pcab lic 2014

2
W m  . il; 'E  tlt tlt BIr ' Republic of the Philippines Eepartmentof Trade and lndustry coNSTRUCTTON tNDqSTRy AUTI.|ORtTy OF TFtE pHl[-tpF8F,ES P H I L I P P I N E CONTRACTORS ACCRE D ITATION BO,A.RD Makati City, Metro Manila GONTR.AETOR'S LlGENSE This certifies thai ATR CONSTRI/CTION having complied with all the requirements for licensure in accordance with Republic. Act 1No.4566, as amended, and its implementing rules and regulations, is hFreby authorized to engage in the construction contracting business in the Philippines, sub.iect to limitations of license validiiy period, classification and category as 2rescribed under Licer.r-Se Particulars in the fox to the righi hereof and to the terms and conditions annotated at the back hereof. This further certifies that said licensee, sub.iect to thp limitations of the above-prescribed Iicense validity period and registration validity period, kind/s of project ancl size range/s as indicatet' under Registration PartiLulars in the box to the right hereof, is a PCAB registered contractor for government projects. I Gi'Uen at Metrc lVlanila, Philippines, on OcJober 16,2013 - eoh,trRAeroR,s padfieup-yr.ms Authorized Managing Officer (name and signature Margarita Villafane Remollo Taxpayer ldentification Number (TlN) 414-389-418 Registration Date and Number June 01,2012 Validity Perioq of this Registration October 16, 2013 to June 30. 201 5 2012-0648, Medium A Medium A Small B Meile, Head Ofiice Locaiic, (-,,r{-l REGION/II LICEI{SE PARTIELI{.ARS License First lssue Date and Number June 01, 2012 Validity Period of this License/Renewal July 01, 2013 June 30,2014 Other Classifi€tion/s General Building oooooooo@oooooooo I REG ISTRATIO N PARTIE [J L#\RS Kinds of Project and Respective Sizb Ranges Road, Highway pavement, Railways Airport horizontal structurcs and Bridgcs 'l3yl#^ ;m; -.lii;l'"' Note: Upgrading-f Size Range Approved on 1 6 Oito6er 201 3 FCIRMil {jj,- 06337 i Irigation and Flood Control  ?ater Supply Building and Industial Plant Small B ffiffiffi#+ Above Projcct Kinds and Size Ranges arc based on Board Resolution No.001, s.2004 I IMPORTANT NOTICE: Filing schedule for licensc renewal application - April 2014 - "i' I

Upload: christianharveywong

Post on 01-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pcab Lic 2014

7/25/2019 Pcab Lic 2014

http://slidepdf.com/reader/full/pcab-lic-2014 1/1

W

m

 . il;

'E

 

tlt

tlt

BIr

'

Republic

of

the Philippines

Eepartmentof

Trade

and

lndustry

coNSTRUCTTON

tNDqSTRy

AUTI.|ORtTy OF

TFtE

pHl[-tpF8F,ES

P

H

I

L

I P

P

I

N E

CONTRACTORS

ACCRE D ITATION

BO,A.RD

Makati

City, Metro Manila

GONTR.AETOR'S

LlGENSE

This

certifies

thai

ATR CONSTRI/CTION

having

complied

with

all the

requirements for

licensure

in

accordance

with Republic. Act

1No.4566,

as

amended, and

its

implementing

rules

and

regulations, is

hFreby authorized

to

engage

in the

construction contracting

business

in

the

Philippines,

sub.iect to

limitations of license validiiy

period,

classification

and

category as

2rescribed

under

Licer.r-Se

Particulars

in

the

fox to the

righi

hereof

and to the

terms

and conditions

annotated at the back hereof.

This further certifies that

said licensee, sub.iect to

thp

limitations of

the

above-prescribed

Iicense

validity

period

and registration validity

period,

kind/s

of

project

ancl size

range/s

as

indicatet'

under

Registration PartiLulars in

the box to the

right hereof,

is

a PCAB

registered

contractor

for

government projects.

I

Gi'Uen at Metrc lVlanila,

Philippines,

on

OcJober

16,2013

-

eoh,trRAeroR,s

padfieup-yr.ms

Authorized

Managing Officer (name

and signature

Margarita

Villafane

Remollo

Taxpayer

ldentification Number

(TlN)

414-389-418

Registration Date and Number

June

01,2012

Validity

Perioq

of this Registration

October

16,

2013

to

June 30.

201

5

2012-0648,

Medium

A

Medium A

Small

B

Meile,

Head

Ofiice

Locaiic,

(-,,r{-l

REGION/II

LICEI{SE PARTIELI{.ARS

License

First

lssue

Date and

Number

June

01, 2012

Validity Period

of

this License/Renewal

July 01,

2013

June 30,2014

Other

Classifi€tion/s

General

Building

oooooooo@oooooooo

I

REG

ISTRATIO

N

PARTIE

[J

L#\RS

Kinds of Project

and Respective

Sizb Ranges

Road,

Highway

pavement,

Railways

Airport

horizontal

structurcs and Bridgcs

'l3yl#^

;m;

-.lii;l'"'

Note:

Upgrading-f Size Range

Approved on

1

6 Oito6er 201 3

FCIRMil

{jj,-

06337

i

Irigation

and

Flood Control

 ?ater Supply

Building

and

Industial Plant

Small B

ffiffiffi#+

Above

Projcct Kinds

and

Size

Ranges

arc based on Board Resolution

No.001,

s.2004

I

IMPORTANT

NOTICE: Filing

schedule for

licensc renewal application

-

April

2014

-

"i'

I