 20 10 10 30 1,479 11% 5 16 32 2 23 793 582
HVY019 Plot 19 Heavy Industry 7,988 62% 3,713 1 4,950 37 10 10 10 10 1,226 15% 4 11 22 1 16 557 408
HVY020 Plot 20 Heavy Industry 7,988 62% 3,713 1 4,950 37 10 10 10 10 1,226 15% 4 11 22 1 16 557 408
HVY021 Plot 21 Heavy Industry 18,150 58% 7,898 1 10,530 79 20 10 10 10 1,995 11% 8 24 47 3 34 1,185 869
HVY022 Plot 22 Heavy Industry 33,177 67% 16,784 1 22,378 168 10 10 20 20 2,749 8% 17 50 101 6 73 2,518 1,846
HVY023 Plot 23 Heavy Industry 37,853 61% 17,320 1 23,093 173 10 10 20 30 3,869 10% 17 52 104 6 75 2,598 1,905
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Areas Tabulations: Z005
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
28
Identification Area m2
Coverage m2
GFA m2
No. of Floors
Floor Area m2
Capita Set Backs m Landscape Car M'bik B-Psgnr TruckVehicles
Power KW
Solar KWH
Code Particular Function 50 Front Rare Side-1 Side-2 m2 % 10% 30% 60% 3,000 50 165
Business Support Cluster 130,000 58% 37,461 29% 903
Plots 55,003 46% 75,240 88 25,080 1,505 14,962 27% 150 451 18 25 645 3,762 2,069
Infrastructure 74,997 58% 22,499 30% 23% 70% 3% 4%
BZP001 Plot 1 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP002 Plot 2 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP003 Plot 3 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP004 Plot 4 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP005 Plot 5 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP006 Plot 6 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP007 Plot 7 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP008 Plot 8 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP009 Plot 9 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP010 Plot 10 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP011 Plot 11 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP012 Plot 12 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP013 Plot 13 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP014 Plot 14 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP015 Plot 15 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP016 Plot 16 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP017 Plot 17 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP018 Plot 18 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP019 Plot 19 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP020 Plot 20 Office 2,500 46% 3,420 4 1,140 68 2 10 10 10 680 27% 7 21 41 1 29 171 94
BZP021 Plot 21 Office 2,501 46% 3,420 4 1,140 68 2 10 10 10 681 27% 7 21 41 1 29 171 94
BZP022 Plot 22 Office 2,502 46% 3,420 4 1,140 68 2 10 10 10 681 27% 7 21 41 1 29 171 94
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Administration Property Models
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
29These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Processing Property Models
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
30These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Light Industry & Logistics Property Models
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
31These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Heavy Industry Property Models
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
32These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Business Support Property Models
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
33These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Introduction to Planning Guidelines (Summary)
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
34
Principles
AspirationExcellence of urban development complement to national ambition
VisionUruguayan economy contributes to raising stars of Southern America
PurposeMagnet for int’l business and local industrial development
PPUA New version of delivering the comprehensive and integrated developments
Open Space
SustainabilityElements to assure the growth and conservation of healthy greenish area
BuffersPlants are ideally used to protect plots and enhance environment
RecreationalThe creative Urbanism has lots of added value for people preparedness
Water BodiesThe magic of water bodies will enable spiritual balance and cheerful atmosphere
Context
RegionalCrowning the planning concepts of Uruguayan industrial parks
LocalUtilize and capitalize on the local resources for socioeconomic success
Site ConfigurationInterpret the constraints into feasible and successful business opportunities
Urban FrameworkPlan and design adequate and practical details for the urban breakthrough
Amenities
CommunityThe direct requirements for the public convenience and comfort
EmergencyPreparedness against the unplanned risks, hazards or violations
FacilitiesCritical and physical aggregates for activities to be performed
SecurityFramework, Personnel and tools to provide physical control of PPU; preventing crimes & enforcing order
Zoning
Land UsePPU will have predefined land use for each plot to shorten processing time
CommercialityThe more pros & cons are predefined, the assure its commercialization
TransitRegional and local public transit are integrated with the Park Transit
PopulationPeople are the critical soft resources for any success, therefore they are carefully considered.
Engineering
Specifications, delivery protocols and quantities of physical inputs and outputs of intended buildings
Structural IntegrityEngineering CodesWater SupplyPower SupplySewage TreatmentDrainageICT ManagementWaste ManagementDisposals
Mobility
VehicularLong vehicles are considered in all maneuvering schemes and designs
Road ProfilesMinimized profiles with single direction to avoid accidents and jams
ParkingParking will be used for loading and unloading to maximize plot use
PedestrianSide walkways are designed for all categories with sufficient accessories and furniture
Architectural
StreetsVision and Standards for the outdoor environment
ExteriorsStrategy and codes for visual comfort and convenience of buildings
PlantationSustainability of landscape and plantation of public& private spaces
Urban FurnitureAdding life to the public and open spaces, considering the physical needs of inhabitants
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
The Plot Pack (Sample)
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
35
Identifications
Facilities and Supplies
Commercial Use
Commercial Terms
Plot ID: XXXXXXXXXZone: XXXXXXXXXXXXXPlot Area: xxxxx.xxx m2Coverage Area: xxxx.xxx m2Allowed GFA: xxxx.xxx m2Allowed FAR: xxx.xxxGIS Coordinates:A-xx.xx.xxxxxB-xx.xx.xxxxxC-xx.xx.xxxxxD-xx.xx.xxxxxSet Backs:Front: xx.xxxx mRare: xx.xxxx mSide-1: xx.xxxx mSide-2: xx.xxxx mGate Level: +xx.xxx m
Permitted Use:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Power Supply:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Potable Water Supply:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Gas Supply:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
ICT Supply:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Non-potable water Supply:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Broad Band Supply:Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Sewage Disposal:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Drainage Disposal:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Solid Waste Disposal:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Hazardous Waste Disposal:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
CO2 Omission:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Gas Omissions:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Street No. xxx
Plot No. xxx
GIS xx.xx.xxxxxxGIS xx.xx.xxxxxx
GIS xx.xx.xxxxxx GIS xx.xx.xxxxxx
Area xxxx.xxx m2
Border xxx.xxx m
Border xxx.xxx m
Bord
er x
xx.x
xx m
Bord
er x
xx.x
xx m
xx.xxx m
xx.x
xx m
xx.x
xx m
Coverage Parameter
Plot
No.
xxx
Plot
No.
xxx
Plot No. xxx
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
XxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
XxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
PPU Industrial ZoneXxxxxxxxxxxxxxxxxxxxxxxx
Facilities Management:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Operations:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Personnel:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Design Development:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Construction Activities:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Fitness Certifications:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Sales / Lease:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Legal Enngagement:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
Marketing & Branding:XxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxx
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Thank You..!
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
36These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Conceptual Approach & Strategic OrientationFinal Submission # 03January 2012
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Confidential & Controlled Copy
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Contents
38
# Domain Ref Topic of Guidelines
1 Commercial Theme & Identity
1.1 Theme urban design, Images for urban details, envelops, and Look & Feel
1.2 Urban constraints and business demand Zones, usages, density, heights, coverage, etc
2 Plots Commercialization
2.1 Tabulated Plots, Areas Breakdown, Gross Built up Areas, Set Backs, Accessibilities, etc.
2.2 Sample of Planning & Building regulations, Sample of Plot’s Marketing Pack
3 Accessibility & Transportation
3.1 Terminals Proposals for Railways, Air Cargo, Trucks, Public Transportation, etc.
3.2 Administration of Gates, Emergency Service, Public Parking facilities, etc.
4 Infrastructure & Environment
4.1 Utilities and Services framework, Reservoirs development, Environmental design, etc.
4.2 Waste management, Energy solutions, Carbon trade, Regional integration, etc.
5 Urban Utilities & Services
5.1 Habitat Facilities, Shared Business Facilities, Community Facilities, etc.
5.2 Areas of Urban Improvements & Excellence
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Schematic Design Overview
39These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
40These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Accessibility & Transportation
3
Proposed Traffic & Accessibility
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
41
The additional traffic generation from PPU requires additional access points and routes to avoid disturbing the surrounding urban fabrics and violate the expectations of new urban industrial center of PPU. Negotiations and consent of authorities are required.
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Conceptual Road Profiles
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
E-002
E-004
E-008
42
Unified and minimized road profiles of PPU, for easy standard processing and management
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Public Car Parking
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
43These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
No center-islands in roads
Maneuvering fits for Long Vehicles
3,800 Demand & 5,000 Parking Lots
Public Transport
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, UruguayPARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Bus Stop
Local Route
Regional Route
3,200 m
44These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Average 350m between Bus stops
$0.2 Ticket on Corporates Subscriptions
5 Days a weekDaily Service 7am-7pm
Annual 2.6mln passengers
Available for AnnualCommercial Concession
Fleet of 20 Buses
Railways Terminal
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
45These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Connection between PPU and Population centers
Station will serve the population of Canelones
Utilizing an existing single rail track
Freight Terminal
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
46These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Next to Proposed PPU Train Station
Connected to Air Port and Sea Ports
Connected to Logistic & Consumers Hubs
Critical support to Industrial Value Chains
Reduction of heavy traffic generated by PPU
Enables faster and speedy supply chain cycles
Facilitate local & international exports
Temporary storage facilities
Air-Cargo Terminal
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
47These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Forw
ardi
ng
Rece
ivin
g
Direct Shipping
Local Customs & Duty
Local PPU Transit
Free Zone Short-Term Storage
Source-Shipping Time-Saver
Forwarding & Shipping Agencies
Air Cargo Operations and Facilities
Formal Secured Customs & Duty Zone
Trucks Terminal
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
48These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Roads and maneuvering dimensions are suitable for trucks
Temporary station during early phases, with forklift aid
F&B, host, and recreational facilities for Truckers
Regular demand of 145 trucks and long vehicles
Permanent
Temporary
Administration of Gates
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
49These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Hi-tech Tolling and Registry systems for regular users
Security Collaboration for the registry of Visitors
Planning Emergency Service
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
50These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Fire Fighting & Rescue Station
Local Police & Low Enforcement Station
Emergency Command and Control Center
Advanced techniques to enhance response time
Encouragement of Community Policing Programs
Ambulatory & Public Health Station
MandatoryFire
MarshalCode
HSSE Excellence Programs& Awards
Local Safety
SupervisorsPrograms
Thank You..!
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
51These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Conceptual Approach & Strategic OrientationFinal Submission # 04January 2012
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Confidential & Controlled Copy
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Contents
53
# Domain Ref Topic of Guidelines
1 Commercial Theme & Identity
1.1 Theme urban design, Images for urban details, envelops, and Look & Feel
1.2 Urban constraints and business demand Zones, usages, density, heights, coverage, etc
2 Plots Commercialization
2.1 Tabulated Plots, Areas Breakdown, Gross Built up Areas, Set Backs, Accessibilities, etc.
2.2 Sample of Planning & Building regulations, Sample of Plot’s Marketing Pack
3 Accessibility & Transportation
3.1 Terminals Proposals for Railways, Air Cargo, Trucks, Public Transportation, etc.
3.2 Administration of Gates, Emergency Service, Public Parking facilities, etc.
4 Infrastructure & Environment
4.1 Utilities and Services framework, Reservoirs development, Environmental design, etc.
4.2 Waste management, Energy solutions, Carbon trade, Regional integration, etc.
5 Urban Utilities & Services
5.1 Habitat Facilities, Shared Business Facilities, Community Facilities, etc.
5.2 Areas of Urban Improvements & Excellence
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Schematic Design Overview
54These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
55These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Infrastructure & Environment
4
Infrastructure Theme
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
56
Water Supply Power Supply Sewage Treatment
ICT Network Gates & Roads Public Landscape
Public Address System Traffic Control Security Control
Waste Management Environment Control Detection & Alarm
Street Lighting Cleaning Attendance Recreational Facilities
Public Health & Safety Pest Control Public Facilities
The ConceptAcross most of the developed and urban world, innovating better solutions for operations is the core of modern installations for infrastructure. The relatively cheap conventional applications have lots of pitfalls within the busy built environment. The continuous improvements on manufacturing and installations have lots of support among both city managers and engineers. It is recommended and planned to use the pre-cast tunnels within PPU. Despite the additional cost, the associated operational precision and easiness will add many economic and business value and branding
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Infrastructure Alignment
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
57
Infrastructure Tunnels
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
8,000 m tunnels 2x2 m
Runs under sidewalk ways
Cost are 2x conventional system
30% reduction of operational costs
The ConceptDespite the higher capital cost of this Tunnel System, its lower operational one is attractive. The operational context of infrastructure is more to consider rather than its built up. Operations of infrastructure in habitats are disturbing and annoying, in addition to negative impact on the livelihood. No wonder that London 2012 had been built on the same, despite the additional cost due to area vs. consumption.
Power Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, UruguayPARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Substation
Bucket Station
Main Grid Intervener
Regional Grid
Reduction of Public Utilities’ Cabling by Solar and Independent Supply
Energy Credit Programs to Encourage Renewable Energy Solutions
Encourage and Incentivize Waste To Energy Solutions
58These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
The ConceptElectrical supply will be provided through PPU by a 33/11 KV cables, whereas reduced to the use by Pocket Substations ; which will directly feed the plots. The final design will determine the locations and number of served plots as per the industry standard. However, The Draft Conceptual Master Plan had provided tentative locations for illustrative purposes. Additionally, within the recommended use of Solar Energy to trade off the regional grid, an intervener is recommended within the buffer of the Grid.
Hydro Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, UruguayPARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Also and Critically works as in-take for Fire Fighting
PondPond
Distribution
Feed Disposal
Mechanical Oxygenation
Return
59These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
The ConceptThe utilization of the existing pond is not only topographical, but also functional and urban. The proposed system will add value to the pond and been an environmental pilot solution, while maintaining capacity and directions of the natural flow.
Security Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
CCTV NetworkInfrared Detection
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
The ConceptDespite the lower rates of crimes and breaking the law in Uruguay, the global trend to enhance security measures and counter actions is not only preventive but also functional. Using the hi-Tech installations and equipments reduces the cost of manpower, while enabling the better control and recording of activities. Also, the linkage with the digital data will enable faster actions and processing of permits and urban risk management
CCTV Network
Infrared detector on fences
Public Address System
Integrated Command Control
Traffic Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
61
Single way Traffic Directions
No Traffic Lights, but Pedestrians
Industrial Width for Carriage ways
Expandable Roads Capacity
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Smooth Flow Methodology
The ConceptThe Usage, The size and The Generated Traffic do not support complex traffic management system. It had been designed to use the natural flow, with Zero crossings to create a safe driving environment. Use of speed hampers is not recommended, and replaced by mandatory curves and short distances. No middle islands are considered, in order to enable easier maneuvers and accessibilities.
Wastewater Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
62
Irrigation will depend on the recycled ater
Mainly reused for industrial use
Incentives on usage protocols
Target Self Sufficient PPU
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
3 networks of non-potable water supply
Technology provides small & mobile units
95% is industrial
The ConceptTo enhance the environmental compliances, and upgrade the PPP context, wastewater will be treated within the PPU. In some selected locations, small units to filter, detoxicate and oxygenate will collect the wastewaters, process and store for the non-potable use. Incentives will encourage end-users to bear the wastewater treatment.
Environmental Design
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
63These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Essentially to suite the surrounding patterns and landscapes
Mandatory buffers on each plot
Incentives on greenish
Public landscape promotes for LEED & Environmental Code
The ConceptEcosystems and city systems often form hierarchically structured landscapes whose spatial pattern is scale dependent. The landscape is the green part of the city that weaves throughout - in the form of urban parks, street trees, plants, flowers, and water in many forms. The landscape helps define the character and beauty of a city and creates soft, contrasting spaces and elements.
Waste Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
64These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PPU will develop strategy and framework on Waste Management
Implementations will not obstacle futuristic improvements
PPU parallel revenues will utilize concessions on Waste Business
Waste to Energy, Waste to Recycle, and Waste to Reuse are sample domains
Incentives to End-Users on improved Waste Management Implementations
Thank You..!
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
65These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Conceptual Approach & Strategic OrientationFinal Submission # 05January 2012
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Confidential & Controlled Copy
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Contents
67
# Domain Ref Topic of Guidelines
1 Commercial Theme & Identity
1.1 Theme urban design, Images for urban details, envelops, and Look & Feel
1.2 Urban constraints and business demand Zones, usages, density, heights, coverage, etc
2 Plots Commercialization
2.1 Tabulated Plots, Areas Breakdown, Gross Built up Areas, Set Backs, Accessibilities, etc.
2.2 Sample of Planning & Building regulations, Sample of Plot’s Marketing Pack
3 Accessibility & Transportation
3.1 Terminals Proposals for Railways, Air Cargo, Trucks, Public Transportation, etc.
3.2 Administration of Gates, Emergency Service, Public Parking facilities, etc.
4 Infrastructure & Environment
4.1 Utilities and Services framework, Reservoirs development, Environmental design, etc.
4.2 Waste management, Energy solutions, Carbon trade, Regional integration, etc.
5 Urban Utilities & Services
5.1 Habitat Facilities, Shared Business Facilities, Community Facilities, etc.
5.2 Areas of Urban Improvements & Excellence
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Schematic Design Overview
68These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
69These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Urban Utilities & Services
5
One Stop Shop
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
70These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Government Private Enterprise
Infrastructure Deal Flow
Public Private Partnership
One-Stop Shop
Customer
Convenient access point for customers to register their requests, seek information and gain efficient resolution from issues
Efficient customer service serving the customer in the most effective manner and ensuring minimum response time with clarity in response
System backed service to ensure standardization of service and quality of information rendered
Back end integration – PPP model leading to commercialization of government in attracting flow of foreign direct investments
Process 1
Process 2
Process 3
Process 4
Process 5LA3
LA2
LA1
G1
G2
G3
G4
OSS
Technology Platform
Business Facilities
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
71These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Shared Business Facilities
Reduction of Capital Investment
Improved Performance
Improved Operations
Quality Engagements
Reduction of invested cap[ital is the trend to
achieve business effi ciency and excellence.
Instead of the limited returns on some
aggregates of business processing, funds can be more wisely allocated to
optimize and maximize the feasibility of operations.
Additionally, the independent
administration of business facilities would enable
wider horizons and activities to add value to the business operations.
Today, Leasing the business facilities becomes a
proofitaable business.
Recreational Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
72
Recreational CentersPublic Landscape
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Recreation helps build healthy minds. Studies have shown employees who engaged in some
type of regular exercise were more committed to their organizations, and their outlook improved with regards to working
with their supervisor and co-workers.
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Truck Control Management
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Integrated Hi-Tech Systems for Access Control & Security Management with Property Operations
0 4 8 40 9 2 7 3, .kg
GateControl
Plate Reader
Control Center
Business Partner
Monitors
Weight Reader
73These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Solar Energized Systems
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
74These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Street ATM
Public Telephone
Bus Stop Stand
Street Kiosks
Street Signs Boards
Advertisements
Transit Tickets
Public Dispensers
Street Lights
Parking Tickets
All roofs are covered with Solar Energy
Panels
Incentives Programs for power reduction
and management
The reduced cost of OPEX will reward the cost of Hi-Tech CAPEX
Business of Waste
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
75These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
A VIOLIA Experience
Thank You..!
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
76These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Conceptual Approach & Strategic OrientationFinal Submission # 06January 2012
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Confidential & Controlled Copy
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
78These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Financial Snapshots
6
Construction Optimum Phasing
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
79These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Phase1
Phase4
Phase6
Phase7
Phase5
Phase2
Phase3
Plots:Area :Infra $:
Plots:Area :Infra $:
Plots:Area :Infra $:
Plots:Area :Infra $:
Plots:Area :Infra $:
Plots:Area :Infra $:
Plots:Area :Infra $:
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
What’s Next??
80These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
This AssignmentIntroduction to Conceptual Master Plan
& Urban Planning Framework
Draft Conceptual Master Plan
Draft Urban Planning Guidelines
Final Conceptual Master Plan
Urban Planning Guidelines
Master Plan Engineering Design Development
IDMP
The Concession Company
Urban Planner
Investment & Development Management Agreement
Consortium forConceptual Master Plan
Employer Consent
InvestmentConsent
Land-use Consent
MunicipalConsent
Business Vision & Interest
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
Timeline
81These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Conceptual Products Financial Products Salable ProductsBankable Products
SPV Formation
Concession Company Formation
Phase TwoProject Verification
(Constructability)Phase Four
Project Development (Design & Construction of Salable Deliverables)
Phase TwoProject Identification
(Feasibility)
Phase OneProject Realization
(Viability)
Sign Off
IDMA
Investors & ShareholdersSeed InvestorsPrinciple Parties
ExitIDMA
Authorities & Planning Consents
Draft Conceptual Designs
Project Management
Construction PermitsRegulatory Consent
Development of Conceptual Designs Development of Engineering Designs Construction & Assembly
Y5H1
Y1H2Y1H1 Y2H2 Y3H2Y2H1 Y3H1
Cost of Delivery
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
82These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Domain Particulars $
Expenditure The Cost Model 351,744,048
Cost of Borrowing @ 10% 35,174,405
Annual Cost of Operations 15,700,000
Total Cost of Operations for 20 years 314,000,000
Total Cost over 20 years 700,918,453
Revenues Revenues for 20 years 1,063,990,858
Annual Commercial Concessions 14,600,000
Value of Concessions for 20 years 292,000,000
Total Revenues 1,355,990,858
PPU Profitability 655,072,405
Over 20 years 209%
Cost of Delivery
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
83These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Cluster No. of Plots Plot Area m2 Land Cost per Plot @ $/m2
Total Land Cost per Cluster $
Associated Infra Area per
Cluster m2Total Cluster Infra
Cost @ $/m2 Plot GFA m2Total Cluster
Building Construction Cost @
$/m2
Overall Developed Assets Value $
0.3 50 1000
Administration 9 6,171 1,851 16,662 17,519 875,950 8,036 8,036,000 8,928,612
Processing 29 6,042 1,813 52,565 43,858 2,192,900 131,358 131,358,000 133,603,465
Light Industries 54 9,481 2,844 153,592 225,282 11,264,100 286,718 286,718,000 298,135,692
Heavy Industries 23 23,391 7017.3 161,398 183,003 9,150,150 352,978 352,978,000 362,289,548
Business Park 22 5,909 1,773 38,999 74,997 3,749,850 55,003 55,003,000 58,791,849
Totals 423,217 27,232,950 834,093,000
Overall Asset Value of PPU 861,749,167
Annual Cost of Operations
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
84These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Ref Domain Particular Description Rate $* Qyt Annual $ Total $PPU Overall Annual Operations Cost 15,700,000
Corporate 6,365,000
BRD004 Board Appoint/Assign/Delegate Membership 25,000 5 125,000STG002 Strategy Corporate Structure Cost of Consultancy 50,000 1 50,000NVS002 Investment Structuring & Modeling Cost of Consultancy 50,000 1 50,000NVS003 Investment Shares & Shareholders Taxation on 30mln** 6,000,000 1 6,000,000RSK003 Risk Preparedness Cost of Consultancy 20,000 1 20,000CSR002 CSR Programs Cost of Consultancy 20,000 1 20,000LGL001 Legal Contracts Development Cost of Consultancy 10,000 10 100,000
Business Development 140,000MKT001 Marketing Market Analysis Cost of Consultancy 30,000 1 30,000MKT002 Marketing Branding Cost of Consultancy 30,000 1 30,000MKT003 Marketing Venues & Forums Cost of Venues 10,000 5 50,000SAL002 Sales Processing Cost of Processing 200 150 30,000
Quality 200,000CRM003 CRM Compliant Processing Cost of Consultancy 10,000 2 20,000CRM005 CRM Survey Processing Cost of Consultancy 10,000 2 20,000AUD002 Audit Assessment & Analysis Cost of Consultancy 30,000 2 60,000CAL004 Call Center Technology & Systems Cost of Assembly 100,000 1 100,000
Operations 140,000CNL001 Control Technical Audit Cost of Consultancy 30,000 2 60,000CNL003 Control HSSE Attendance Cost of Consultancy 20,000 4 80,000
Administration 8,855,000FNC003 Finance Treasury Cost of Borrowing*** 0 2 0FNC004 Finance Transactions Cost of Processing 20 500 10,000HUR001 HR Staffing Cost of Recruitment 2,000 100 200,000HUR002 HR Training & Development Cost of Programs 20,000 5 100,000HUR003 HR Wages & Compensations Salaries 30,000 100 3,000,000HUR004 HR Welfare Employment Benefits 2,000 100 200,000HUR005 HR Workplace Furniture & Interiors 1,000,000 1 1,000,000ICT001 ICT Systems & Network Cost of Assembly 200,000 1 200,000ICT002 ICT Data Processing Cost of Devices 500 50 25,000PRL001 Procurement Soft Commodities Cost of Utilities 60,000 12 720,000PRL002 Procurement Hard Commodities Cost of Property 100,000 1 100,000CNT009 Contracts Alignment & Compliance Cost of Consultancy 30,000 100 3,000,000CNT010 Contracts Dispute Processing Cost of Consultancy 30,000 10 300,000
** Taxation (without holidays) is calculated @20% of 30mln annual profit of 300mln annual investment
* All Rates are estimated internationally, subject to local adaptation
*** Delivered separately
Expected Threshold Revenues
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
85These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Cluster No. of Plots
Ratio Covered
Plots (Built)
Land Cost per Plot
Infra Cost Per Plot
Construction Cost Per Plot
Overall Cost for Covered
Plots
Overall Cost for Uncovered
Plots
Proposed Annual
Yield
Proposed Total Lease
Revenues
Proposed Annual
Lease per Plot
Administration 9 100% 1,851 97,328 992,068 9,821,223 892,612 25% 2,678,459 14,880
Processing 29 80% 1,813 75,617 3,685,613 87,302,590 2,245,465 15% 13,432,208 23,159
Light Industries 54 80% 2,844 208,594 4,416,825 199,940,997 11,417,692 15% 31,703,803 29,355
Heavy Industries 23 0% 7,017 397,833 0 0 9,311,548 25% 2,327,887 5,061
Business Park 22 50% 1,773 170,448 1,336,178 16,592,387 3,788,849 15% 3,057,185 6,948
Totals 137 10,430,684 313,657,197 27,656,167 53,199,543 79,403
(For 20 Years Concession Company) Total PPU
Investment Cost
351,744,048 Total PPU Revenue1,063,990,858
302%
Expected Commercial Concessions
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
86These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Particulars Rate $ Unit Qty Total Value $
Town Management 1 m2 1,100,000 1,000,000
Local Public Transit 0.20 Tickets 2,640,000 500,000
Energy Management 2,500 MW 42 100,000
Freight Management 1 Tones 400,000 500,000
Facilities Management 5 m2 1,100,000 5,000,000
Roads Toll System 1 Vehicles 525,624 500,000
Advertise & Billboards 100,000 KM 10 1,000,000
F&B, Retail & Recreational 2 Activities 2,640,000 6,000,000
PPU Annual Value of Commercial Concessions 14,600,000
Attachments
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
87
Attachment 1: Proposed Conceptual Master Plan Sheet 1 of 2
Attachment 2: Proposed Conceptual Master Plan Sheet 2 of 2
These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Value Escalations
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
88These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory
Typical Price per Hectare Green Land US$ 2,100
Typical Price per Hectare Brown Field US$ 12,000
Typical Price per Hectare US$ 240,000
Green Land Value of 140 Hectare US$ 294,000
Developed Land Value of 140 Hectare
m2 GFA Value of 835,093 m2 US$ 40
Typical Price per m2Developed Land
US$ 24
0%
571%
0%
11,400%
11,400%
GFA Concession Value of m2 for 49Y US$ 60
Total GFA Concession Value for 49Y
Productivo Parque
US$ 50,105,58017,000%
Developed Plots Value of 865,099 m2US$ 33,600,000
1
2
3
4
Thank You..!
PARQUE PRODUCTIVO URUGUAY (PPU) Canelones, Uruguay
89These are carefully adapted and coordinated concepts to be developed as per standards and practices under Ethraa’s Coordination & Advisory