MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION. WHERE WE ARE – WHERE WE ARE GOING. NOVEMBER 20, 2013. PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT. RSA IMPROVEMENTS, PMP & STANDARDS PROGRAM . PROGRAM YEAR 2013. 15R 33L EARTHWORK. - PowerPoint PPT Presentation

TRANSCRIPT

PowerPoint Presentation

PAUL L. SHANK P.E., C.M.CHIEF ENGINEER BWI MARSHALL AIRPORTMARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATIONWHERE WE ARE WHERE WE ARE GOINGNOVEMBER 20, 2013RSA IMPROVEMENTS, PMP & STANDARDS PROGRAM

PROGRAM YEAR 2013TASK CONTRACTVALUEMBE1Runway 15R-33L Standards Compliance Earthwork Project$21,800,00025%2Runway 15R Deicing Pad Pavement Rehab. And Stnds. Compliance$14,169,00030%3Low Maintenance Grassing Test Plots$133,00025%4General Aviation Pavement Rehabilitation$994,00020%5RSA Program Environmental Stream Restoration Project$2,079,00026%6Runway 15L-33R Runway Safety Area Improvements$4,960,00020%7Runway 15R-33L RSA, PMP and Standards Compliance Project$83,235,00020%8Runway 10-28 and 15R-33L Obstruction Clearing Project$413,0004% 9*Runway 15R-33L NAVAIDS Project$5,409,00013%*Graphic location same as Task 7

15R 33L EARTHWORKCONTRACT VALUE: $ 21,756,470Contract Completes Summer 2014MBE: 25%PROJECT OVERVIEW: Clearing and grubbing. Storm drain installation. Box culvert installation. Sanitary sewer and underground fire hydrant relocation. Mass earthwork, grading and retaining wall.

RUNWAY 15R DEICINGCONTRACT VALUE: $ 14,168,409Contract Completes November 2013MBE: 30%PROJECT OVERVIEW: Removal of existing pavement. Installation of new glycol drainage infrastructure, lighting, diversion vaults. New concrete pavement and pavement markings.

ENVIRONMENTAL STREAM RESTORATIONCONTRACT VALUE: $ 2,078,771Contract Completes July 2014MBE: 26%PROJECT OVERVIEW: Grading of stream channels and placement of fill.Construction of in-stream structures. Removal of invasive vegetation and plantings.

RUNWAY 15L 33R RSACONTRACT VALUE: $ 4,959,398Contract Completes Spring 2014MBE 14%PROJECT OVERVIEW: New vehicle service road and airfield equipment access road. Drainage pipe, box culvert and structure installation. Preparation of site and infrastructure for future relocation of existing NAVAIDS.

CONTRACT VALUE: $ 83,235,000 Proposed Schedule September 2013 to April 2015PROJECT OVERVIEW: Comprehensive Pavement Rehabilitation. Runway Safety Area Grading and Improvements. NAVAID Relocations and Infrastructure Improvements. Runway and Taxiway Lighting Improvements. Taxiway Realignments. Runway Incursion Prevention Elements. RUNWAY 15R 33L RSA

PROGRAM YEAR 2014-20152014-2015 PROGRAM ELEMENTS6Runway 10-28 Navaids & Runway 28 Displacement 15ANew T/W Uniform & T/W Uniform 1 And South Portion De-ice Pad15BRunway 4-22 Conversion To Taxiway Papa15CNew Taxiway Construction (EB-75)15DOld Taxiway Delta DemolitionPROGRAM VALUE 75-100M15D15B15C15A610

EXISTING TERMINAL - 2012 SECURITY CHECKPOINTS IN THE THROAT OF THE CONCOURSES RESTRICT EGRESS/ EVACUATION CAPACITY CORRIDOR WIDTH IN ORIGINAL PORTIONS OF CONCOURSES INADEQUATE 11LONG TERM TERMINAL PLAN UPPER LEVEL PLAN

NEW CHECKPOINTS BETWEEN CONCOURSESBEHIND SECURITY CONNECTORS ALLOW FOR LOAD BALANCING AND CONNECTING FLIGHTS12LONG TERM TERMINAL PLAN PHASING PLAN

CONCOURSE D ORIGINALLY FIRST BECAUSE DEFICIENCIES WERE GREATER DUE TO THE NUMBER OF GATESSERVED. SWA / AIRTRAN MERGER AND CONSOLIDATION ON CONCOURSES A/B/C SHIFTED PRIORITIES TO BC CONNECTORABCE13

CONCOURSE C WIDENINGB/C CONNECTORBC CONNECTOR PROGRAM TWO CONSTRUCTION PROJECTS 1314

BC CONNECTOR FINAL UPPER LEVEL PLAN 9 LANE CHECKPOINT BC CONNECTORCONTRACT VALUE: $ 43,937,000MBE: 20%PROJECT OVERVIEW: Secure passenger corridor connecting Concourse B and C. Nine (9) Lane Security Checkpoint. Observation Deck improvements. Concessions and Office Spaces.

BC CONNECTOR

NEW BC SECURITY CHECKPOINT

NEW BC CONNECTOR CONCOURSE C WIDENINGCONTRACT VALUE: $ 28,799,512Completion Date January 2013MBE: 31%PROJECT OVERVIEW: Renovate Concourse C to include larger passenger hold rooms and a wider corridor and exit. New passenger boarding bridges. New baggage handling system. New public restrooms. Modify mechanical & electrical systems.

DE CONNECTORCONTRACT VALUE: $ 75-100MProposed Design Schedule: September 2013- September 2014Proposed Construction Schedule: January 2015- November 2016

DE CONNECTORDE CONNECTOR ARRIVAL LEVEL PLAN

DE CONNECTOR DEPATURE LEVEL PLAN

NEW DE SECURITY CHECKPOINT

DE SECURITY CHECKPOINT VIEW FROM TERMINAL D

DE SECURITY CHECKPOINT VIEW FROM TERMINAL E

DE CONNECTOR

DE CONNECTOR VIDEO OF PROJECT OVERVIEW: BWI CONFORM.wmv*Program**Advertised ***BidsDue****Bid OpeningContract Number & TitleProposed DateProject ValueMAA-CO-13-020Parking Access and Revenue Control System (PARCS)***May 2013$8M-$11MMAA-CO-14-0012015 Airfield Capacity Enhancement Project**April 2014$80MMAA-CO-14-005International Building Expansion**December 2013$7MMAA-CO-14-007Comprehensive Interior/Exterior Modification 2014**November 2013$25MMAA-CO-14-008Long Term Parking Lot B Pavement Rehabilitation**November 2013$1.7MMAA-CO-14-009Pedestrian Walkway from CRCF to the East Tenant Lot*October 2013$.5MMAA-CO-14-010Public Parking Area Pavement Rehabilitation**November 2013$1MMAA-CO-14-011Central Terminal Third Floor Elevator Upgrades**November 2013$.5MMAA-CO-14-012Air Cargo Drive Pavement Rehabilitation*February 2014$1.7M