passage 02 - etenders.gov.za - plans.pdf · cubicle shower cubicle d01 d01 d01 d01 d01 d01 d01 d01...

1
GENERAL NOTES: INTERNAL FLOOR COVERINGS: · All existing vinyl floor finishes to be removed and replaced with new full body porcelain tiles. WALLS: · All painted walls to be repainted to specifications. · Allow for removal of wall tiles in bathrooms & replace with new. CEILINGS: · Patch and repaint all damaged plasterboard ceilings. · Repaint all fibre cement ceilings. SKIRTINGS: · All timber skirtings to be removed and replaced with new 100mm high tiled skirting. CORNICE: · All damaged 44mmx22mm timber ceiling cornice to be replaced with new timber 44 x 22mm timber cornices. WINDOW CILLS: · All existing internal tiled window cills to be cleaned. DOORS & FRAMES: · All timber external doors to be replaced with new aluminium doors. · All dents to door frames to be repaired and frames repainted. · All existing varnished timber doors to be unhung, sanded down, varnished & rehung. CELL BLOCK SITE PLAN scale 1:1500 N ADMINISTRATION BUILDING WAITING FHR DRESSING ROOM EX: Vinyl tiles NEW: Porcelain tiles 24.9 sqm SAPS STORE EX: Vinyl tiles NEW: Porcelain tiles 28.7 sqm I.D WAITING RM. EX: Vinyl tiles NEW: Porcelain tiles 5.7 sqm FEMALE WC EX: Ceramic tiles NEW: Porcelain Tiles 6.2 sqm MALE WC EX: Ceramic tiles NEW: Porcelain Tiles 6.2 sqm VICTIM'S SUPPORT EX: Vinyl tiles NEW: Porcelain Tiles 10.35 sqm VIEWING ROOM EX: Vinyl tiles NEW: Porcelain Tiles 14.35 sqm LINE UP ROOM EX: Vinyl tiles NEW: Porcelain Tiles 20.9 sqm ID/PHOTO RM EX: Vinyl tiles NEW: Porcelain Tiles 5.6 sqm CSC PUBLIC AREA EX: Ceramic tiles 35.9 sqm CSC STAFF AREA EX: Ceramic tiles 18.8 sqm CUBICLES RADIO RM EX: Vinyl tiles NEW: Porcelain Tiles 10.5 sqm ARMAMENTS STRONG RM EX: Vinyl tiles NEW: Porcelain Tiles 6.2 sqm STATION COMMISSIONER EX: Vinyl tiles NEW: Porcelain Tiles 15.4 sqm TEA KITCHEN EX: Vinyl tiles NEW: Porcelain Tiles 6.2 sqm COMMITTEE ROOM EX: Vinyl tiles NEW: Porcelain Tiles 36.2 sqm STATIONERY STORE EX: Vinyl tiles NEW: Porcelain Tiles 20.4 sqm DFO/DPO ROOM EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm PROACTIVE ROOM EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm CRIME PREVENTION ROOM EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm ADMIN OFFICE EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm DOCUMENT STORE EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm CLEANER'S STORE EX: Vinyl tiles NEW: Porcelain Tiles 5.7 sqm FINGERPRINT RM EX: Ceramic tiles 7.1 sqm COMMUNICATIONS OFFICER EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm PASSAGE 03 EX: Ceramic tiles PASSAGE 02 EX: Ceramic tiles PASSAGE 01 EX: Ceramic tiles SUPPLY CHAIN OFFICE EX: Vinyl tiles NEW: Porcelain Tiles 10.0 sqm YARD Cement screed 21.4 sqm COVERED ENTRANCE EX: Cement screed 30.5 sqm SHWR SHWR WC WC UR UR Shower cubicle Shower cubicle D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D04 D07 D02 D02 D07 D01 D06 D01 B B C C COUNTER COUNTER COUNTER COUNTER WORK TOP WORK TOP COUNTER FHR COUNTER GROUND FLOOR PLAN scale 1:100 N WHB WHB WHB WHB D04 Remove all ex. sanitary fittings and fit new. Replace ex. timber skirting with new tiled skirting 100mm high. Remove all ex. ceramic tiles and lay new porcelain tiles. Dirty walls in dressing room to be cleaned with suitable cleaning agent. Remove damaged ceiling panels and replace with new. Ex. doors and shopfront to be removed and new aluminium shopfront and automatic sliding door installed. Replace ex. timber doors with new glazed aluminium doors. Replace ex. timber doors with new glazed aluminium doors. Replace ex. timber doors with new glazed aluminium doors. Replace ex. timber door with new semisolid core timber door. Sliding timber doors to be serviced and painted. Remove existing timber counters and fit new granite countertops. Remove existing built in cupboards and fit new with granite countertops Remove existing formica countertop and replace with new granite top. EXISTING LOCKERS NEW BENCHES NEW BENCHES D04 WHB D08 D08 D03 D05 D01 New built in benches to detail Remove existing door and replace with new. ex. shelves ex. shelves ex. shelves ex. shelves ex. shelves 2840 3695 2000 3095 3695 3695 3695 3695 5335 5534 1808 1588 3135 3060 3100 3163 3108 3100 3225 3667 9002 9810 4180 1713 32630 3683 2410 1270 3083 1015 4810 2885 7265 1380 3215 3215 3400 1000 890 1250 3215 3400 3220 3217 1200 2390 2338 1200 3775 2390 4470 3215 1030 1200 3080 2198 1760 2285 9385 6780 2385 1200 2980 980 7675 2770 1310 1320 4826 1100 8980 3225 3225 3225 3225 3225 3225 2385 8915 27905 7705 9606 2505 24391 EX. Concrete apron EX. Concrete apron EX. Concrete apron EX. Concrete apron EX. Concrete apron EX. Concrete apron 1990 1990 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w01 w02 w01 w01 w01 w01 w01 w01 w01 w03 w03 w05 w05 w02 w02 Remove ex. door and replace with new timber solid core door D09 980 w06 w07 w06 w07 w02 w02 w02 w02 w03 w03 w03 w03 w03 w02 w04 w04 w04 w04 w02 w02 w01 w03 1210 1270 1200 EX. RAMP UP 4825 ex. timber truss ex. steel screen 1000 DRESSING ROOM facebrick SAPS STORE face brick PASS- AGE YARD facebrick ex. conc. surface bed SECTION B-B scale 1:100 ex. conc. surface bed ex. conc. surface bed FFL 0.000 2600 U/S CEILING 2.600 600 Scrap off loose dirt and fungus on ex. roof tiles with trowel. Apply fungicide to surface of roof tiles. All ex.fibre cement fascia's to be repainted All steel screen frames to be sanded & repainted All steel screen frames to be sanded & repainted. Refer to paint specification Rake out grass and weeds in joints of concrete apron. Clean out sand in joints. Spray joints with weed killer. FFL -0.700 new porcelain tile finish new porcelain tile finish Existing painted plasterboard ceiling to be repainted Truss sprockets to be painted with carbolineum ex. tile finish new bench ex. shelves ex. shelves ex. shelves ex. shelves NGL NGL Concrete roof tiles Concrete roof tiles Concrete roof tiles NORTH ELEVATION scale 1:100 Facebrick Facebrick Concrete roof tiles Concrete roof tiles Concrete roof tiles WEST ELEVATION scale 1:100 Facebrick Facebrick Facebrick Concrete roof tiles Concrete roof tiles Concrete roof tiles SOUTH ELEVATION scale 1:100 Facebrick Facebrick Facebrick Concrete roof tiles ex. timber truss 1000 COMMITTEE ROOM facebrick PROACTIVE ROOM facebrick PASS- AGE SECTION C-C scale 1:100 ex. conc. surface bed ex. conc. surface bed FFL 0.000 2600 U/S CEILING 2.600 600 1000 Rake out grass and weeds in joints of concrete apron. Clean out sand in joints. Spray joints with weed killer. Scrap off loose dirt and fungus on ex. roof tiles with trowel. Apply fungicide to surface of roof tiles. All ex.fibre cement fascia's to be repainted Truss sprockets to be painted with carbolineum Existing painted plasterboard ceiling to be repainted Face brick walls to be jet cleaned.Brick dressing to be applied NGL NGL Ex. painted steel window and frame to be sanded and repainted. ex. plasterboard ceiling ex. plasterboard ceiling B B C C steel mesh screen steel mesh screen Scrap off loose dirt and fungus on roof tiles with trowel. Apply fungicide to surface of roof tiles. Scrap off loose dirt and fungus on roof tiles with trowel. Apply fungicide to surface of roof tiles. ROOF PLAN scale 1:150 N Sand and paint underside of steel frame of steel overhead screens to detail paint specifications. Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles Ex. Concrete roof tiles WINDOWS & FRAMES: · All existing painted steel windows and frames to be sanded down and re-painted. · All existing painted steel screen frames to be sanded down and re-painted. · Replace all blinds with new vertical fabric blinds. JOINERY/BUILT IN CUPBOARDS · All existing cupboards to be removed and replaced with new to specifications. See detail joinery drawings · All existing kitchen cupboards to be removed and replaced with new to specifications. IRONMONGERY · All existing door handles & locks to be replaced with new. See ironmongery schedule SANITARYWARE · All existing sanitary fittings to be removed and replaced with new. See sanitary schedule EXTERNAL GROUND COVERINGS: · All joints in concrete apron and external concrete floor coverings to be cleaned, sprayed with weed killer and joints sealed with cement sand mix. EXTERNAL WALLS: · All face brick external walls to be jet cleaned to remove loose dirt,fungus & moss. Stained areas to be treated in isolation with cleaning agent. Brick dressing to be applied EAVES: · Exposed timber eaves to be painted with 2 coats of carbolineum wood preservative. FASCIAS: · All painted fibre cement fascia boards to be repainted. ROOF COVERINGS: · Concrete roof tiles to be cleaned off loose dirt, moss and fungus. Fungicide to be applied to surface of tiles. 1:100/200/1:1500 consultant NOV 2014 drawing title ref. no. designed scale date type number checked drawing number: PLANS, SECTIONS, ELEVATIONS NO. DATE AMENDMENT NO. DATE NOTES Copyright vests in SAPS discipline service drawing title ARCHITECTURE SOUTH AFRICAN POLICE SERVICES REPAIRS AND MAINTENANCE TO MAKUYA POLICE STATION, HA MAKUYA, VHEMBE DISTRICT LIMPOPO. SOUTH AFRICAN POLICE SERVICES CRESSWELL ROAD ,SILVERTON PRETORIA, 0184 PL-AD- 01 - ADMINISTRATION

Upload: lyhanh

Post on 02-Jul-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PASSAGE 02 - etenders.gov.za - Plans.pdf · cubicle Shower cubicle D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 ... Ex. Concrete roof tiles WINDOWS & FRAMES: ·All existing

GENERAL NOTES:

INTERNAL

FLOOR COVERINGS:

· All existing vinyl floor finishes to be

removed and replaced with new full body

porcelain tiles.

WALLS:

· All painted walls to be repainted to

specifications.

· Allow for removal of wall tiles in bathrooms

& replace with new.

CEILINGS:

· Patch and repaint all damaged plasterboard

ceilings.

· Repaint all fibre cement ceilings.

SKIRTINGS:

· All timber skirtings to be removed and

replaced with new 100mm high tiled skirting.

CORNICE:

· All damaged 44mmx22mm timber ceiling

cornice to be replaced with new timber

44 x 22mm timber cornices.

WINDOW CILLS:

· All existing internal tiled window cills to be

cleaned.

DOORS & FRAMES:

· All timber external doors to be replaced with

new aluminium doors.

· All dents to door frames to be repaired and

frames repainted.

· All existing varnished timber doors to be

unhung, sanded down, varnished & rehung.

W

H

B

CELL BLOCK

SITE PLAN

scale 1:1500

N

ADMINISTRATION

BUILDING

WAITIN

G

FHR

DRESSING ROOMEX: Vinyl tiles

NEW: Porcelain tiles24.9 sqm SAPS STORE

EX: Vinyl tilesNEW: Porcelain tiles

28.7 sqm

I.D WAITING RM.EX: Vinyl tiles

NEW: Porcelain tiles5.7 sqm

FEMALE WCEX: Ceramic tiles

NEW: Porcelain Tiles6.2 sqm

MALE WCEX: Ceramic tiles

NEW: Porcelain Tiles6.2 sqm

VICTIM'S SUPPORTEX: Vinyl tiles

NEW: Porcelain Tiles10.35 sqm

VIEWING ROOMEX: Vinyl tiles

NEW: Porcelain Tiles14.35 sqm

LINE UP ROOMEX: Vinyl tiles

NEW: Porcelain Tiles20.9 sqm

ID/PHOTO RMEX: Vinyl tiles

NEW: Porcelain Tiles5.6 sqm

CSC PUBLIC AREAEX: Ceramic tiles

35.9 sqm

CSC STAFF AREAEX: Ceramic tiles

18.8 sqm

CUBICLES

RADIO RMEX: Vinyl tiles

NEW: Porcelain Tiles10.5 sqm

ARMAMENTSSTRONG RM

EX: Vinyl tilesNEW: Porcelain Tiles

6.2 sqm

STATION COMMISSIONEREX: Vinyl tiles

NEW: Porcelain Tiles15.4 sqm

TEAKITCHENEX: Vinyl tiles

NEW: Porcelain Tiles6.2 sqm

COMMITTEE ROOMEX: Vinyl tiles

NEW: Porcelain Tiles36.2 sqm

STATIONERY STOREEX: Vinyl tiles

NEW: Porcelain Tiles20.4 sqm

DFO/DPO ROOMEX: Vinyl tiles

NEW: Porcelain Tiles10.0 sqm

PROACTIVE ROOMEX: Vinyl tiles

NEW: Porcelain Tiles10.0 sqm

CRIME PREVENTIONROOMEX: Vinyl tiles

NEW: Porcelain Tiles10.0 sqm

ADMIN OFFICEEX: Vinyl tiles

NEW: Porcelain Tiles10.0 sqm

DOCUMENT STOREEX: Vinyl tiles

NEW: Porcelain Tiles10.0 sqm

CLE

AN

ER'S

STO

RE

EX: V

inyl

tile

sN

EW: P

orc

ela

in T

iles

5.7

sqm

FIN

GER

PR

INT

RM

EX: C

era

mic

tile

s7.

1 sq

m

COMMUNICATIONSOFFICEREX: Vinyl tiles

NEW: Porcelain Tiles10.0 sqm

PASSAGE 03EX: Ceramic tiles

PASS

AGE

02

EX: C

eram

ic ti

les

PA

SSA

GE

01EX

: Ce

ram

ic t

iles

SUPPLY CHAINOFFICE

EX: Vinyl tilesNEW: Porcelain Tiles

10.0 sqm

YARDCement screed

21.4 sqm

COVERED ENTRANCEEX: Cement screed

30.5 sqm

SHWR

SHWR

WC

WC

UR

UR

Showercubicle

Showercubicle

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01D01D01D01D01

D01 D01 D01 D01 D01

D01

D01

D01

D04

D07

D02

D02

D07

D01

D06

D01

BB

C

C

COUNTER

COUNTER

COUNTER

COUNTER

WO

RK

T

OP

WO

RK

T

OP

CO

UN

TE

R

FHR

COUNTER

GROUND FLOOR PLAN

scale 1:100

N

WHB

WHB

WHB

WHB

D04

Remove all ex. sanitary fittings and

fit new.

Replace ex. timber skirting with

new tiled skirting 100mm high.

Remove all ex. ceramic tiles and

lay new porcelain tiles.

Dirty walls in dressing room to be

cleaned with suitable cleaning

agent.

Remove damaged ceiling panels

and replace with new.

Ex. doors and shopfront to be

removed and new aluminium

shopfront and automatic sliding door

installed.

Replace ex. timber doors with new

glazed aluminium doors.

Replace ex. timber doors with new

glazed aluminium doors.

Replace ex. timber doors with new

glazed aluminium doors.

Replace ex. timber door with new

semisolid core timber door.

Sliding timber doors

to be serviced and

painted.

Remove existing timber counters

and fit new granite countertops.

Remove existing built in

cupboards and fit new with

granite countertops

Remove existing formica

countertop and replace with

new granite top.

EXISTING LOCKERS

NEW BENCHES

NE

W B

EN

CH

ES

D04

WHB

D08

D08

D03

D05

D01

New built in benches to detail

Remove existing door and

replace with new.

ex. sh

elve

se

x. sh

elve

s

ex. sh

elve

se

x. sh

elve

s

ex. shelves

2840

3695

2000

3095

3695

3695

3695

3695

5335

5534

1808

1588

31353060

3100 3163

3108

3100

3225

3667

9002

9810 41801713

32630

3683

24101270

3083

1015

4810

2885

7265

1380

3215

3215

3400

1000

890

1250

3215

3400

3220

3217

1200

2390

2338

1200

3775

2390

4470

3215

1030

1200

308021981760

2285

9385

6780

2385

1200

2980

9

8

0

7

6

7

5

2

7

7

0

1

3

1

0

1

3

2

0

4

8

2

6

1100

8980

3225

3225

3225

3225

3225

3225

2385

8915

27905

7705

9606

2505

24391

EX. C

on

cre

te a

pro

n

EX. C

on

cre

te a

pro

n

EX. Concrete apron EX. Concrete apron

EX. Concrete apron

EX. C

on

cre

te a

pro

n

1990

1990

w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03w01w02

w01w01w01w01w01w01w01 w03 w03 w05

w05

w02

w02

Remove ex. door and

replace with new timber

solid core door

D09

9

8

0

w06

w07

w06

w07

w02

w02

w02

w02

w03

w03

w03

w03

w03

w02

w04

w04

w04

w04

w02

w02

w01

w03

1210

1270

1200

EX. RAMP UP

4

8

2

5

ex. timber truss

ex. steel screen

1000

DRESSING ROOMfacebrick

SAPS STOREface brick

PASS-AGE

YARDfacebrick

ex. conc.

surface bed

SECTION B-B

scale 1:100

ex. conc.

surface bed

ex. conc.

surface bed

FFL 0.000

26

00

U/S CEILING 2.600

600

Scrap off loose dirt and

fungus on ex. roof tiles with

trowel. Apply fungicide to

surface of roof tiles.

All ex.fibre cement

fascia's to be repainted

All steel screen frames to

be sanded & repainted

All steel screen

frames to be sanded

& repainted. Refer to

paint specification

Rake out grass and weeds in

joints of concrete apron.

Clean out sand in joints.

Spray joints with weed killer.

FFL -0.700

new porcelain tile finish

new porcelain tile finish

Existing painted

plasterboard ceiling

to be repainted

Truss sprockets to be

painted with carbolineum

ex. tile finish

new bench

ex. shelves

ex. shelves

ex. shelves

ex. shelves

NGL

NGL

Concrete roof tiles Concrete roof tilesConcrete roof tiles

NORTH ELEVATION

scale 1:100 FacebrickFacebrick

Concrete roof tiles Concrete roof tilesConcrete roof tiles

WEST ELEVATION

scale 1:100

Facebrick

Facebrick

Facebrick

Concrete roof tiles Concrete roof tilesConcrete roof tiles

SOUTH ELEVATION

scale 1:100

Facebrick Facebrick Facebrick

Concrete roof tiles

ex. timber truss

1000

COMMITTEE ROOMfacebrick

PROACTIVE ROOMfacebrick

PASS-AGE

SECTION C-C

scale 1:100

ex. conc.surface bed

ex. conc.surface bed

FFL 0.000

26

00

U/S CEILING 2.600

600

1000

Rake out grass and weeds in

joints of concrete apron.

Clean out sand in joints.

Spray joints with weed killer.

Scrap off loose dirt and

fungus on ex. roof tiles with

trowel. Apply fungicide to

surface of roof tiles.

All ex.fibre cement

fascia's to be repainted

Truss sprockets to be

painted with carbolineum

Existing painted

plasterboard ceiling

to be repainted

Face brick walls to be jet

cleaned.Brick dressing to be

applied

NGL NGL

Ex. painted steel window

and frame to be sanded and

repainted.

ex. plasterboard ceiling ex. plasterboard ceiling

BB

C

C

steel mesh screen

steel mesh screen

Scrap off loose dirt and fungus

on roof tiles with trowel. Apply

fungicide to surface of roof

tiles.

Scrap off loose dirt and fungus

on roof tiles with trowel. Apply

fungicide to surface of roof

tiles.

ROOF PLAN

scale 1:150

N

Sand and paint underside

of steel frame of steel

overhead screens

to detail paint specifications.

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

E

x

.

C

o

n

c

r

e

t

e

r

o

o

f

t

i

l

e

s

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

Ex. Concrete roof tiles

WINDOWS & FRAMES:

· All existing painted steel windows and

frames to be sanded down and re-painted.

· All existing painted steel screen frames to

be sanded down and re-painted.

· Replace all blinds with new vertical fabric

blinds.

JOINERY/BUILT IN CUPBOARDS

· All existing cupboards to be removed and

replaced with new to specifications. See

detail joinery drawings

· All existing kitchen cupboards to be

removed and replaced with new to

specifications.

IRONMONGERY

· All existing door handles & locks to be

replaced with new. See ironmongery

schedule

SANITARYWARE

· All existing sanitary fittings to be removed

and replaced with new. See sanitary

schedule

EXTERNAL

GROUND COVERINGS:

· All joints in concrete apron and external

concrete floor coverings to be cleaned,

sprayed with weed killer and joints sealed

with cement sand mix.

EXTERNAL WALLS:

· All face brick external walls to be jet cleaned

to remove loose dirt,fungus & moss. Stained

areas to be treated in isolation with cleaning

agent. Brick dressing to be applied

EAVES:

· Exposed timber eaves to be painted with 2

coats of carbolineum wood preservative.

FASCIAS:

· All painted fibre cement fascia boards to be

repainted.

ROOF COVERINGS:

· Concrete roof tiles to be cleaned off loose

dirt, moss and fungus. Fungicide to be

applied to surface of tiles.

1:100/200/1:1500

consultant

NOV 2014

drawing title

ref. no.designed

scale

date

type number

checked

drawing number:

PLANS, SECTIONS, ELEVATIONS

NO. DATE AMENDMENT

NO. DATE NOTES

Copyright vests in SAPS

discipline

service

drawing title

ARCHITECTURE

SOUTH AFRICAN POLICE SERVICES

REPAIRS AND MAINTENANCE

TO MAKUYA POLICE STATION,

HA MAKUYA, VHEMBE DISTRICT

LIMPOPO.

SOUTH AFRICAN POLICE SERVICES

CRESSWELL ROAD ,SILVERTONPRETORIA, 0184

PL-AD- 01

- ADMINISTRATION

AutoCAD SHX Text
N.G.L