115 Part-2: Supply Requirements Section 6 Schedule of Supply The Schedule of Supply consists of six parts: 1. Lot-1 1-1. List of Goods and Related Services 1-2. Delivery and Completion Schedule 2. Lot-2 2-1. List of Goods and Related Services 2-2. Delivery and Completion Schedule 3. Lot-3 3-1. List of Goods and Related Services 3-2. Delivery and Completion Schedule 4. Lot-4 4-1. List of Goods and Related Services 4-2. Delivery and Completion Schedule 5. Technical Specifications 6. Drawings 7. Inspections and Tests

Upload: vomien

Post on 11-May-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

115

Part-2: Supply Requirements

Section 6 – Schedule of Supply

The Schedule of Supply consists of six parts: 1. Lot-1 1-1. List of Goods and Related Services 1-2. Delivery and Completion Schedule 2. Lot-2 2-1. List of Goods and Related Services 2-2. Delivery and Completion Schedule 3. Lot-3 3-1. List of Goods and Related Services 3-2. Delivery and Completion Schedule 4. Lot-4 4-1. List of Goods and Related Services 4-2. Delivery and Completion Schedule 5. Technical Specifications 6. Drawings 7. Inspections and Tests

116

Detail Address of Destination as below:

Sl No. Name of PBS Address

01 Dhaka PBS -1 Polashbari, Nabinagor,Savar, Dhaka-1344

02 Dhaka PBS -2 Panalia, Nawabgonj,Dhaka-1320

03 Dhaka PBS -3 Genda,Savar. Dhaka

04 Dhaka PBS -4 Jinjira, Keranigonj. Dhaka

05 Faridpur Kanaipur, Faridpur

06 Gajipur Chandona, Gajipur

07 Gopalgonj Karargati,Gopalgonj

08 Jamalpur Beltia,Jamalpur

09 Kishoregonj Mukshedpur, Kishoregonj

10 Madaripur Mostafapur, Madaripur.

11 Manikgonj Bakjan,Muljan, Manikgonj

12 Munshigonj Sipaihipara,Munshigonj

13 Mymesingh-1 Muktagasa,Mymensingh

14 Mymesingh-2 Bhaluka,Mymensingh.

15 Mymesingh-3 Shambhugonj,Mymensingh.

16 Narayangonj-1 Nanakhi,Sonargoan,Narayangonj.

17 Narayangonj-2 Rupgonj,Narayangonj

18 Narsingdhi-1 Madhabdi,Narsingdhi.

19 Narsingdhi-2 Chowala, Narsingdhi

20 Netrokona Rajendrapur,Challisha,Netrokona

21 Rajbari Charbagmara, Rajbari

22 Sariatpur Norbalakhana,Saiatpur.

23 Sherpur Bhatshala,Sherpur.

24 Tangail Ashekpur,Tangail.

25 B.Baria Dhakhin Suhilpur, B.Baria.

26 Chandpur-1 Hajigonj, Chandpur.

27 Chandpur-2 Khulisaduli,Baburhat, Chandpur

28 Chittagong-1 Potia,Chittagong

29 Chittagong-2 Rawzan,Chittagong

30 Chittagonj-3 Shibpur,Sitakundo,Chittagong

31 Comilla-1 Chandina,Comilla.

32 Comilla-2 Uttar Rampur (Bissoroad),Comilla.

33 Comilla-3 Goripur, Doutkandi,Comilla

34 Comilla-4 Laksum,Comilla

35 Cox’sbazar Zhilonga,Cox’sbazar.

36 Feni Mohipal,Feni

37 Laxmipur Laxmipur.

38 Noakhali Begumgonj,Noakhali.

39 Hobigonj Shayestagonj, Hobigonj.

40 Moulavibazar Shareemongol, Moulavibazar

41 Sunamgonj Wayeskhali, Sunamgonj.

42 Sylhet-1 Gotatikor, Kadomtoli,Sylhet.

43 Sylhet-2 Darbost,Joaintapur,Sylhet.

117

Lot-1

1-1. List of Goods and Related Services

Line Item No.

Description of Goods Quantity

Unit of Measurem

ent

Description of Related Services (local handling & delivery & Insurance)

Quantity to deliver at Final

Destination (Project Sites)

Delivery (to the final destination) period from the date of contract signing

1st Phase Latest

Delivery Date (from the date

of contract

signing)*

2nd phase Latest Delivery

Date (from the date of

contract signing)

Bidder’s offered Delivery date [to be provided by the bidder]

1st phase 2nd phase

1 2 3 4 5 6 7 8 9

R-40 Pole, SPC, 7.60 m, Class N7. 18500 Poles Destination Places

are as per Table 1A-i (Details Delivery Schedule for Pole)

50% of each item within 20

weeks

Remaining 50% of each item within 40

weeks

[Insert the number of weeks following the

date of Contract signing]

[Insert the number of weeks following the date

of Contract signing] R-41 Pole, SPC, 9 m, Class N6. 13500 Poles

R-42 Pole, SPC, 9 m, Class N5. 7300 Poles

R-43 Pole, SPC, 10.60 m, Class N6. 13400 Poles

R-44 Pole, SPC, 10.60 m, Class N5. 8300 Poles

R-45 Pole (SPC) 12 m, Class N5. 2000 Poles

R-46 Pole, SPC, 12m, Class N4. 884 Poles

*Quantity of items to be delivered in phase-1 and 2 are shown in the Table 1A-i (Details Delivery Schedule for Pole)

Name of Bidder: Signature of Bidder: Date:

118

1A-i Details Delivery Schedule for SPC Pole

Bid package No. URIDS(E)-G-13, Lot-1

Item: Pole (SPC); Unit in Nos.

1-2 Delivery and Completion Schedule for Lot-1

119

Lot-2

2-1 List of Goods and Related Services

Line Item No.

Description of Goods Quantity

Unit of Measurem

ent

Description of Related Services (local handling & delivery & Insurance)

Quantity to deliver at Final

Destination (Project Sites)

Delivery (to the final destination) period from the date of contract signing

1st Phase Latest

Delivery Date (from the date

of contract

signing)*

2nd phase Latest Delivery

Date (from the date of

contract signing)

Bidder’s offered Delivery date [to be provided by the bidder]

1st phase 2nd phase

1 2 3 4 5 6 7 8 9

R-40 Pole, SPC, 7.60 m, Class N7. 18500 Poles Destination Places

are as per Table 1B-i (Details Delivery Schedule for Pole)

50% of each item within 20

weeks

Remaining 50% of each item within 40

weeks

[Insert the number of weeks following the

date of Contract signing]

[Insert the number of weeks following the date

of Contract signing] R-41 Pole, SPC, 9 m, Class N6. 13500 Poles

R-42 Pole, SPC, 9 m, Class N5. 7300 Poles

R-43 Pole, SPC, 10.60 m, Class N6. 13400 Poles

R-44 Pole, SPC, 10.60 m, Class N5. 8300 Poles

R-45 Pole (SPC) 12 m, Class N5. 2000 Poles

R-46 Pole, SPC, 12m, Class N4. 884 Poles

*Quantity of items to be delivered in phase-1and 2 are shown in the Table 1B-i (Details Delivery Schedule for Pole)

Name of Bidder: Signature of Bidder: Date:

120

1B-i Details Delivery Schedule for SPC Pole

Bid package No. URIDS(E)-G-13, Lot-2

Item: Pole (SPC); Unit in Nos.

2-2 Delivery and Completion Schedule for Lot-2

121

Lot-3 3-1 List of Goods and Related Services

Line Item No.

Description of Goods Quantity

Unit of Measurem

ent

Description of Related Services (local handling & delivery & Insurance)

Quantity to deliver at Final

Destination (Project Sites)

Delivery (to the final destination) period from the date of contract signing

1st Phase Latest

Delivery Date (from the date

of contract

signing)*

2nd phase Latest Delivery

Date (from the date of

contract signing)

Bidder’s offered Delivery date [to be provided by the bidder]

1st phase 2nd phase

1 2 3 4 5 6 7 8 9

R-40 Pole, SPC, 7.60 m, Class N7. 18500 Poles Destination Places

are as per Table 1C-i (Details

Delivery Schedule for Pole)

50% of each item within 20

weeks

Remaining 50% of each item within 40

weeks

[Insert the number of weeks following the

date of Contract signing]

[Insert the number of weeks following the date

of Contract signing] R-41 Pole, SPC, 9 m, Class N6. 13500 Poles

R-42 Pole, SPC, 9 m, Class N5. 7300 Poles

R-43 Pole, SPC, 10.60 m, Class N6. 13400 Poles

R-44 Pole, SPC, 10.60 m, Class N5. 8300 Poles

R-45 Pole (SPC) 12 m, Class N5. 2000 Poles

R-46 Pole, SPC, 12m, Class N4. 884 Poles

*Quantity of items to be delivered in phase-1and 2 are shown in the Table 1C-i (Details Delivery Schedule for Pole)

Name of Bidder: Signature of Bidder: Date:

122

1C-i Details Delivery Schedule for SPC Pole

Bid package No. URIDS(E)-G-13, Lot-3

Item: Pole (SPC); Unit in Nos.

3-2 Delivery and Completion Schedule for Lot-3

123

Lot-4

4-1 List of Goods and Related Services

Line Item No.

Description of Goods Quantity

Unit of Measurem

ent

Description of Related Services (local handling & delivery & Insurance)

Quantity to deliver at Final

Destination (Project Sites)

Delivery (to the final destination) period from the date of contract signing

1st Phase Latest

Delivery Date (from the date

of contract

signing)*

2nd phase Latest Delivery

Date (from the date of

contract signing)

Bidder’s offered Delivery date [to be provided by the bidder]

1st phase 2nd phase

1 2 3 4 5 6 7 8 9

R-40 Pole, SPC, 7.60 m, Class N7. Poles Destination Places

are as per Table 1C-i (Details

Delivery Schedule for Pole)

50% of each item within 20

weeks

Remaining 50% of each item within 40

weeks

[Insert the number of weeks following the

date of Contract signing]

[Insert the number of weeks following the date

of Contract signing] R-41 Pole, SPC, 9 m, Class N6. Poles

R-42 Pole, SPC, 9 m, Class N5. Poles

R-43 Pole, SPC, 10.60 m, Class N6. Poles

R-44 Pole, SPC, 10.60 m, Class N5. Poles

R-45 Pole (SPC) 12 m, Class N5. Poles

R-46 Pole, SPC, 12m, Class N4. Poles

*Quantity of items to be delivered in phase-1and 2 are shown in the Table 1C-i (Details Delivery Schedule for Pole)

Name of Bidder: Signature of Bidder: Date:

124

1D-i Details Delivery Schedule for SPC Pole

Bid package No. URIDS(E)-G-13, Lot-4

Item: Pole (SPC); Unit in Nos.

4-2 Delivery and Completion Schedule for Lot-4

129

5 . Technical Specifications & Drawings

Summary of Technical Specifications:

Bangladesh Rural Electrification Board has followed the Technical Specifications for all the required materials used in the construction of overhead rural electricity distribution system approved by BREB Board. The Specifications have been being used for several years and updated time to time. Under this Bid Package (URIDS(E)-G-13) Lot -1, Lot- 2, Lot- 3, , Lot- 4 includes 07 items of Pole, SPC for each Lot respectively. This specification provides guidelines for design, manufacture, testing and supply of spun prestressed concrete (SPC) poles for over head power distribution lines of Rural Electrification Board (REB). The SPC poles covered by this specification will be interchangeable with the existing wood poles. A commentary is attached at the end explaining few terms used in the specification.

The poles specified herein shall conform to the mentioned international standards or their updated versions. Codes, standards or other documents referred to in this specification are to be considered as part of this specification. If a conflict between several referenced documents occurs, the more stringent requirement shall be followed. In case of a conflict between this specification and any other specification mentioned herein, this specification shall govern. The Goods and Related Services shall comply with the following Technical Specifications and Standards: Detailed design & design calculation for the offered poles in accordance with the technical specification given below in the bidding document. If the bidder wins the bid, its detailed design will be reviewed, revised (if required) and certified by Bureau of Research, Testing & Consultation (BRTC), Bangladesh University of Engineering & Technology (BUET) that the design is adequate to meet the requirements as mentioned in the technical specifications. The cost incurred in connection with the design review, revision and certification will be borne by the winning bidder/supplier and such cost is assumed to be included in the bid price.

130

RURAL ELECTRIFICATION BOARD (REB)

PEOPLESREPUBLIC OF BANGLADESH

RURAL ELECTRIFICATION BOARD (REB) PEOPLESREPUBLIC OF BANGLADESH

PUBLICATION 450-2003 (Revision 1 of REB 450-1994)

SPECIFICATION FOR SPUN PRESTRESSED CONCRETE (SPC) POLES

Prepared By:

Department of Civil Engineering Bureau of Research, Testing and Consultation (BRTC) Bangladesh University of Engineering and Technology

Dhaka-1000

June 2003

132

133