paul goldsmith, west connex delivery authority: outlook for sydney’s westconnex
DESCRIPTION
Paul Goldsmith, Acting Chief Executive, WestConnex Delivery Authority delivered this presentation at the 2013 Australian Tunnelling conference. The two day conference is supported by the Australasian Tunnelling Society and brings together tunnelling leaders, engineers and industry experts to share best practice in tunnelling design, construction, safety and maintenance. The 2012 program focussed on updates from Australasia’s current and future projects, plus case studies from leading International projects - sharing best practice and lessons learnt from the forefront of the latest tunnelling projects. For more information about the event, please visit the conference website: http://www.informa.com.au/tunnellingconferenceTRANSCRIPT
![Page 1: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/1.jpg)
WestConnex 21 November 2013
![Page 2: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/2.jpg)
Overview
• Overview of WestConnex
• Tunnel design
• Industry engagement process
• Questions
WestConnex 2
![Page 3: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/3.jpg)
WestConnex: What is it? 21 November 2013
![Page 4: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/4.jpg)
WestConnex video
![Page 5: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/5.jpg)
Reference Scheme
WestConnex 5
![Page 6: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/6.jpg)
M4 Widening
![Page 7: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/7.jpg)
M4 East
![Page 8: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/8.jpg)
Stage 2
![Page 9: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/9.jpg)
Stage 3
![Page 10: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/10.jpg)
WestConnex: How it will be delivered 21 November 2013
![Page 11: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/11.jpg)
WestConnex Delivery Authority
WestConnex 11
• In addition, Department of Premier and Cabinet will chair a Customer Requirements Group that will provide a whole-of-government interface with the project
![Page 12: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/12.jpg)
Capital cost
• NSW Government funding - $1.8 billion
• Federal Government funding - $1.5 billion
WestConnex 12
![Page 13: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/13.jpg)
Construction timetable
WestConnex 13
![Page 14: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/14.jpg)
WestConnex: Stage 1
![Page 15: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/15.jpg)
Stage 1 video
![Page 16: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/16.jpg)
Stage 1 Reference Delivery Strategy
WestConnex 16
Work type Delivery model M4 Widening construction works Design and Construct
M4 East construction works Potentially: Design and Construct (publicly funded) Design and Construct (construction finance) Availability PPP
Operations and Maintenance works
Combined or separate Operations and Maintenance contract for Stage 1
Tolling works Separate Tolling services contract
Funding Government
Note: Reference delivery strategy for Stages 2 and 3 are similar
![Page 17: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/17.jpg)
WestConnex: Tunnel design
![Page 18: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/18.jpg)
Tunnel design challenges
• Traffic management systems and incident response
• Whole of life asset design
• Road capacity and design
• Tunnel cross section
• Ventilation and air quality
• Tunnel length
![Page 19: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/19.jpg)
Tunnel design improvements – ventilation and air quality
• Tunnel Air Quality Advisory Committee
• Effective ventilation and efficient energy usage
• Location of ventilation outlets
• Managed portal emissions
![Page 20: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/20.jpg)
Long tunnel considerations
• Long tunnels – M1 Pacific Motorway to M2 >8km with no intermediate
interchanges – WestConnex – tunnel travel of up to 13km with interchanges
• Driver experience – Safety – Lighting – Way finding – Geographical referencing – knowing where you are – Tunnel identity
![Page 21: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/21.jpg)
WestConnex: Industry Engagement Process
![Page 22: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/22.jpg)
Industry engagement The project team are engaging with industry (designers, constructors, operators, maintainers, tolling providers and financiers) on the wider WestConnex scheme during November and December 2013.
Key objectives
• Update industry on the current project status
• Obtain industry feedback on ways to enhance the project
• Identify and consider alternative options that offer improved
value for money
WestConnex 22
![Page 23: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/23.jpg)
Industry options
WestConnex 23
Workshops Written
Submissions
Alternative Proposals*
(Confidential with IP Protection)
Reference Scheme Feedback Project Proposals
*Alternative Proposals will be received and assessed by WDA in accordance with the NSW ‘Unsolicited Proposals Guide for Submission and Assessment’
![Page 24: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/24.jpg)
Industry engagement timeline
WestConnex 24
![Page 25: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/25.jpg)
Questions
WestConnex 25
![Page 26: Paul Goldsmith, West Connex Delivery Authority: Outlook for Sydney’s WestConnex](https://reader033.vdocument.in/reader033/viewer/2022051610/54998c2db47959a23f8b45b8/html5/thumbnails/26.jpg)
Summary
• State and Federal Government committed $3.3 billion of funding.
• WestConnex Delivery Authority (WDA) and Board established.
• WDA is inviting industry to:
– Provide feedback and alternative options on ways to enhance the project and offer improved value for money in both the delivery and financing of WestConnex
• For further information on WestConnex please visit:
www.westconnex.com.au
Email: [email protected]
Phone: 1300 660 248
WestConnex 26