paul drumm; 3rd December 2004; AFC MM
1
Why?
• Goal: Ultimate (CCLRC defined)Safety & Design Review
– How do we get there?• We need a Process
– What is needed?• Full Safety & Design assessment
– How do we ensure success?• Assessment within MICE but outside of the working groups
• Propose Design & Safety Working Group– Based on group involved in AFCSWG¹– Expanded to cover all MICE – in a timely manner
¹ but with fewer letters – easier to repeat!
paul drumm; 3rd December 2004; AFC MM
2
AFCSWG – as was
• Original Concept for Absorber and Hydrogen System
• Process* heavy for most of MICE
• Ultimate goal stands
Outline designs
Preliminary Assessments
Proposal for final choice
Detailed design
Manufacture and installation
Permission to operate
RAL Defined Review
Failure ModesStress CalculationsInterlocks &Operational ProceduresContingency PlansPressure Vessel &ATEX regulations….
Hazard and Operability Assessment
Working Group
SequenceDocuments Required
MICE Hydrogen Safety Review Procedure
OK for detailed design
OK to Manufacture
Preliminary Hazard and Operability Assessments
ISIS Safety Officer
Reviews
Panel Review
+
+
*
paul drumm; 3rd December 2004; AFC MM
3
Morph to D&SWG…
• Role of existing working groups unchanged• Character and role of the “review panel” is
different:– Internal “audit” process
• unless D&SWG advises that an independent review is needed (matter of risk & competence within MICE)
– D&SWG guides documentation preparation through a series of audits
– D&SWG to assess the documentation• Not the same as a review (less overhead)
– Informs TB & EB on readiness for final review
paul drumm; 3rd December 2004; AFC MM
4
From Document... toPresentation byVideo?
Task LeaderTask Members
ProcessWing Design & Safety Group
Agree Procedure
Develop Concepts & DesignPrepare documentation
Review fit for purpose Documents ok
Pre-manufacture
Acceptance
Document Review
Review
FINALDocument
Audit
Detail Design & Safety…
Manufacture & Install
Operate
Rehearsal
RAL Review
RAL
Audit & Advise
Support
Audit & Advise
You are here!
Agree when ready
Agree when ready
Invitees?
Task LeaderTask Members
Task LeaderTask Members
Advice?
paul drumm; 3rd December 2004; AFC MM
5
Phase 1 Time Scales
• Beam Line needs to be in place end of 2006– Complete beam line review by end 2005– Radiation shielding is a more delicate matter– Target is a potential risk to ISIS operations– Beam Line is (probably low risk)
• ISIS/EID engineering staff• Following established & proven practices
• Spectrometer & Tracker– Low risk
• R&D activities– Medium - Potentially High – design to achieve Low Risk