pbf full tiled a4 change a

Upload: ramonfenol

Post on 03-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 PbF Full Tiled A4 Change A

    1/12

    RUDDER

    GR

    CENTER OFGRAVITY

  • 7/28/2019 PbF Full Tiled A4 Change A

    2/12

    GRAY DASHED LINE REPRESENTS 18" X 36" SHEET OF EPP

    KF STEP PANEL

  • 7/28/2019 PbF Full Tiled A4 Change A

    3/12

    Designed by Leadfeather on RCGroups.com

    CAD by Dz1sfb on RCGroups.com

    29-MAY-2009 - Change A - Added flat to fuselagto accept optional horizontal stabilizer.

    For Private Use OnlyCommercial Rights Reserved

    1 sheet 18 x 36 1.3# 6mm epp foam.1/16" (1.5mm) carbon rod for control rods.1/8" x 14" carbon tube for leading edge/prop protector1/32 music wire for control rod ends and wire hoop skids.Hot glue

    Welders glue3M Spray 77Paint

    Hardware Required:

    24 gram motor: Blue Wonder motor - 1500kvMotor mountProp: GWS 8x4 HDProp saver

    ESCServos: 3 - 5 gram servoRecieverControl horns 3 piecesEZ connectors 3 piecesBattery: 2s 360 battery

    Wingspan: 18"Length: 18"AUW with a 2s 360 battery is 189 grams or about

  • 7/28/2019 PbF Full Tiled A4 Change A

    4/12

    elage

    bout 6.7 oz.

  • 7/28/2019 PbF Full Tiled A4 Change A

    5/12

    FU

    S ELA

    GE

    IN

    NE

    R

    INNER

    LA

    NDING

    SKID

  • 7/28/2019 PbF Full Tiled A4 Change A

    6/12

    OUTE

    RLANDINGS

    KIDO U

    TER

    LAND

    ING

    S K

    ID

    7 H k l t i h k ti t

  • 7/28/2019 PbF Full Tiled A4 Change A

    7/12

    WING ANFUSELAGE ALIGNMENT GUIDESTRANSFER TO TOP OF PANEL

    PLASTIC TUBES GLUED TO INSIDE CORNEROF SKID ASSEMBLIES. RC CAR ANTENNAGUIDE CAN BE USED FOR TUBING.ALSO 1/8" NYLON TUBING IS SUITABLE

    7. Hook up electrics, check operation, center servos8. Install electrics9. Install control rods and horns10. Install leading edge tube11. Install wire hoop landing gear

    For the maiden flight:Check cg and control movementsI use +/- 45 degrees and 75% expo on all surfaces to startElevons should be slightly up; 1/16" or 1/8", rudder straightLaunch nose high, about 45 degrees and 1/3 throttle. It should float away and climb slowly.

    Trim cg and controls as required.

    And don't forget the most important thing - Have fun!

    Parts list

    1 sheet 18 x 36 1.3# 6mm epp foam."

    Specifications:

    Wingspan: 18""

    CENTER OF GRAVITY4.00in

    WIRE WAS USED FOR

  • 7/28/2019 PbF Full Tiled A4 Change A

    8/12

    ND ELEVON PANEL

    ERA

    WIRE WAS USED FORTHIS ON THE PROTOTYPE.

  • 7/28/2019 PbF Full Tiled A4 Change A

    9/12

    LAN

    DING

    S

    KID

  • 7/28/2019 PbF Full Tiled A4 Change A

    10/12

    SHOWN WITH OPTIONAL HORIZONTAL STABILIZER

  • 7/28/2019 PbF Full Tiled A4 Change A

    11/12

    DETAIL VIEW OF SKID ASSEMBLY

    Here is a guide to building the PbF.

    1.Cut all foam pieces2. Hinge all control surfaces3. Laminate lower KF piece

    4. Optional: do your cool paint job now5. Install fuselage6. Install foam skid assemblies7. Hook up electrics, check operation, center servos8. Install electrics

    LANDING GEAR IS .032" MUSIC WIRE 9-3/4" LONG - 2 PIFLEX BOTH ENDS OF WIRE AND INSERT INTO TUBES.SPRING TENSION HOLDS WIRE IN PLACE.

  • 7/28/2019 PbF Full Tiled A4 Change A

    12/12

    2 PIECES REQ.S.

    THERE IS A 1/4" LONG PLUGIN THE END OF THE LANDINGGEAR TUBES TO ACT ASWIRE STOPS. A PIECE OFWIRE WAS USED FORTHIS ON THE PROTOTYPE.

    NOTE: PLUGS REQUIRED