    THE NAVIGATION APPLICATIONS &THE NAVIGATION APPLICATIONS &NAVAID INFRASTRUCTURE STRATEGYNAVAID INFRASTRUCTURE STRATEGY

    FOR THE ECAC AREAFOR THE ECAC AREA

    ICAO PBN Task ForceICAO PBN Task Force

  • 8/2/2019 PBN Task Force

    2/23

    2

    NAVIGATIONNAVIGATIONSTRATEGY FORSTRATEGY FOR

    ECAC AREAECAC AREA ICAOSPBN

    CONCEPT

    ECTLECTL

    ENVIRON.ENVIRON.

    POLICY &POLICY &

    STRATEGYSTRATEGY

    EVOLVINGEVOLVING

    TRADETRADE--OFFSOFFS

    NEWNEWAIRCRAFT OPRAIRCRAFT OPR

    A380/B787A380/B787

    VLJ/UASVLJ/UAS

    GNSSGNSS

    POLICYPOLICY

    A Changing ContextA Changing Context

    2015ECAC

    AIRSPACE

    CONCEPT

    2020+

    SESARSESARCONOPSCONOPS

    ICAOGLOBAL

    ATMCONCEPT

    2015ECAC

    AIRSPACE

    CONCEPT

    2020+

    SESARSESARCONOPSCONOPS

  • 8/2/2019 PBN Task Force

    3/23

    3

    NAV Developments: A 2-Phase Approach

    En-Route and TMA

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 202x

    Too large a step in functionalityToo large a step in functionality

    Too long a delay to benefit from latest capabilityToo long a delay to benefit from latest capability

    Today 2020+SESARSESAR

    CONOPSCONOPS

    2015ECAC

    AIRSPACE

    CONCEPT

  • 8/2/2019 PBN Task Force

    4/23

    4

    En-Route and TMA

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 202x

    NowB-RNAV Mandatory en-route

    Above defined FLP-RNAVfor TMA RNAV

    SESARBusiness

    Trajectories4D NAV

    Too large a step in functionalityToo large a step in functionality

    Too long a delay to benefit from latest capabilityToo long a delay to benefit from latest capability

    2015 ECAC2015 ECAC

    Airspace ConceptAirspace Concept

    and Strategyand StrategyVNAVVNAV

    RTARTARF/FRT etcRF/FRT etc

    NAV Developments: A 2-Phase Approach

  • 8/2/2019 PBN Task Force

    5/23

    5

    ECAC RNAV Applications

    B-RNAV

    Initial application En-route nominally

    above FL95

    Not suitable for TMA 5NM 95%

    Identical to RNAV 5

    P-RNAV

    1NM 95% Support Terminal

    Operations

    Basis of RNAV 1 Some differences

    related to DME/Inertialapplication

  • 8/2/2019 PBN Task Force

    6/23

    6

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    4 Strategic4 StrategicStreamsStreams

    2

    008

    2

    02

    0

  • 8/2/2019 PBN Task Force

    7/23

    7

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    4 Strategic4 StrategicStreamsStreams

    2

    008

    2

    02

    0

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

  • 8/2/2019 PBN Task Force

    8/23

    8

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    U

    S

    E

    R

    P

    R

    E

    F

    E

    R

    R

    E

    D

    T

    R

    A

    J

    EC

    T

    O

    R

    I

    E

    S

    IMP OR VEDACCESS/SAFETY

    IMPROVEDLO

    RWVSI OPE .

    Phased improvement of Nav capability towards 4D contract

    PhasedimprovementofNavcapabilitytowards4Dcontract

    IncreaseVerticalGuida

    nceonAPCH/Eliminate

    NPAs

    Enablingnewtechnologytoimpro

    veLowVisOPR

    Rationalise Ground-Based Navaids

    Increasing use of GNSS

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

  • 8/2/2019 PBN Task Force

    9/23

    9

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    2

    008

    2

    02

    0

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

    AA--RNP 1 Spec.RNP 1 Spec.

    RFRF IIIIRoutesRoutes FRTFRT IIIIRoutesRoutes

    IIIIOffsetOffset

    RTARTA

    3D3D ManagemManagem..

    RNAV HoldingRNAV Holding

    20152015

    20152015

  • 8/2/2019 PBN Task Force

    10/23

    10

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    2

    008

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

    4D4D Bus.Bus.TrajectTraject..

    202x202x

    202x202x

  • 8/2/2019 PBN Task Force

    11/23

    11

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    2

    008

    2

    02

    0

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

    End ofEnd of Dive &Dive &

    DriveDrive removeremove

    NPANPAss

  • 8/2/2019 PBN Task Force

    12/23

    12

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    2

    008

    202

    0

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

    ImprovedImproved

    AccessAccess

    More LandingMore Landing

    SystemsSystems

  • 8/2/2019 PBN Task Force

    13/23

    13

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    2

    008

    202

    0

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

    DecommissionDecommission

    NDBs .. VORsNDBs .. VORs

    Over timeOver time..

  • 8/2/2019 PBN Task Force

    14/23

    14

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY

    2

    008

    202

    0

    EN ROUTE

    TERMINAL

    APPROACH &

    LANDING

    NAVAID

    INFRASTRUCT.

    IncreasingIncreasing

    Reliance onReliance on

    GNSS / withGNSS / withGalileoGalileo

  • 8/2/2019 PBN Task Force

    15/23

    15

    THE NAVIGATION APPLICATION &

    NAVAID INFRASTRUCTURE STRATEGY2008 2010 2012 2014

    2013 2015 2020

    EN ROUTE

    TERMINAL

    (ARR & DEP)

    APPROACH,

    &

    LANDING

    P-RNAV

    A-RNP1

    P-RNAV

    RNP

    APCH1LPV 200

    (SBAS)

    Cat IIIILS

    Cat I GLS(GBAS/ GPS)

    Cat III GLS(GBAS/ GPS)

    Ca t III GLS

    (Multiconstellation)

    4DA-RNP1

    Increa sing use: Spac e-b ased Nava ids

    LPV

    (SBAS)

    1a2

    2

    3

    3

    4

    5 8

    9

    A

    Cat IIIMLS

    Rationa lisation: Ground -b ased Navaids

    EVOLUTION

    OF NAVAI D

    INFRASTRUCT.

    B CD

    7

    11 12

    E

    Loc alizer Perf.

    with Vert. Guidance

    ILS

    Sustainme nt

    1

    RNP ARAPCH 13

    GBAS EGNOSGALILEO

    1c

    1e

    1b

    U

    S

    E

    R

    P

    R

    E

    F

    E

    R

    R

    E

    D

    TR

    A

    J

    E

    C

    T

    O

    R

    I

    ES

    1f

    GPS L5

    1d

    2009 2011

    6

    10

    4D

    IMPOR VED

    ACCESS/SAFETY

    IMPROVEDLO

    RWVSI OPE .

  • 8/2/2019 PBN Task Force

    16/23

    16

    Nav Application Evolution

    P-RNAV

    B-RNAV

    Advanced RNP

    2005 2010 2015 2020

    E

    NROUTE

    P-RNAV

    B-RNAV

    Advanced RNP

    CONVENTIONAL

    RNP APCHc

    LPV (APV I)

    NPA: CONV.RNAV (LNAV)

    LPV 200APPROACH

    GBAS Cat IIIa

    GBAS Cat IIIb

    ILS/MLS (All Cat)GBAS Cat I

    awith GPS

    bwith GalileoT

    /O

    &

    LANDIN

    G

    TERMINAL

    c

  • 8/2/2019 PBN Task Force

    17/23

    17

    Implementation DriversImplementation Drivers

    Safety

    Capacity

    Efficiency

    Environmental

  • 8/2/2019 PBN Task Force

    18/23

    18

    BB--RNAVRNAV

    Enables ARN route structure changes

    Removed bottlenecks

    Reduced track miles

    Enables additional routes

    Did not use RNP terminology pre-PBN

    Identified that functionality more important than accuracy

    Terminology ICAO EUR Doc 003

    First step

    Implemented 1998

    En-route only

    Expected to be replaced by future requirements

  • 8/2/2019 PBN Task Force

    19/23

    19

    PP--RNAVRNAV

    Provides link from en-route structure to airports

    Needed urgently as BRNAV not suitable Increase procedure flexibility

    But

    P-RNAV certification slow

    Forced many states to find alternatives (BRNAV+ etc)

    Harmonisation was protracted

    PRNAV applications will extend: Accuracy requirement in line with present capabilty

    Probably employed en-route as well as TMA

    But A-RNP 1 could start to replace in 2017 timescale

  • 8/2/2019 PBN Task Force

    20/23

    20

    Advanced RNPAdvanced RNP--11

    Placeholder in PBN Manual

    Consultation on functionality starting - PBNSG Provide capabilty for

    closely spaced routes

    Holding

    Vertical

    Possibly Initial timing control- RTA

    Aim at capabilty available in the most advanced

    systems today Needed to provide performance needed for dense

    continental airspace

    Benefits analysis underway

  • 8/2/2019 PBN Task Force

    21/23

    21

    Next StepsNext Steps EnEn--Route and TMARoute and TMA

    A-RNP-1 needs strong business case

    Route Network Development identified need for2017 period closely spaced routes

    Airspace Strategy identified need for a step towardsSESAR in 2017 period

    Timescales

    For 2017 implementation need 2010 agreement

    EASA AMC development timescale 2011 earliest?

    Placeholder in PBN Manual

  • 8/2/2019 PBN Task Force

    22/23

    22

    APVAPV

    SBAS APV and APV Baro VNAV both being enabled

    Safety

    Improved access

    Replace Dive and Drive procedures

    Seeking to support Service providers to implement

    Wide variation in airport requirements

    Customer base

    Prevailing met conditions

    Unlikely to be able to produce ECAC wide businesscase

    Support individual business cases

  • 8/2/2019 PBN Task Force

    23/23

    23

    DiscussionDiscussion

    PBN Implementation

    Concentrate initially on APV

    Maintain B-RNAV/P-RNAV

    Avoid any confusion by changing target

    avoid interruption of progress on P-RNAV

    Support development of A-RNP 1

    Longer term ATM potential

    Move to A-RNP in 2017 period