Part C Chapter 34 - Tentative Rules for the Classification of Special Crafts Patrol Boat 2015 This latest edition incorporates all rule changes. The latest revisions are shown with a vertical line. The section title is framed if the section is revised completely. Changes after the publication of the rule are written in red colour. Unless otherwise specified, these Rules apply to crafts for which the date of contract for construction is on or after 24 th of February 2015. New rules or amendments entering into force after the date of contract for construction are to be applied if required by those rules. See Rule Change Notices on TL website for details. "General Terms and Conditions" of the respective latest edition will be applicable (see Rules for Classification and Surveys). If there is a difference between the rules in English and in Turkish, the rule in English is to be considered as valid. This publication is available in print and electronic pdf version. Once downloaded, this document will become UNCONTROLLED. Please check the website below for the valid version. http:/www.turkloydu.org This rule has been published tentative version of Special Craft for Patrol Boats and planned to cover other special type of craft such as Passenger Craft, Crew Boat, Pilot Boat, etc. During the application of the rules, Türk Loydu reserve the rights to modify the rules in order to achieve targeted safety level. All rights are reserved by Türk Loydu, and content may not be reproduced, disseminated, published, or transferred in any form or by any means, except with the prior written permission of TL.

Upload: hoangnhi

Post on 19-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Part C

Chapter 34 - Tentative Rules for the Classification ofSpecial Crafts – Patrol Boat

2015

This latest edition incorporates all rule changes. The latest revisions are shown with a vertical line. The section title is framed if the section is revised completely. Changes after the publication of the rule are written in red colour.

Unless otherwise specified, these Rules apply to crafts for which the date of contract for construction is on or after 24th of February 2015. New rules or amendments entering into force after the date of contract for construction are to be applied if required by those rules. See Rule Change Notices on TL website for details.

"General Terms and Conditions" of the respective latest edition will be applicable (see Rules for Classification and Surveys).

If there is a difference between the rules in English and in Turkish, the rule in English is to be considered as valid. This publication is available in print and electronic pdf version. Once downloaded, this document will become UNCONTROLLED. Please check the website below for the valid version.

http:/www.turkloydu.org

This rule has been published tentative version of Special Craft for Patrol Boats and

planned to cover other special type of craft such as Passenger Craft, Crew Boat, Pilot

Boat, etc. During the application of the rules, Türk Loydu reserve the rights to modify

the rules in order to achieve targeted safety level.

All rights are reserved by Türk Loydu, and content may not be reproduced, disseminated, published, or transferred in any form or by any means, except with the prior written permission of TL.

TÜRK LOYDU

Head Office

Postane Mah. Tersaneler Cad. No:26 Tuzla 34944 İSTANBUL / TÜRKİYE

Tel : (90-216) 581 37 00

Fax : (90-216) 581 38 00

E-mail : [email protected]

http://www.turkloydu.org

Branch Offices

Ankara Eskişehir Yolu Mustafa Kemal Mah. 2159. Sokak No: 6/4 Çankaya - ANKARA

Tel : (90-312) 219 56 34

Fax : (90-312) 219 68 25

E-mail : [email protected]

İzmir Atatürk Cad. No:378 K.4 D.402 Kavalalılar Apt. 35220 Alsancak - İZMİR

Tel : (90-232) 464 29 88

Fax : (90-232) 464 87 51

E-mail : [email protected]

Adana Çınarlı Mah. Atatürk Cad. Aziz Naci İş Merkezi No:5 K.1 D.2 Seyhan –ADANA

Tel : (90- 322) 363 30 12

Fax : (90- 322) 363 30 19

E-mail : [email protected]

Marmaris Atatürk Cad. 99 Sok. No:11 Kat:4 Daire 6 Marmaris-MUĞLA

Tel : (90- 252) 412 46 55

Fax : (90- 252) 412 46 54

E-mail : [email protected]

AMENDMENTS

* Entry into Force (EIF) Date is provided for general guidance only, EIF dates given in Rule Change Summary(RCS) are considered valid. In addition to the above stated changes, editorial corrections may have been made.

Revised Sections RCS No. EIF Date*

Section 01 01/2016 01.01.2016

Section 08 01/2016 01.01.2016

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 2 ........................................................................................................................................................... 2

Classification and Surveys ............................................................................................................................. 2

A-Classification ................................................................................................................................................ 2

1. Classification of new buildings .................................................................................................................. 2

2. Retention of class ....................................................................................................................................... 2

3. Class Designations ..................................................................................................................................... 2

B-Surveys ......................................................................................................................................................... 2

1. Special Survey Requirements ............................................................................................................... 3

1.1 Special Requirements for Patrol Boats ............................................................................................ 3

1.1.1 Steel Crafts ....................................................................................................................................... 3

1.1.2 Aluminium Alloy Crafts ................................................................................................................... 3

1.1.2.1 Surveys in general ...................................................................................................................... 3

1.1.3 Fiber Reinforced Plastic (FRP) Crafts .......................................................................................... 3

1.1.3.1 Surveys in general ............................................................................................................................. 3

1.1.3.2 Surveys During Construction ........................................................................................................... 3

1.1.3.3 Periodical hull surveys ...................................................................................................................... 5

1.1.3.3.1 Annual and intermediate surveys ................................................................................................. 5

1.1.3.3.2 Class renewal survey (hull) and bottom survey in dry condition ............................................. 5

1.1.3.4 Examination and testing – Additional items for composite craft ................................................. 5

1.1.3.5 Suspect areas ..................................................................................................................................... 5

1.1.3.6 Ballast Keel ......................................................................................................................................... 6

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 2

Classification and Surveys

For classification and survey requirements TL Rules, Classification and Surveys is to be applied. In addition to this, the following requirements are applicable.

A-Classification

1. Classification of new buildings In case of craft is classed as a Naval Craft relevant requirements to be applied are defined for Naval Patrol Crafts in TL Naval Ship Technology, Chapter 101, Section 1, E.1 instead of TL Classification and Surveys, Section 2, B.2.

2. Retention of class In case of craft is classed as a Naval Craft relevant requirements to be applied are defined for Naval Patrol Crafts in TL Naval Ship Technology, Chapter 101, Section 1, D instead of TL Classification and Surveys, Section 2, C.

3. Class Designations The ship type Notation PATROL BOAT is only valid for small watercraft from 6 to 24 m in length. For Patrol vessels or ships above 24 m in length, the ship type notation PATROL will be assigned. In case of craft is classed as a Naval Craft relevant requirements to be applied are defined for Naval Patrol Crafts in TL Naval Ship Technology, Chapter 101, Section 2, B instead of TL Classification and Surveys, Section 2, D.

B-Surveys

Surveys during construction

Annual, intermediate and class renewal surveys

Dry docking surveys

In-water surveys

Damage and repair surveys

Propeller shaft survey

Occasional survey

Surveys in accordance with flag state regulations / Requirements of Naval Authority or Authorities

Bottom Surveys

Boiler Surveys (if applicable) Above mentioned surveys and the relevant requirements to be applied are defined in TL Classification and Surveys. In case of craft is classed as a Naval Craft relevant requirements to be applied are defined for Naval Patrol Crafts in TL Naval Ship Technology, Chapter 101, Section 3 instead of TL Classification and

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Surveys, Section 3.

1. Special Survey Requirements

1.1 Special Requirements for Patrol Boats

1.1.1 Steel Crafts

TL Rules, Classification and Surveys, Section 3, A to K are to be applied for steel crafts.

1.1.2 Aluminium Alloy Crafts

In addition to TL Rules, Classification and Surveys, Section 3, A to K, following requirements are to be applied for

aluminium alloy crafts:

1.1.2.1 Surveys in general

For all periodical surveys, the requirements of Section 3 are to be fulfilled. However, in the case of crafts more than 15

years old, the frequency of the bottom survey is subject to special consideration.

1.1.3 Fiber Reinforced Plastic (FRP) Crafts

In addition to TL Rules, Classification and Surveys, Section 3, A to K, following requirements are to be applied for FRP

crafts:

1.1.3.1 Surveys in general

For all periodical surveys, the requirements of Section 3 are to be fulfilled. However, in the case of crafts more than 15

years old, the frequency of the bottom survey is subject to special consideration.

1.1.3.2 Surveys During Construction

1.1.3.2.1 With reference to lamination, special inspections are required at the following stages.

For hand lay-up lamination:

a) when the hull lamination starts with the application of gel-coat;

b) during the hull lamination at different stages;

c) before starting the arrangement of internal stiffeners;

4

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

d) when the hull is extracted from the mould;

e) when the connection of the hull to the deck starts;

f) before the installation of the dolly, if any;

g) when the core of sandwich structure is arranged.

1.1.3.2.2 For particular lamination processes in enclosed mould, such as infusion lamination, the lamination survey

scope is to be agreed with the TL Surveyor, but in any case special inspections are required at the following stages:

a) at the application of the release agent and the gel coat prior to starting with application of the laminate;

b) when the dry reinforcements layers and cores are fitted on the mould;

c) at the vacuum application for the initial check prior to starting with the lamination and related to:

• consolidation of the bag

• vacuum application

• vacuum/leakage control

d) during the resin infusion to verify and record the following data:

• waiting time

• infusion time

• vacuum level during the infusion

e) after the bag take-off to inspect the result of the lamination

f) before starting the arrangement of internal stiffeners

g) when the hull is extracted from the mould for the final inspection;

h) when the connection of the hull to the deck starts;

i) before the installation of the dolly, if any.

1.1.3.2.3 When thermosetting resins are employed, attention is to be payed to the type and quantity of catalyst agent

employed so as to be compatible with the resin and the temperature and humidity of the space where composite

fabrication and the curing process take place.

1.1.3.2.4 On the basis of the internal controls of the shipyard, the TL Surveyor may not attend some of the above

inspections, provided that satisfactory records and internal checks are be submitted.

1.1.3.2.5 In addition, during the supervision of the first hull, an inspection of the shipyard is performed in order to verify

that it is provided with adequate equipment in relation to the materials used and to the type of manufacture and that the

quality of the laminates is ensured.

5

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

1.1.3.3 Periodical hull surveys

1.1.3.3.1 Annual and intermediate surveys

In the case of hulls made of sandwich type structures, it is to be carefully checked that the parts are not detached from

the core. The check is to be performed by hammering the shell and evaluating the differences in the sound heard or by

means of checks with non-destructive methods recognised by TL.

The connection between hull and deck is to be carefully checked, in particular when hull and deck are made of different

materials.

1.1.3.3.2 Class renewal survey (hull) and bottom survey in dry condition

In addition to the requirements for the intermediate surveys given in 15.2.1.3.3.1, the presence of "osmosis" phenomena

in the laminates of the underwater body and/or of cracks in the gel-coat is to be verified.

To this end, the craft is to be made available for the bottom survey in dry condition before the application of any paint, so

as to allow a careful visual inspection.

In-water survey in lieu of bottom survey in dry condition will be specially considered by TL on a case-by-case analysis.

1.1.3.4 Examination and testing – Additional items for composite craft

The bonded attachments of frames, floors, bulkheads, structural joinery, engine bearers, sterntubes, rudder tubes, and

integral tank boundaries are to be examined.

The hull to deck joint together with any joints between the deck and deckhouses or superstructures are to be examined.

The structure in way of the bolted attachment of fittings including guardrail stanchions, windlass, shaft brackets,

fendering, mooring bitts, mast steps, rigging chainplates, etc., is to be examined.

External hull structure are to be specially examined:

For composite hulls the gelcoat or other protective finish is to be examined for surface cracking, blistering or other

damage which may impair the efficiency of the protection to the underlying laminate.

1.1.3.5 Suspect areas

Suspect areas are locations within the hull structure vulnerable to increased likelihood of structural deterioration and may

include:

6

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

For composite hulls, areas subject to impact damage.

1.1.3.6 Ballast Keel

In composite crafts care is to be taken to prevent crushing of GRP laminates through overtightening of keel bolts.

In the case of composite structures, including steel and GRP, consideration will be given to the use of steel rivets.

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 3 ........................................................................................................................................................... 3

Hull Structures and Ship Equipment ............................................................................................................ 3

A. Subdivision and Stability ........................................................................................................................... 3

1. Buoyancy ..................................................................................................................................................... 3

1.1 Selection of rules ...................................................................................................................................... 3

1.2 Special Crafts up to 24 m length ............................................................................................................ 3

1.2.1 General ................................................................................................................................................... 3

1.2.2 Number of persons ............................................................................................................................... 3

1.2.3 Freeboard ............................................................................................................................................... 3

1.2.4 Guard rails, guard rail stanchions ....................................................................................................... 4

1.3 Special Crafts with L ≥ 24 m and TL HSC Rules to be applied ......................................................... 4

1.4 Special Crafts with L ≥ 24 m and International Convention of Load Lines 1966/88 to be applied

........................................................................................................................................................................... 4

2. Subdivision and Intact / Damaged Stability ............................................................................................ 4

2.1 Selection of rules ...................................................................................................................................... 4

2.2 Compartment arrangement .................................................................................................................... 4

2.3 Naval Special Crafts ................................................................................................................................ 5

3. Marking of Maximum Draught .................................................................................................................. 5

B. Materials ...................................................................................................................................................... 5

C. Design Principles ....................................................................................................................................... 5

1. Selection of rules ........................................................................................................................................ 5

2. Minimum plate thickness for steel and aluminium structures ............................................................. 5

3. Aluminium structures ................................................................................................................................. 5

4. Fibre-reinforced plastic .............................................................................................................................. 5

5. Other materials ........................................................................................................................................... 5

6. Catamarans ................................................................................................................................................. 5

7. Waterjet support structure......................................................................................................................... 5

D. Design Loads .............................................................................................................................................. 6

1. High speed design loads ........................................................................................................................... 6

2. Catamarans ................................................................................................................................................. 6

3. SWATH ........................................................................................................................................................ 6

4. Restricted service area .............................................................................................................................. 6

5. Wave height restriction .............................................................................................................................. 6

E. Longitudinal Strength ................................................................................................................................ 6

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

F. Bottom and Shell Structures .................................................................................................................... 6

G. Fatigue Strength ........................................................................................................................................ 6

H. Noise and Vibration ................................................................................................................................... 7

I. Anchoring and Mooring Equipment .......................................................................................................... 7

J. Hull Outfit ..................................................................................................................................................... 7

2. Minimum structural strength of guard-rails ............................................................................................. 7

3. Seat accommodation ................................................................................................................................. 7

4. Securing of goods and provisions ........................................................................................................... 7

5. Rescue zone ............................................................................................................................................... 8

K. Structural Fire Protection ......................................................................................................................... 8

2. Boats with a total of 12 non-crew personnel on board ......................................................................... 8

2.1 Boats of less than 24 m in length .......................................................................................................... 8

2.2 Boats of 24 m in length and over ........................................................................................................... 8

2.2.1 Boats of less than 500 GT made of steel or other equivalent material........................................ 8

2.2.2 Boats of 500 GT and over made of steel or other equivalent material ........................................ 8

2.2.3 Boats made of material other than steel or equivalent ................................................................... 8

3. Boats with more than 12 non-crew personnel but not more than 60 persons on board ................ 8

3.1 Boats made of steel or other equivalent material ............................................................................... 8

3.2 Boats made of material other than steel or equivalent ...................................................................... 9

4. Rule application diagram ........................................................................................................................... 9

L. Residual Strength ...................................................................................................................................... 9

M. Amphibious Warfare ................................................................................................................................ 9

N. Provisions for Flight Operations ............................................................................................................. 9

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 3

Hull Structures and Ship Equipment

A. Subdivision and Stability

1. Buoyancy

1.1 Selection of rules The selection procedure for applicable rules and regulations for watertight and weathertight integrity of boats / crafts is shown in flow-chart in Section 8.

1.2 Special Crafts up to 24 m length

For special crafts up to 24 m length, ISO 12215 is to be applied. If VHSC ≥ 3,7.∇ 0,1667 (V in m/s, ∇ in m

3) TL

Chapter 7, Section 2 is to be applied.

1.2.1 General

The requirements defined hereinafter are to be checked by calculation and/or by trials with the prototype craft in the fully loaded ready for use condition. Trials are to be carried out under the supervision of a TL Surveyor. Details of the execution of the trials are laid down by TL Head Office.

1.2.2 Number of persons When the range of service is unlimited or the distance to the nearest port of refuge and the offshore distance is 200 nautical miles, adequate volume (including bed, seating group, etc.) is to be provided for crew. In day-trip boats, there should be a seat for each person on board and also, number of required toilets, adequate volume, etc. as defined in regulations are to be provided.

1.2.3 Freeboard 1. In the case of a craft with a continuous watertight weather deck, which is neither stepped nor recessed nor raised, have a freeboard measured down from the lowest point of the weather deck of not less than 300 mm for crafts of 7 metres in length or under and not less than 750 mm for crafts of 18 metres in length or over. For a craft of intermediate length the freeboard should be determined by linear interpolation. 2. In the case of a craft with a continuous watertight weather deck, which may be stepped, recessed, or raised, have a freeboard measured down from the lowest point of the weather deck, of not less than 200 mm for crafts of 7 metres in length or under and not less than 400 mm for crafts of 18 metres in length or over. For a craft of intermediate length the freeboard should be determined by linear interpolation. The raised portion(s) of the watertight weather deck should extend across the full breadth of the craft and the average freeboard over the length of the craft should comply with 1. above for a craft with a continuous watertight weather deck.

4

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

1.2.4 Guard rails, guard rail stanchions

The dimensioning of guard rails is to be in compliance with ISO 15085.

1.3 Special Crafts with L ≥ 24 m and TL HSC Rules to be applied

The TL Rules for High Speed Craft (Chapter 7), Section 2 have to be applied and for Special Crafts the following requirements are to be considered:

2.1.8: Arrangement of watertight bulkheads

2.2: Intact buoyancy and watertight / weathertight integrity

2.2.5: Indicators and surveillance

2.2.6 Integrity of superstructure

2.2.7 Doors, windows, etc., in boundaries of weathertight spaces

2.2.8 Hatchways and other openings

2.2.9 Scuppers, inlets and discharges

2.2.10 Air pipes

2.2.11 Freeing ports

2.9: Marking and recording of the design waterline

1.4 Special Crafts with L ≥ 24 m and International Convention of Load Lines 1966/88 to be applied The TL Rules Hull (Chapter 1), Sections 11 to 26 are to be applied and for Special Crafts the following requirements are to be considered:

Section 11, A.1: Watertight Bulkheads, General

Section 15, A.: Hatchways, General

Section 15, D.: Smaller Openings and Hatches Section 16, A.: Side Scuttles, Windows and Sky- lights to E.: Ventilators

Section 16, F.2: Guard-Rails

Section 17, E.2 to E.3: Chain locker, as far as applicable Section 26, E.4: External openings

For access openings the TL Rules Hull (Chapter 1), Section 16, A and for doors the TL Rules Hull (Chapter 1), Section 23 shall be applied.

2. Subdivision and Intact / Damaged Stability

2.1 Selection of rules A selection procedure for the applicable rules and regulations concerning intact and damaged stability of Special Crafts is given in flow-chart in Section 8.

2.2 Compartment arrangement Besides the requirements for intact and also damage stability descriptive instructions on the compartment

5

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

arrangement given in the rules are to be considered. In case of waterjet system is used for propulsion, if the craft comply the damage stability rules, requirements of aft peak bulkhead will be specially considered.

2.3 Naval Special Crafts If required by the naval administration/authority, TL Navy Rules shall be applied.

3. Marking of Maximum Draught The marking of non-naval Special Crafts is to be pro- vided according to the TL Rules for Hull (Chapter 1), Annex.

B. Materials TL Rules for Material (Chapter 2) is to be applied.

C. Design Principles

1. Selection of rules The selection procedure for applicable rules and regulations for the hull structure of Special Crafts is shown in flow-chart in Section 8, 3.1.

2. Minimum plate thickness for steel and aluminium structures Subject to flow-chart given in Section 8, minimum plate thicknesses for Special Craft must be determined for craft subject to yacht rules, see TL Chapter 9, Section 5, Table 5.2. For High Speed Craft, see TL Chapter 7, Section 3, Table K3.7.2.

3. Aluminium structures Hull structures made of aluminium are to be designed according to flow-chart in Section 8.

4. Fibre-reinforced plastic Hull structures made of fibre reinforced plastics are to be designed according to flow-chart in Section 8.

5. Other materials Designs using other materials have to be agreed with TL case by case.

6. Catamarans For Special Crafts in form of catamarans the requirements for direct calculations and transverse strength are defined in the TL Rules for High Speed Craft (Chapter 7), Section 3.

7. Waterjet support structure The supporting structures of waterjets are dimensioned according to the TL Rules for High Speed Craft (Chapter 7), Section 3, K3.9.2.

6

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

D. Design Loads

1. High speed design loads For Special Crafts with an expected maximum continuous ahead speed VHSC ≥ 3,7.∇ 0,1667

(V in m/s, ∇ in m

3) special overall and local loads from the TL Rules for High Speed Craft (Chapter 7), Section 3,

K3.4 and K3.5 are to be applied for dimensioning of the hull structures.

2. Catamarans For Special Crafts the catamaran bending and torsional moments as well shear forces are defined in the TL Rules for High Speed Craft (Chapter 7), Section 3 under K3.4.2.

3. SWATH For Special Crafts in the form of small waterplane area twin-hull (SWATH) the main loads, which are the side beam force and the transverse bending moments are defined in the TL Rules for High Speed Craft (Chapter 7), Section 3, K3.4.3 independent of the boat’s speed.

4. Restricted service area Restricted Service Area Notations are defined to determine the design loads for Special Crafts with certain service areas, see TL Classification and Survey Rules, Section 2, D.4.

5. Wave height restriction For Patrol Boats with a service speed above VHSC ≥ 3,7.∇ 0,1667

(V in m/s, ∇ in m3) a

speed/wave restriction curve will be defined by TL. Additionally a speed/wave restriction curve may be defined for catamaran and SWATH types of Special Crafts with speeds less than V.

E. Longitudinal Strength Longitudinal strength will be specially considered by TL, if required.

F. Bottom and Shell Structures 1. A double bottom extending from the collision bulkhead to the after peak bulkhead is to be arranged as far as practicable and compatible with the design and mission of the Special Craft. For large Special Crafts with more than 500 GT a double bottom according to SOLAS Chapter II-1, Regulation 9 has to be provided. 2. Special requirements resulting from applicable rules for subdivision and stability have to be considered.

G. Fatigue Strength

Fatigue strength analysis will be specially considered by TL, if required.

7

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

H. Noise and Vibration Noise and vibration limits for working and living spaces should be contractually agreed between Owner and Shipyard and shall also to be in accordance with flag state requirements. ACCOM and ACCOM+ (noise, vibration) additional notations will be assigned if crafts comply with the requirements related to only noise and vibration in TL, Chapter 1, Section 2.

I. Anchoring and Mooring Equipment

1. The minimum anchoring, mooring and towing equipment is to be determined according to;

For yachts, TL Rules for Yachts (Chapter 9), Section 2, C.

For high speed crafts, TL Rules for High Speed Crafts (Chapter 7), Section 6, 6.5.

2. For multihull Special Crafts the equipment numeral is to be defined in analogous way, details are given in;

For yachts, TL Rules for Yachts (Chapter 9), Section 2, C.7, compare also flow-chart in Section 8.

For high speed crafts, TL Rules for High Speed Craft (Chapter 7), Section 6, 6.5.2, compare also flow-chart in Section 8.

3. Steel wire and synthetic fibre ropes instead of chain cables may be used for Special Crafts according to;

For yachts, TL Rules for Yachts (Chapter 9), Section 2, C.4.

For high speed crafts, TL Rules for High Speed Craft (Chapter 7), Section 6, 6.5.5 or 6.5.6, respectively.

J. Hull Outfit

1. Guard rails or bulwarks are in general to have a height of according to ISO 15085.

2. Minimum structural strength of guard-rails For more details see ISO 15085, items 10., 11. and 12.

3. Seat accommodation For fast Special Crafts where high accelerations are to be expected, adequate seats which are able to withstand these accelerations are to be provided for all members of the crew and / or passengers. Sidely positioned seats are not allowed for a collision acceleration of gcoll > 3. The value of gcoll to be calculated according to TL Rules for High Speed Craft (Chapter 7), Section 4, 4.4.5.

4. Securing of goods and provisions For fast Special Crafts where high accelerations are to be expected, stores and lockers for goods and provisions are to be equipped with adequate means of securing the content against shifting and damage.

8

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

5. Rescue zone If it can be expected that one of the missions of the Special Crafts will include operations to rescue persons drifting in the sea, on the main deck and at the boat’s sides measures to establish a rescue zone are to be provided. This zone is to be equipped with equipment to help or even lift persons on board and shall be situated in a safe distance from hull appendages and the operation of the propellers. It shall be possible to have visual control of this zone from the bridge and in the night adequate illumination of the zone has to be provided.

K. Structural Fire Protection

1. The terms used in this Section are as defined in SOLAS 74 as amended.

2. Boats with a total of 12 non-crew personnel on board

2.1 Boats of less than 24 m in length To comply with the TL Rules for Construction and Classification of Yachts (Chapter 9), Section 10, A.5.

2.2 Boats of 24 m in length and over

2.2.1 Boats of less than 500 GT made of steel or other equivalent material

To comply with IACS Recommendation No. 99, Chapter IV, Section 2.

2.2.2 Boats of 500 GT and over made of steel or other equivalent material To comply with the TL Rules for Hull (Chapter 1), Section 21, C.

2.2.3 Boats made of material other than steel or equivalent

To comply with TL Rules for High Speed Craft (Chapter 7), Section 4, 4.7 and Section 7 as applicable for cargo craft. The application of these Rules is subject to the following conditions: – Boats do not proceed during their voyage more than 8 hours at 90 % of maximum speed from a

place of refuge. – All persons on board can abandon the ship within a period less than the structural fire protection

time for major fire hazard areas. – Boats are capable of maintaining the main functions and safety systems of unaffected spaces after

fire in any one compartment on board. Boats need not be able to return to a place of refuge under their own power.

3. Boats with more than 12 non-crew personnel but not more than 60 persons on board

3.1 Boats made of steel or other equivalent material The requirements of 2.2.2 apply.

9

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

3.2 Boats made of material other than steel or equivalent The requirements of 2.2.3 apply.

4. Rule application diagram The flow-chart in Section 8 which is related with structural fire protection gives an overview of the application of the TL Rules for Special Crafts. The following Sections are in general not applicable for Special Crafts:

L. Residual Strength

M. Amphibious Warfare

N. Provisions for Flight Operations 1. In general for Special Crafts only a winching area for vertical transfer of personnel and light sup- plies

has to be provided. If there would be a helicopter landing deck (even without refuelling system), then a

fire fighting system will be required, see the TL Rules for Machinery (Chapter 4), Section 18.

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 4 ........................................................................................................................................................... 2

Propulsion Plants ............................................................................................................................................ 2

Preamble .......................................................................................................................................................... 2

A. General Rules and Instructions ............................................................................................................... 2

1. Essential equipment ................................................................................................................................... 2

B. Internal Combustion Engines .................................................................................................................. 2

1. Shipboard trials (harbour and sea trials) ................................................................................................. 2

2. Crankcase safety devices ......................................................................................................................... 2

3. Control equipment and alarms ................................................................................................................. 2

C. Thermal Turbomachinery .......................................................................................................................... 2

D. Main Shafting .............................................................................................................................................. 2

2. Shaft alignment ........................................................................................................................................... 3

3. Shaft earthing .............................................................................................................................................. 3

E. Gears, Couplings ........................................................................................................................................ 3

1. Application factor KA ................................................................................................................................... 3

2. Flexible Couplings ...................................................................................................................................... 3

3. Clutches ....................................................................................................................................................... 3

F. Propeller ....................................................................................................................................................... 3

G. Lateral Thrust Units ................................................................................................................................... 3

H. Torsional Vibrations ................................................................................................................................... 3

I. Spare Parts ................................................................................................................................................... 3

J. Ice Class ....................................................................................................................................................... 3

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 4

Propulsion Plants

Preamble

If it is a navy patrol boat/vessel, and if the Machinery rules do not address the system or component, Navy Rules can be applied at the discretion of the TL.

A. General Rules and Instructions

1. Essential equipment For essential equipment see TL Rules for Machinery (Chapter 4), Section 1, H.

B. Internal Combustion Engines

TL Chapter 4, Section 2, Table 2.1 is to be applied for approval. For approved materials and type of test Certificate the new designations for test Certificates are to be used. For the reference or materials and type of test certificate refer to TL Chapter 4, Table 2.2. For pressure tests see TL Chapter 4, Section 2, Table 2.8.

1. Shipboard trials (harbour and sea trials) TL Additional Rules for “Gemilerde yapılacak seyir tecrübeleri ile ilgili esaslar” (Sea Trials of Motor Vessels) can be used.

2. Crankcase safety devices TL Rules for Machinery (Chapter 4), Section 2, F.4. is to be applied.

3. Control equipment and alarms TL Rules for Machinery (Chapter 4), Section 2, I. and J. are to be applied.

C. Thermal Turbomachinery TL Rules for Machinery (Chapter 4), Section 3 is to be applied to Special Crafts.

D. Main Shafting 1. Cast resin mounting This subject is to be considered with TL specifically.

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

2. Shaft alignment

For the arrangement of the shaft bearings of the propulsion plant an alignment calculation, including alignment instruction, has to be submitted. With consent of TL for shafting with an intermediate shaft diameter < 200 mm the alignment calculation may be waived.

3. Shaft earthing

Shaft earthing is to be provided according to TL Rules for Machinery (Chapter 4), Section 2, E.6.4.

E. Gears, Couplings

1. Application factor KA The application factor KA takes into account the increase in rated torque caused by superimposed dynamical or impact loads. KA is determined for main and auxiliary systems in accordance with TL Chapter 4, Section 7, Table 7.3.

2. Flexible Couplings TL Rules for Machinery (Chapter 4), Section 7, G.2. is to be applied.

3. Clutches TL Rules for Machinery (Chapter 4), Section 7, G.4. is to be applied.

F. Propeller For design and dimensioning of propellers see TL Chapter 4, Machinery, Section 8.

Alternative design methods which guarantee the same safety level may be submitted to TL for approval.

G. Lateral Thrust Units For lateral thrust units see TL Chapter 4, Machinery, Section 9, C.

H. Torsional Vibrations For torsional vibrations see TL Chapter 4, Machinery, Section 6.

I. Spare Parts Depending on the Service Area Notation it may be discussed with TL to determine an adequate amount

of spare parts in similar way as practiced in the TL Rules for Machinery (Chapter 4), Section 17.

J. Ice Class

For ice class notation see TL Chapter 4, Machinery, Section 19.

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 5 ........................................................................................................................................................... 2

Electrical Installations ..................................................................................................................................... 2

A. General .............................................................................................................................................. 2

B. Requirements........................................................................................................................................... 2

1. Emergency power supply ............................................................................................................... 2

1.1 Types of power supply .................................................................................................................... 2

1.2 Emergency consumers ................................................................................................................... 2

1.3 Power balance ................................................................................................................................. 2

1.4 Required duration of emergency power supply .............................................................................. 3

2. Cables and their installation ........................................................................................................... 3

2.1 Wire braids ........................................................................................................................................ 3

2.2 Cable laying for circuits (systems with return) ................................................................................ 3

2.3 Installation of non-metallic pipes and ducts .................................................................................... 3

2.4 Cable installation in refrigeration spaces ..................................................................................... 3

3. Tests .................................................................................................................................................. 3

3.1 One's own-responsibility tests made by the manufacturers in its works .................................... 3

3.2 Type tests ............................................................................................................................................. 4

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 5

Electrical Installations

A. General

The selection procedure for applicable rules and regulations for electrical installations of Special Crafts is shown in flow-chart in Section 8, 5.1.

B. Requirements As far as no comments to the respective rules and regulations shown in flow-chart in Section 8 are given in the following, the requirements therein are valid for all types of Special Crafts.

1. Emergency power supply

1.1 Types of power supply

1.1.1 For the emergency power supply may be provided: – batteries (especially for smaller Special Crafts) – diesel generator set – second power station

1.1.2 If other types as lead-acid or nickel-cadmium batteries are planned, this has to be agreed with TL.

1.1.3 Ventilation of battery compartments is primarily to be provided for lead-acid batteries. Reference is made to the TL Rules for Electrical Installation (Chapter 5), Section 2, C.3.

1.2 Emergency consumers For non-naval Special Crafts the following emergency consumers are to be considered: – emergency lighting – navigation lights – radio equipment

– fire detection and fire alarm system, as far as applicable

– fire extinguishing equipment, as far as applicable

– internal signal and communication system, general alarm

– sound signalling system, if electrically powered

– daylight signalling lamp, if applicable

1.3 Power balance

1.3.1 A power balance for main power supply as well as for emergency power supply is to be established under consideration of simultaneous operation.

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

1.3.2 If only one main generator is provided, its performance shall be designed for at least 110 % of the maximum required power according to the power balance.

1.3.3 Switching-on and switching-off of the greatest consumer shall be possible (without battery buffering).

1.4 Required duration of emergency power supply

For the rules and regulations defined in flow-chart in Section 8 the following minimum required durations of emergency electrical power supply are to be considered:

– Yachts < 24 m: 8 hours

– Special Purpose Ships: 18 hours

– Yachts ≥ 24 m: 12 hours

– Seagoing Ships: 18 hours

– High Speed Craft: 5 resp.12 hours

2. Cables and their installation

2.1 Wire braids

Outer metallic wire braids shall have a coating of protective paint, which shall be lead-free and flame- retardant. The paint shall be of sufficiently low viscosity when applied to enable it to penetrate readily into the wire braid. When dry, it shall not flake off when the cable is bent around a mandrel with a diameter of 15 times that of the cable.

2.2 Cable laying for circuits (systems with return)

In three-phase systems with hull return the asymmetry of the currents in the three conductors of three-core cables shall not exceed 20 A.

2.3 Installation of non-metallic pipes and ducts

Further design details are contained in the TL Rules for Electrical Installation (Chapter 5), Section 12, D.6.

2.4 Cable installation in refrigeration spaces

Only cables without hull return are permitted in refrigerated rooms and in associated air cooler spaces. The earthing conductors shall be run together with the other cables from the relevant distribution panes.

3. Tests

3.1 One's own-responsibility tests made by the manufacturers in its works

There is the possibility that certain products may be tested on the manufacturer's own responsibility if the following pre-conditions are fulfilled:

– the product is agreed with TL

– a QM system recognized by TL is available

– TL has carried out type tests of the products

– the one's-own responsibility tests have been agreed with TL

4

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Reference is made to the TL Additional Rules for “Mekanik ve Elektroteknik Ürünlerin Muayenesi İçin Kurallar” (the Inspection of Mechanical and Electrotechnical Products).

3.2 Type tests

The following products are additionally subject to mandatory type tests:

- Cable trays/protective casings made of plastic materials are to be type tested in accordance with lACS

UR E16. For guidance on testing, refer to lACS REC 73.

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 6 ........................................................................................................................................................... 2

Automation ....................................................................................................................................................... 2

A. General .............................................................................................................................................. 2

1. Selection of rules ............................................................................................................................. 2

B. Remote Control ................................................................................................................................. 2

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 6

Automation

A. General

1. Selection of rules The selection procedure for applicable rules and regulations for automation of Special Crafts is defined in flow-chart in Section 8.

B. Remote Control 1. Special requirements for remote control of main engines may be applied as defined in the TL Rules for Fishing Vessels (Chapter 14), Section 38.

2. The Class Notation K (Coastal Service) is not valid for Special Crafts.

3. Special Crafts having machinery plants built, equipped, surveyed and tested in compliance with

the remaining requirements may be assigned the Class Notation R-Remote Control.

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 7 ........................................................................................................................................................... 2

Ship Operation Installations and Auxiliary Systems .................................................................................. 2

A. General Rules and Instructions ................................................................................................................ 2

1. Essential equipment ................................................................................................................................... 2

2. Steering Gears and Stabilizers ................................................................................................................. 2

3. Lifting Appliances and Lifts ....................................................................................................................... 2

4. Starting Equipment and Air Compressors .............................................................................................. 2

5. Storage of Liquid Fuels, Lubricating and Hydraulic Oils as well as Oil Residues ............................ 2

5.1 Selection of rules ...................................................................................................................................... 2

5.2 Special Crafts up to 24 m length ........................................................................................................... 2

5.3 Other Rules ............................................................................................................................................... 2

6. Piping Systems, Valves and Pumps ........................................................................................................ 3

6.1 Selection of rules ...................................................................................................................................... 3

6.2 Special Crafts with L up to 24 m and TL HSC Rules not to be applied ........................................... 3

6.3 Special Crafts with 24 m ≤ L ≤ 50 m and TL HSC Rules not to be applied .................................... 3

6.4 Special Crafts where HSC terms are met ............................................................................................ 3

7. Fire Protection and Fire Extinguishing Equipment ................................................................................ 3

7.1 Selection of rules ...................................................................................................................................... 3

7.2 Naval and Non-naval Special Crafts ..................................................................................................... 3

8. Solid Waste Handling System .................................................................................................................. 3

9. Ventilation Systems .................................................................................................................................... 4

10. Hydraulic Systems .................................................................................................................................... 4

11. Pressure Vessels ...................................................................................................................................... 4

12. Oil Firing Equipment ................................................................................................................................. 4

13. Spare Parts ................................................................................................................................................ 4

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 7

Ship Operation Installations and Auxiliary Systems

A. General Rules and Instructions

1. Essential equipment For essential equipment see Section 1, E.5.

2. Steering Gears and Stabilizers For steering gears and stabilizers see TL Rules for Machinery (Chapter 4), Section 9.

3. Lifting Appliances and Lifts

For lifting appliances and lifts see TL Rules for Regulation for Lifting Appliances (Chapter 50).

4. Starting Equipment and Air Compressors Starting of multi-engines installations with compressed air TL Additional Rules for “Gemilerde yapilacak seyir tecrübeleri ile ilgili esaslar” (Sea Trials of Motor Vessels) may be observed.

5. Storage of Liquid Fuels, Lubricating and Hydraulic Oils as well as Oil Residues

5.1 Selection of rules A selection procedure for the applicable rules concerning storage of liquids in tanks of Special Crafts is given in flow-chart in Section 8, 6.1. Changeable tanks are tanks which may be used alternatively for liquid fuels or ballast water. Changeable tanks are to be treated as fuel tanks. If tank heating for liquid fuels becomes necessary (e.g. for Special Crafts with ice class), the requirements of the TL Rules for Machinery (Chapter 4), Section 16, V.2.5 are to be considered.

5.2 Special Crafts up to 24 m length The TL Rules for Construction and Classification of Yachts (Chapter 9), Section 7, E.9 are to be applied and the following requirements are to be considered: 5.2.1 Portable fuel tanks are not permitted. 5.2.2 The storage of gasoline/petrol and gasoline tanks are not permitted for the propulsion of the Patrol Boat as outboard motors are excluded, compare Section 1, A.2.2. 5.2.3 Fuel tanks made of plastics are not permitted.

5.3 Other Rules Other Rules are to be applied according to flow-chart in Section 8.

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

6. Piping Systems, Valves and Pumps

6.1 Selection of rules A selection procedure for the applicable rules and regulations concerning piping systems, valves and pumps of Special Crafts is given in flow-chart in Section 8. If plastic pipe systems shall be installed, the requirements of the TL Rules for Machinery (Chapter 4), Section 16, B.2.6. are to be considered. Plastic pipes are pipe class III and need a Manufacturer Test Report for approval. Testing of materials under supervision of TL is only necessary for pressure pipes with nominal diameter DN > 50 mm.

Pipes of aluminium or aluminium alloys are pipe class I or II and need for PB x DN > 1500 a TL Material Certificate and for PB x DN ≤ 1500 a Manufacturer Inspection Certificate for approval.

6.2 Special Crafts with L up to 24 m and TL HSC Rules not to be applied Special Crafts shall meet the requirements of the TL Rules for Construction and Classification of Yachts (Chapter 9), Section 7, E. and Appendix and additional requirements defined case by case.

6.3 Special Crafts with 24 m ≤ L ≤ 50 m and TL HSC Rules not to be applied 6.3.1 On principle Special Crafts shall meet the requirements of the TL Rules for Machinery (Chapter 4), Section 16 for "cargo ships" as far as applicable. The exceptions from this principle and/or special, deviating requirements are defined in the TL Rules for Construction and Classification of Yachts (Chapter 9), Section 7, E. and Appendix.

6.3.2 For Special Crafts of a length ≤ 50 m, Manufacturer Inspection Certificates according to the TL Rules for Material (Chapter 2) are sufficient for materials of fittings and valves in pipe classes I and II.

6.4 Special Crafts where HSC terms are met If the HSC terms according to the TL Rules for High Speed Craft (Chapter 7), Section 1, 1.3 (Application) or Owner’s request are met, the requirements for Auxiliary Systems of Section 10, Part A+C or Part A+B are to be considered.

7. Fire Protection and Fire Extinguishing Equipment

7.1 Selection of rules The selection procedure for applicable rules and regulations for fire extinguishing systems of Special Crafts is given in flow-chart in Section 8.

7.2 Naval and Non-naval Special Crafts The rules and regulations as shown in flow-chart in Section 8. are to be applied.

8. Solid Waste Handling System It can be assumed that only some waste compacting is applicable to Special Crafts.

4

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

9. Ventilation Systems For ventilation systems see TL Rules for Ventilation (Chapter 28).

10. Hydraulic Systems Testing of materials under supervision of TL is only necessary for pressure pipes with nominal diameter DN > 50 mm.

11. Pressure Vessels 11.1 In the case of hydrophore tanks with a maximum allowable working pressure of up to 7 bar gauge and a maximum working temperature of 100 °C an examination of the drawings can be dispensed with. 11.2 The requirements of this Section may not apply to pressure vessels with a maximum allowable working pressure of up to 0,5 bar gauge. 11.3 Electrically heated equipment has to be equipped with a temperature limiter besides of a temperature controller. 11.4 The equipment on pressure vessels has to be suitable for the use on ships. The limiters for e.g. pressure, temperature and flow are safety devices and have to meet the requirements of the TL Additional Rules for the “Tip Testlerinin Yapılması İle İlgili Kurallar” (Regulations for the Performance of the Type Tests). 11.5 It is recommended to perform the testing of gas cylinders according to the TL Rules for Machinery (Chapter 4), Section 14, G.5. Recognition of other tests may be agreed, if the requirements defined in the TL Rules for Machinery (Chapter 4), Section 14, G.7. are considered.

12. Oil Firing Equipment As boilers will in general not be provided for Special Crafts this item is in general not relevant.

13. Spare Parts Depending on the Service Are Notation it may be discussed with TL to determine an adequate amount of spare parts in similar way as practiced in the TL Rules for Machinery (Chapter 4), Section 17.

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents

Section 1 ........................................................................................................................................................... 3

General Requirements and References ...................................................................................................... 3

A. Scope and Application ..................................................................................................................... 3

1. Intention ............................................................................................................................................. 3

2. Application ........................................................................................................................................ 3

3. Scope................................................................................................................................................. 3

4. Equivalence ...................................................................................................................................... 4

5. Statutory rules and regulations ...................................................................................................... 4

B. Definitions .......................................................................................................................................... 4

1. General .............................................................................................................................................. 4

1.1 High speed craft ............................................................................................................................... 4

1.2 Non-crew persons ........................................................................................................................... 4

1.3 Special personnel ............................................................................................................................ 4

1.4 Embarked personnel ....................................................................................................................... 4

1.5 Passenger ......................................................................................................................................... 4

1.6 Main dimensions ............................................................................................................................. 4

2. Types of Special Crafts ...................................................................................................................... 5

2.1 Patrol Boat ........................................................................................................................................ 5

C. Required Data and Documents ...................................................................................................... 5

1. General information and data ........................................................................................................ 5

1.1 Functional demands ........................................................................................................................ 5

1.2 Basic Special Crafts parameters ................................................................................................... 5

1.3 Regulations ....................................................................................................................................... 5

1.4 Building specification ....................................................................................................................... 5

2. Documents to be submitted for approval ..................................................................................... 6

2.1 Submission ....................................................................................................................................... 6

2.2 Language .......................................................................................................................................... 6

2.3 Calculations ...................................................................................................................................... 6

2.4 Computer programs ........................................................................................................................ 6

2.5 List of documents ............................................................................................................................. 6

2.6 Additional documentation ............................................................................................................... 6

2.8 Surveys ............................................................................................................................................. 7

3. Production standard ........................................................................................................................ 7

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

4. Documents to be carried on board ................................................................................................ 7

D. Rules and Regulations to be considered ...................................................................................... 7

1. TL Rules ............................................................................................................................................ 7

2. IACS Recommendations ................................................................................................................ 7

3. International Conventions and Codes .......................................................................................... 7

E. Technical Requirements.................................................................................................................. 8

1. Ambient conditions .......................................................................................................................... 8

2. Environmental conditions ....................................................................................................................... 8

3. Workmanship ........................................................................................................................................... 8

4. Corrosion protection ........................................................................................................................ 9

5. Essential equipment ........................................................................................................................ 9

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Section 1

General Requirements and References

A. Scope and Application

1. Intention

The intention of these Rules is to facilitate the use of the Rules of TL by clients who want to design and build Special Crafts. The purpose of these rules is to find out the applicable rules by using flow-charts in Section 8. The types of Special Crafts are defined in B.2.

2. Application

2.1 These Rules are applicable:

– hull structures for monohulls, catamarans, SWATH, hydrofoil

– materials for hull structures including steel, austenitic stainless steel, aluminium alloys, fibre reinforced plastics (FRP), wooden and polyethylene

– ship equipment

– complete propulsion plants with diesel engines, gas turbines or any other propulsion plants.

– electrical and electronic equipment

– relevant automated equipment

– relevant auxiliary systems

– non-crew persons up to 60 persons

– up to 12 passengers

2.2 These Rules do not consider:

– steam propulsion

– low speed diesel engines and reversible two-stroke diesel engines

– heavy fuel operation and treatment

– outboard motors using gasoline for the propulsion of the Craft.

– lifting appliances and lifts

– special, complex equipment for replenishment at sea, besides replenishment of liquids via the stern

– amphibious warfare

– aircraft handling

– provision for flight operations other than winching

– special requirements for weapon systems besides foundations

– auxiliary steam boilers and oil firing equipment

– diving systems and systems for breathing gases

– non-crew persons above 60 persons

- more than 12 passengers

3. Scope These Rules summarize relevant TL Rules (and also the Code of Safety for Special Purpose Ships, 2008) which can be used for the Classification of naval and non-naval Patrol Boats and other special type of crafts less than 50 m. waterline length.

4

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

4. Equivalence Special Crafts deviating from the TL Rules in structure or equipment or some of their parts may be classed, provided that their structures or equipment are found to be equivalent to the TL requirements for this Class of vessels.

5. Statutory rules and regulations

For application of statutory rules and regulations, refer to TL Classifcation and Surveys Rules. In case of craft is classed as a Naval Craft relevant requirements to be applied are defined for Naval Patrol Crafts in TL Naval Ship Technology, Chapter 101 instead of TL Classification and Surveys.

B. Definitions

1. General

1.1 High speed craft 1.1.1 High speed craft according to the International Code of Safety, 2000 (HSC-Code) are passenger and cargo craft which do not proceed in the course of their voyage more than 4 hours at operational speed from a place of refuge (8 hours for more than 500 gross tonnage for cargo crafts) and are capable of a maximum speed of at least:

vmax = 3, 7 ⋅ Δ0,1667 [m / s]

Δ = displacement volume at design water line [m³] Craft the hull of which is supported completely clear above water surface in non-displacement mode by aerodynamic forces generated by ground effect are excluded. The Code does originally not apply to craft of war and troop craft.

1.2 Non-crew persons Non-crew persons are special personnel, embarked personnel and passengers for whom permanent ac- commodation is provided on board. The number of non-crew persons may include up to 12 passengers.

1.3 Special personnel The term "Special Personnel" is as defined in the IMO’s "Code of Safety for Special Purpose Ships, 2008" (see.IMO MSC.266(84) as amended by MSC.299 (87)).

1.4 Embarked personnel Embarked personnel are persons who are not members of the crew and carried on board in conjunction with the purpose of the boat. Embarked personnel are expected to be very fit, well-disciplined and able-bodied.

1.5 Passenger The term "Passenger" is as defined in SOLAS 74 as amended.

1.6 Main dimensions The principal dimensions of Special Crafts are defined in:

5

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

– TL Rules for High Speed Craft (Chapter 7), Section 1, 1.4. – TL Rules for Construction and Classification of Yachts (Chapter 9), Section 2, A.4.

2. Types of Special Crafts

2.1 Patrol Boat A patrol boat is a small naval, coast guard or police vessel, smaller in size than a corvette, commonly engaged in various border protection roles, including anti-smuggling, anti-terrorist, anti-piracy, fishery

patrols and immigration law enforcement. It is also often used for rescue operations and can be diversified in smaller Inshore Patrol Vessels and larger Offshore Patrol Vessels. In general Patrol Boats are classed 1 A5 PATROL BOAT or 1 A5 PATROL, 1 N5 PATROL BOAT; please refer to Section 2 and TL Classification and Surveys.

C. Required Data and Documents

1. General information and data In order to estimate the scope of Classification and Services, TL is to be provided with general information and project data as far as already available in the application phase. Naval Authority Requirements and Regulations should be included to general information data in case of a naval patrol boat.

1.1 Functional demands The functional demands include: – main task of special crafts, like general patrol – additional secondary tasks, like rescue, boarding, transport, etc.

1.2 Basic Special Crafts parameters

The basic parameters are: – type of hull, like monohull, catamaran, SWATH, hydrofoils

– main design parameters – area of operation – ambient and environmental conditions – expected lifetime [years] – materials for construction including special properties, corrosion protection measures, etc.

1.3 Regulations

Additional international and national regulations, as well as requirements of the Owner are to be defined.

1.4 Building specification The preliminary building specification or the technical part of a building contract (including sister ships, if any), if already available, shall be submitted.

6

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

2. Documents to be submitted for approval

2.1 Submission The documents are to be submitted in hard copy at least in triplicate. Operation manuals shall be submitted in a single set for information only. All documents have to indicate the project and revision number and the name of the Owner and/or the name of Shipyard. All documents are to be submitted at a sufficiently early date to ensure that they are approved and avail- able to the Surveyor at the beginning of the construction or installation of the boat or of important compo- nents.

2.2 Language All documents have to be submitted to TL in Turkish or English.

2.3 Calculations Calculations shall contain all necessary information concerning reference documents (parts of the specifi- cation, relevant drawings, etc.). Literature used for the calculations has to be cited. Any non-standard symbols used are to be explained in definitions.

2.4 Computer programs 2.4.1 In order to increase the flexibility in the structural design of Special Crafts TL also accepts direct calculations with computer programs. The aim of such analyses should be the proof of equivalence of a design with the rule requirements.

2.4.2 Direct calculations may also be used in order to optimise a design; in this case only the final

results are to be submitted for examination.

2.4.3 A computer program that has been demonstrated to produce reliable results to the satisfaction of the Classification Society is regarded as a recognised program. The purpose of such analyses should be the proof of equivalence of a design with the rule requirements. It is recommended that the designers consult the Classification Society on the suitability of the computer programs intended to be used prior to the commencement of any analysis work.

2.4.4 Direct calculations may be used in the following areas – global strength – longitudinal strength – beams and grillages – detailed strength For such calculations the computer model, the boundary conditions and load cases are to be agreed upon with TL. The calculation documents are to be submitted including input and output. During the examination it may prove necessary that TL perform independent comparative calculations.

2.5 List of documents For classification of a Special Craft the documents defined in Table 1.1 at the end of this Section have to be submitted, as far as applicable.

2.6 Additional documentation TL reserve the right to request additional documentation for an assessment.

7

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

2.7 Modifications and extensions Once the documents submitted have been approved by TL they are binding for the execution of the work. Subsequent modifications and extensions require the approval of TL before becoming effective.

2.8 Surveys Survey of the Special Crafts’ construction will be carried out on the basis of approved documents. The documentation has to contain all data necessary for final approval of the Special Crafts.

3. Production standard A production standard which considers the special requirements for the manufacturing of Special Crafts has to be defined by the Shipyard and accepted by TL.

4. Documents to be carried on board 4.1 The documents to be carried on board to allow quick action in case of surveys, special opera- tion and damage are primarily defined in:

– TL Rules for Naval Ships, Chapter 101, Section 1, F. for Class Certificate, survey statements, Stability Handbook, Loading Manual, as built drawings, etc.

4.2 Further data is contained in: – TL Rules for High Speed Craft (Chapter 7), Section 1, 1.12 and Section 18, 18.2 for Craft Operating Manual, Route Operational Manual, Training Manual, Maintenance and Servicing Manual / System.

D. Rules and Regulations to be considered

1. TL Rules

The following TL Rules are to be considered and therefore reference is made to them in these Rules:

– Classification and Surveys

– Chapter 1, Hull – Chapter 2, Material – Chapter 3, Welding

– Chapter 4, Machinery

– Chapter 4-1, Automation – Chapter 5, Electrical Installation

– Chapter 7, High Speed Craft

– Chapter 9, Construction and Classification of Yachts

In case of craft is classed as a Naval Craft relevant requirements to be applied are defined for Naval Patrol Crafts in TL Part E, Naval Ship Technology Rules.

2. IACS Recommendations The recommendations of the International Association of Classification Societies (IACS) have to be consid- ered as appropriate, e.g.: – Recommendation No. 99, Section 2 – FireSafety Measures

3. International Conventions and Codes Where reference is made to International Conventions and Codes these are defined as follows, e.g.:

8

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

– ICLL: International Convention of Load Lines, 1966, as amended

– MARPOL: International Convention for the Prevention of Pollution from Ships, 1973 including the 1978 Protocol as amended

– SOLAS: International Convention for the Safety of Life at Sea, 1974, as amended – IMO Resolution MSC.266(84) as amended by MSC.299(87): Code of Safety for Special Purpose

Ships, 2008

E. Technical Requirements

1. Ambient conditions

1.1 The ambient conditions are primarily defined in: – TL N a v a l Rules for Hull Structures and Ship Equipment (Chapter 102), Section 1, A.4., Table 1.1

respectively TL (Chapter 107), Section 1, D. for inclinations and movement of the Special Crafts.

– In case of Naval Patrol Boats more stringent requirements are defined there for Class Notation

AC1, more flexible requirements may be defined for Class Notation ACS. – In case of Naval Patrol Boats vibration should be considered for design, construction and installation

because of causing additional stresses. More information is contained in the TL Naval Rules for Hull Structures and Ship Equipment (Chapter 102), Section 16 and the TL Naval Rules for Propulsion Plants (Chapter 104), Section 1, D.2.

1.2 Further data is contained in: – TL Rules for High Speed Craft (Chapter 7), Section 9, C.9.1.16, Table 9.1. – TL Rules for Construction and Classification of Yachts (Chapter 9), Section 7, A.4.2., Table 7.1.

2. Environmental conditions

2.1 The environmental conditions are primarily defined in:

– In case of Naval Patrol Boats TL N a v a l Rules for Hull Structures and Ship Equipment (Chapter

102), Section 1, A.4., Table 1.2 for conditions of water, air, wind, ice, etc.

– In case of Naval Patrol Boats if shock is to be considered, the requirements of the TL Naval Rules for Hull Structures and Ship Equipment (Chapter 102), Section 16, D. are to be observed, but this is in general not subject to Classification.

2.2 Further data is contained in:

– TL Rules for High Speed Craft (Chapter 7), Section 9, 9.1.16, Table 9.2.

– TL Rules for Construction and Classification of Yachts (Chapter 9), Section 7, A.4.2., Table 7.2, 7.3

and 7.4.

3. Workmanship

The requirements for proper workmanship to be applied for Special Crafts are defined in the TL Rules for Hull (Chapter 1), Section 1, N. In case of Naval Patrol Boats the requirements for proper workmanship to be applied for Special Crafts are defined in the TL Naval Rules for Hull Structures and Ship Equipment (Chapter 102), Section 1, E.

9

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

4. Corrosion protection

The requirements to reduce the corrosion risk by measures in design are defined together with protection measures during construction and operation in the TL Rules for Hull (Chapter 1), Section 22. In case of Naval Patrol Boats the requirements to reduce the corrosion risk by measures in design are defined together with protection measures during construction and operation in the TL Naval Rules for Hull Structures and Ship Equipment (Chapter 102), Section 3, E. and F.

5. Essential equipment

The definition of essential equipment and list of essential components are contained.

10

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Table 1.1 Documentation to be submitted for Classification of Special Crafts

No. Description

General

1 General arrangement plan

2 Technical specification

3 Lines plan / Offset tables

4 Tank & capacity plan

Hull Structures and Ship Equipment

Hull

5 Midship section

6 Other typical sections

7 Bottom structure

8 Engine room structure (including engine foundation)

9 Shell expansion plan

10 Ice strengthening, if applicable

11 Decks

12 Superstructures and deckhouses

13 Bulkheads

14 Rudder body

15 Rudder stock

16 Rudder bearing, pintles and couplings, etc.

17 Large openings

18 Foundations

19 Welded joints for steel or aluminium

20 Coating plan

21 NDT-plan (Non-Destructive-Testing)

22 Equipment number and anchoring equipment

23 Mooring equipment

Supporting Calculation (Structure)

24 Design loads summarized in a load plan

25 Longitudinal strength calculation (if required by Naval Authority)

26 Local stress calculations, if applicable

27 Finite element analysis, if applicable

Safety Requirements of the Hull

28 External watertight integrity plan / Freeboard plan

29 Bulwarks and guard-rails

30 Intact stability calculations

31 Damage stability calculations

32 Damage control plan

33 Inclining test report

34 Structural fire protection

35 Documentation on storage rooms and transport lines for explosives (ammunition, missiles, etc.)

36 Masts

11

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Machinery Installations General

37

General arrangement of machinery spaces

Internal Combustion Engines

38 Data on main parameters for each type of internal combustion to be used

39 Detailed drawings of the complete engine, including cross/longitudinal sections

40 Documentation on provisions or additional equipment for low load operation of the engines, if applicable

Propulsion Systems

41 General drawings of the entire shafting

42 Component parts transmitting torque (shafting, couplings, bearings, etc.)

43 Propeller shaft brackets

44 Stern tube arrangement

45 Cast resin mount

46 Shaft alignment calculation

47 Assembly and sectional drawings of gears and couplings ( calculations, parts list)

48 Design drawings of propeller in main propulsion (for engine output in excess of 300 kW)

49 Design drawings of transverse thrust systems (for engine output in excess of 100 kW)

50 General drawings, sectional drawings and functional characteristic of controllable pitch propeller unit

51 Rudder propeller/Podded drives, if applicable

Electrical Installations

Power Plant

52 Details of the scope and type electrical plant

53 Details about the construction of electrical equipment in hazardous areas

54 General layout for electrical power generation and distribution

55 Details on generations and UPS units

56 Details on hazardous areas

57 Short circuit calculation

58 Electrical power balance

59 Details on main and emergency switchgear, main distribution boards

60 Details on lighting network

61 Details on concept to avoid radiation hazards

62 Documentation on switchgear, monitoring and controls for the refrigerating plant

63 Main cableways for different voltage systems

64 Details in electromagnetic compatibility measures

65 Bulkhead/deck penetrations

66 Cable layout/-list

Manoeuvring System

67 Details on steering gear drive and control system

68 Details on rudder propeller and lateral thrust system, if applicable

69 Controllable pitch propeller system, if applicable

12

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

70 Details on dynamic positioning system, if applicable

Lighting

71 Lighting arrangement

72 Documentation on light fittings and sockets used

Control and Alarm System

73 Monitoring and safety systems for machinery

74 Starting arrangements for main and auxiliary engines

75 Control and regulation for essential equipment and drives

76 Documentation on general and special alarm systems

77 Documentation on position and navigation lights

78 Documentation on fire and CO2 alarm system

79 Documentation on watertight and fire door operation and position monitoring system

80 Documentation on tank level indicators, alarms, shut-off facilities

81 Documentation on all essential intercommunication systems

Board Computer

82 Hardware and software documentation on computers (as relevant for Classification)

Propulsion

83 Electrical propulsion plants, if applicable

Automation

84 General layout and arrangement

85 Description of functional relationships

86 Software documentation

87 List of sensor types and location for the monitoring system

88 Safety programmes giving details of limit values

89 Details of bridge arrangement

Auxiliary Systems and Equipment

Pressure vessels

90 List of pressure vessels and equipment

Tanks and piping

91 Details on fuel and oil tanks

92 Diagrammatic plans of all piping systems

93 Details on remotely controlled valves

94 Replenishment at sea system

Fire extinguishing systems

95 Water fire extinguishing equipment

96 CO2 fire extinguishing system, if applicable

97 Foam extinguishing systems

98 Details of all other fire fighting systems and equipment

99 Fire control plan

Equipment

100 Steering gear

101 Rudder propeller units, if applicable

102 Anchor windlasses

103 Fire door control system

104 Replenishment at sea system

105 Hydraulic systems for special devices, if safety-relevant

Other Documents

106 Operation and maintenance manuals, if required

1

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

Contents A. PATROL BOAT .............................................................................................................................. 2

1. Watertight/Weathertight Integrity .................................................................................................... 2

1.1 Flow-chart ...................................................................................................................................... 2

2. Stability ............................................................................................................................................ 3

2.1 Flow-chart ...................................................................................................................................... 3

2.2 Further Requirements ..................................................................................................................... 4

2.2.1 Intact Stability ............................................................................................................................. 4

2.2.2 Reserve buoyancy ........................................................................................................................ 4

3. Design of Hull Structures ................................................................................................................. 5

3.1 Flow-chart ...................................................................................................................................... 5

4. Structural Fire Protection ................................................................................................................. 6

4.1 Flow-chart ...................................................................................................................................... 6

4.2 Further Requirements ..................................................................................................................... 7

4.2.1 General ........................................................................................................................................ 7

4.2.2 Escape ways and arrangement ..................................................................................................... 7

4.2.3 Fire Detection .............................................................................................................................. 8

4.2.3.1 Fire detection systems .............................................................................................................. 8

5. Electrical Installations and Automation ........................................................................................... 9

5.1 Flow-chart ...................................................................................................................................... 9

5.2 Further Requirements ................................................................................................................... 10

5.2.1 Emergency source of electrical power ...................................................................................... 10

6. Tanks, Piping Systems and Pumps ................................................................................................. 11

6.1 Flow-chart .................................................................................................................................... 11

6.2 Further Requirements ................................................................................................................... 12

6.2.1 General ...................................................................................................................................... 12

6.2.2 Bilge Pumping ........................................................................................................................... 12

6.2.3 Pumps ........................................................................................................................................ 12

7. Fire Extinguishing Systems ............................................................................................................ 13

7.1 Flow-chart .................................................................................................................................... 13

7.2 Further Requirements ................................................................................................................... 14

7.2.1 Extinguishing Systems .............................................................................................................. 14

7.2.2 Portable extinguishers ............................................................................................................... 14

7.2.3 Fire pumps and fire main ........................................................................................................... 14

7.2.4 Equipments ................................................................................................................................ 14

8. Equipment Number ........................................................................................................................ 15

8.1 Flow-chart .................................................................................................................................... 15

2

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

A. PATROL BOAT

1. Watertight/Weathertight Integrity

1.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Selection of rules and regulations for the watertight/weathertight integrity

TL CONSTRUCTION

and CLASSIFICATION

of YACHTSCHAPTER 9

SECTION 2, A.5

INT. CONVENTIONon LOAD LINES, 1966,

as Amended by the

Protocol of 1988

HSC terms

are met?

L= or >24 m

START

FINISH

NO

NO YES

TL CONSTRUCTION

and CLASSIFICATION

of YACHTSCHAPTER 9

SECTION 2, A.5

TL HSC RULESCHAPTER 7

SECTION 2

PART A, 2.2

L= or >24 mN O YES

YES

TL RULESCHAPTER 1

SECTIONS 11 and 26

3

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

2. Stability

2.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Selection of rules and regulations for stability

ISO 12217-1

(Design Category A.) or

ISO 12217-2

(Design Category A.)

HSC terms

are met?

L= or >24 m

START

FINISH

NO

YESNO

TL HSC RULES

CHAPTER 7SECTION 2

PART A + C

L= or >24 m YESNO

YES

INTACT STABILITY

2.3 - 2.5

Carrying more than

12 non-crew persons?N O

TL HSC RULES

CHAPTER 7

SECTION 2PART A + C

INTACT STABILITY

2.3 - 2.5

DAMAGE STABILITY

2.6

TL HSC RULES

CHAPTER 7

SECTION 2PART B

YES

INTACT STABILITY2.10 - 2.12

DAMAGE STABILITY

2.13

Carrying more than12 non-crew persons?

NO

TL CONSTRUCTION

and CLASSIFICATIONof YACHTS

CHAPTER 9

SECTION 12

INTACT STABILITYA + B.1 - B.5

DAMAGE STABILITY

B.6 - B.7

SPECIAL PURPOSESHIPS 2008

CHAPTER 2

( RES.MSC.266(84)amended by RES.

MSC.299(87) )

YES

INTACT STABILITY2.1

DAMAGE STABILITY

2.2L= or >48 mNO YES

4

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

2.2 Further Requirements

Following requirements are to be applied for patrol boats:

2.2.1 Intact Stability The stability requirements for assignment of main class are to be complied with.

2.2.2 Reserve buoyancy

2.2.2.1 Internal foam buoyancy units or similar may be accepted when inspection of structure is possible. Parts of essential structures should be readily accessible via a hatch or equivalent. 2.2.2.2 Foam buoyancy in the hull below waterline and enclosed superstructure may be included in the reserve buoyancy.

5

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

3. Design of Hull Structures

3.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Selection of rules and regulations for the design of hull structures

START

FINISH

NO

Aluminium?

YESV > VHSC

FRP?

N O Navy? YES

TL HSC RULES

CHAPTER 7

SECTION 3

Overall Loads: K3.4Local Loads: K3.5

TL NAVY RULES

CHAPTER 102SECTION 5

TL NAVY RULES

CHAPTER 102

SECTION 3, D.

YES

NO

YES

TL HSC RULES

CHAPTER 7

SECTION 3Fibre-reinforced

Plastic Craft:K3.8

TL NAVY RULESCHAPTER 102

Sections 3, 4, 6 - 17

TL NAVY RULESCHAPTER 102

Sections 3 - 17

Polyethylene

TENTATIVE RULES

FOR POLYETHYLENECRAFTS

C. Structural Design

(Applicable for L < 24 m)

NO

NO YES

6

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

4. Structural Fire Protection

4.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Determination of the structural fire protection rules

TL CONSTRUCTION

and CLASSIFICATION

of YACHTS

CHAPTER 9SECTION 10, A.5

START

FINISH

NO

TL HSC RULESCHAPTER 7

SECTION 4, 4.7

SECTION 7

Steel

orEquivalent Material

YESNO

YESCarrying more than 12

non-crew persons?

TL RULES

CHAPTER 1SECTION 21, C.

L= or > 24 m YES

Steelor

Equivalent MaterialY ESNO

TL HSC RULES

CHAPTER 7

SECTION 4, 4.7SECTION 7

= or > 500 GT YESNO

NO

IACS

RECOMMENDATIONNO.99

CHAPTER IV

SECTION 2

TL RULESCHAPTER 1

SECTION 21, C.

7

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

4.2 Further Requirements

Following requirements are to be applied for patrol boats:

4.2.1 General For crafts which are less than 24 m.; 4.2.1.1 Machinery spaces of major fire hazard, galleys above 10 m

2 and storage spaces for ammunition shall

be enclosed by steel or equivalent fire resisting divisions. For ammunition stores, the insulation shall be provided on the external boundaries of the space, except where bounding tanks, voids and open spaces. 4.2.1.2 Principal partition is to have an A-30 insulation. For steel structures, A-0 towards void and open spaces is considered sufficient. Note: A principal partition is the partition (bulkhead or deck) between machinery space on one hand and the steering position or cabin above or adjoining on the other. 4.2.1.3 No structural fire protection requirements are applicable to areas other than specified in first paragraph. 4.2.1.4 In spaces where the penetration of oil products is possible, the surface of insulation shall be impervious to oil or oil vapors. 4.2.1.5 Paints, varnishes and other finishes used on exposed interior surfaces are to be of an approved low flame-spread type and shall not be capable of producing excessive quantities of smoke and toxic products. 4.2.1.6 No requirements related to restricted use of combustible materials and smoke-tight division will apply.

4.2.2 Escape ways and arrangement 4.2.2.1 All spaces shall be provided with satisfactory means of escape through corridors, stairways or other spaces independent of the space considered, all with a minimum free opening of 700 mm in all directions. Where a secondary means of escape is required, this can be provided by a permanent ladder and hatch arrangement with a free opening of minimum 500 mm in all directions. Doors and hatches not capable of being unlocked from both sides shall not be regarded as an escape way. 4.2.2.2 Escape routes shall be separated from adjacent spaces by at least class B divisions. 4.2.2.3 Dead-end situations exceeding 7 m in length shall be avoided in any case. 4.2.2.4 For accommodation spaces, two means of escape from every restricted space or group of spaces shall be provided unless there is a means of escape that leads directly to the open deck. 4.2.2.5 For machinery spaces of major fire hazard, two means of escape shall be provided, except where the space has a length of less than 5 m and direct access to open deck is provided. 4.2.2.6 Below the lowest open deck at least one means of escape shall be independent of watertight doors. 4.2.2.7 Fire doors need not be remotely operated or self closing. However, where fire doors bounding areas of major fire hazard are not self closing, they shall be normally shut and fitted with indicators to provide warning in the control station when the doors are not completely closed. 4.2.2.8 Fuel oil tanks may be located contiguous to machinery spaces of major fire hazard provided the boundary between such spaces and fuel oil tanks are protected with 60 minutes fire-resisting divisions. 4.2.2.9 Petrol for auxiliary purposes may be stored in limited volume. Petrol shall only be stored on open deck or in compartments effectively ventilated to open deck. The storage position shall be so arranged that under no circumstances can inflammable or explosive fluids or gases accumulate, for example, in lower parts of the hull.

8

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

4.2.3 Fire Detection

4.2.3.1 Fire detection systems 4.2.3.1.1 An approved automatic fire detection and alarm system shall be installed, to indicate, at the craft's control station, the location of an outbreak of fire. In the event that the control station is unmanned, an audible alarm shall be automatically sounded throughout the crew compartments. 4.2.3.1.2 All enclosed spaces, except areas of no fire risk and limited areas of minor fire risk such as void spaces and bathrooms of limited area within cabins, shall be provided with fire detectors. Spaces with floor area below 4 m

2 and ceiling area below 6 m

2 shall in this context be considered spaces of limited area.

4.2.3.1.3 Patrol boats need not be fitted with TV cameras in main propulsion machinery room.

9

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

5. Electrical Installations and Automation

5.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Selection of rules and regulations for electrical installations and automation

SPECIAL PURPOSESHIPS 2008

CHAPTER 4

CHAPTER 5( RES.MSC.266(84)

amended by RES.

MSC.299(87) )

TL CONSTRUCTION

and CLASSIFICATION

of YACHTSCHAPTER 9

SECTION 8

SECTION 9

HSC terms

are met?

Carrying morethan 12 non-crew

persons?

START

FINISH

NO

NOYES

TL HSC RULESCHAPTER 7

SECTION 11

SECTION 12, PARTS A+C

TL HSC RULESCHAPTER 7

SECTION 11

SECTION 12, PARTS A+B

Carrying morethan 12 non-crew

persons?

YESNO

YES

10

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

5.2 Further Requirements

Following requirements are to be applied for patrol boats:

5.2.1 Emergency source of electrical power 5.2.1.1 Vessels with service area notation Y shall have an emergency source of electrical power located above the uppermost continuous deck and readily accessible from open deck. The services given in TL Rules for Electrical Installation (Chapter 5) shall be supplied by the emergency source of power for the period. 5.2.1.2 Vessels with service area notation Y - K50/20: Shall be provided with an emergency source of electrical power situated above the uppermost continuous deck and outside the machinery casings, capable of, for minimum 3 hours, supplying the following consumers: a) Emergency lighting at stowage positions of life-saving appliances, at all escape routes, in machinery spaces and the main and emergency generating spaces including their control positions, at control stations, at steering gears. b) Main navigation lights and “not under command” lights. c) Daylight signalling lamp (intermittent operation). d) Electrical internal communication equipment. e) Craft radio facilities (GMDSS). f) Craft's whistle (intermittent operation). g) Fire detection system. Fire alarm to have capacity for 0.5 hour. h) General alarm system (0.5 hour capacity for alarm). i) Remote control devices of fire-extinguishing systems (if fitted). j) Emergency fire pump when electrically driven (if fitted).

11

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

6. Tanks, Piping Systems and Pumps

6.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Selection of rules and regulations for tanks, piping systems and pumps

TL CONSTRUCTION

and CLASSIFICATION

of YACHTSCHAPTER 9

SECTION 7, E.

SECTION 7, APPENDIX

HSC terms

are met?

START

FINISH

NO

TL HSC RULES

CHAPTER 7SECTION 10, PART A+B

YES

Carrying more

than 12 non-crew

persons?

NO YES

TL HSC RULES

CHAPTER 7SECTION 10, PART A+C

12

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

6.2 Further Requirements

Following requirements are to be applied for patrol boats:

6.2.1 General Patrol boat is in general to comply with the requirements in Chapter 4, Section 16 with the modifications specified in this section.

6.2.2 Bilge Pumping Leakage detection shall be provided in all main compartments below the waterline i.e. forepeak, accommodation, double bottom, engine compartment etc.

6.2.3 Pumps The requirements for certificates for pumps will be specially considered.

13

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

7. Fire Extinguishing Systems

7.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Selection of rules and regulations for fire extinguishing systems

SPECIAL PURPOSE

SHIPS 2008CHAPTER 6

( RES.MSC.266(84)

amended by RES.MSC.299(87) )

TL CONSTRUCTION

and CLASSIFICATION

of YACHTSCHAPTER 9

SECTION 10

HSC terms

are met?

Carrying morethan 12 non-crew

persons?

START

FINISH

NO

NOYES

TL HSC RULES

CHAPTER 7SECTION 7

PART A, 7.7

PART B, 7.13

Carrying morethan 12 non-crew

persons?

YESNO

YES

TL HSC RULES

CHAPTER 7SECTION 7

PART A, 7.7

PART C, 7.16

14

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

7.2 Further Requirements

Following requirements are to be applied for patrol boats:

7.2.1 Extinguishing Systems 7.2.1.1 Spaces and galleys above 10 m

2 shall be fitted with a fixed fire extinguishing system according to

2000 HSC Code Ch. 7.7.3. 7.2.1.2 For areas of major fire hazard, remote control of the fixed extinguishing system from the control station is not required provided local manual control is in a safe and readily available position. 7.2.1.3 The quantity of gas required for one discharge is accepted as being sufficient where gas is used as the extinguishing medium. A minimum capacity of 40% of the gross volume of the complete machinery space is to be provided for when using CO2 systems. 7.2.1.4 For non-naval patrol boats deep fat cooking equipment and galley ducts, fixed extinguishing systems are not required. 7.2.1.5 Sprinkler system in accommodation is not required, irrespective of size.

7.2.2 Portable extinguishers 7.2.2.1 The number and type of extinguishers shall be according to MSC/Circ 1275. In any case, for each deck and main engine room at least 1 (one) extinguisher shall be provided. 7.2.2.2 The capacity shall be according to Fire Safety Systems Code (FSS Code) Chapter 4.3.1.1.

7.2.3 Fire pumps and fire main 7.2.3.1 Minimum one main fire pump shall be provided. 7.2.3.2 The capacity shall be at least 25 m

3/hr.

7.2.3.3 The pressure at hydrants shall be minimum 2.7 bars with any two hydrants in simultaneous operation. 7.2.3.4 Craft with an overall length of more than 40 m, or where the main fire pump is installed in a space not protected by a fixed fire extinguishing system, shall be fitted with an emergency fire pump with minimum capacity of 15 m

3/hr.

7.2.3.5 For hoses, hydrants and nozzles, 2000 HSC Code Ch.7.7.5 applies.

7.2.4 Equipments 7.2.4.1 A duplicate set of fire control plans is not required to be stored outside the deckhouse. 7.2.4.2 Patrol boats need not carry fireman's outfits.

15

TURK LOYDU – TENTATIVE RULES FOR THE CLASSIFICATION OF SPECIAL CRAFTS, PATROL BOAT - 2015

8. Equipment Number

8.1 Flow-chart

Following flow-chart is to be applied for patrol boats.

Determination of rules and regulations for equipment number

TL CONSTRUCTIONand CLASSIFICATION

of YACHTS

CHAPTER 9

SECTION 2, C.

HSC terms

are met?

START

FINISH

NO YES

TL HSC RULES

CHAPTER 7

SECTION 6, 6.5