Page 1: PCS7 Project Adaption AdvES

Applications & Tools

Answers for industry.

Adaption of existing PCS 7 Projects for the Use of Advanced ES SIMATIC PCS 7

Application Description November 2013

Page 2: PCS7 Project Adaption AdvES

Warranty and Liability

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 2

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Warranty and Liability

Note The Application Examples are not binding and do not claim to be complete regarding the circuits shown, equipping and any eventuality. The Application Examples do not represent customer-specific solutions. They are only intended to provide support for typical applications. You are responsible for ensuring that the described products are used correctly. These Application Examples do not relieve you of the responsibility to use sound practices in application, installation, operation and maintenance. When using these Application Examples, you recognize that we cannot be made liable for any damage/claims beyond the liability clause described. We reserve the right to make changes to these Application Examples at any time without prior notice. If there are any deviations between the recommendations provided in these Application Examples and other Siemens publications – e.g. Catalogs – the contents of the other documents have priority.

We do not accept any liability for the information contained in this document. Any claims against us – based on whatever legal reason – resulting from the use of the examples, information, programs, engineering and performance data etc., described in this Application Example shall be excluded. Such an exclusion shall not apply in the case of mandatory liability, e.g. under the German Product Liability Act (“Produkthaftungsgesetz”), in case of intent, gross negligence, or injury of life, body or health, guarantee for the quality of a product, fraudulent concealment of a deficiency or breach of a condition which goes to the root of the contract (“wesentliche Vertragspflichten”). The damages for a breach of a substantial contractual obligation are, however, limited to the foreseeable damage, typical for the type of contract, except in the event of intent or gross negligence or injury to life, body or health. The above provisions do not imply a change of the burden of proof to your detriment. Any form of duplication or distribution of these Application Examples or excerpts hereof is prohibited without the expressed consent of Siemens Industry Sector.

Caution The functions and solutions described in this entry predominantly confine themselves to the realization of the automation task. Please also take into account that corresponding protective measures have to be taken in the context of Industrial Security when connecting your equipment to other parts of the plant, the enterprise network or the Internet. For more information, please refer to Entry ID 50203404. http://support.automation.siemens.com/WW/view/en/50203404

Siemens Industry Online Support This entry is taken from the Siemens Industry Online Support. The following link takes you directly to the download page of this document: http://support.automation.siemens.com/WW/view/en/82949027

Page 3: PCS7 Project Adaption AdvES

Table of Contents

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 3

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Table of Contents Warranty and Liability ................................................................................................. 2

1 Preface ................................................................................................................ 4 2 Task ..................................................................................................................... 5

3 Solution and Implementation ........................................................................... 6

3.1 Saving PCS 7 project data ................................................................... 7 3.2 Updating/preparing PCS 7 project data ............................................. 13 3.2.1 Procedure: CFCs created directly in the project without using a

master data library .............................................................................. 13 3.2.2 Procedure: CFCs created directly in the project but no master

data library available in the project ..................................................... 17 3.2.3 Procedure: PTs created out of conventional PTTs, master data

library used ......................................................................................... 24 3.2.4 Procedure: CMs created out of CMTs, master data library used ....... 26 3.3 Processing in AdvES .......................................................................... 27 3.4 Project postprocessing in PCS 7 ........................................................ 34 3.4.1 New project in the multiproject ........................................................... 34 3.4.2 Old project in the multiproject ............................................................. 36

4 Conclusion ....................................................................................................... 38

5 Further Links .................................................................................................... 38 6 History............................................................................................................... 40

Page 4: PCS7 Project Adaption AdvES

1 Preface

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 4

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

1 Preface Objective of the application

This document describes how to adapt an already existing SIMATIC PCS 7 project in order to apply the new PCS 7 type concept (with control module types and control modules) and PCS 7 Advanced ES (AdvES).

Note From version V8.0 on, SIMATIC PCS 7 provides a new type concept which - in combination with AdvES - enables improved mass engineering on the one hand and allows changes to already instantiated control module types on the other hand.

For details on the new type concept, please refer to the "SIMATIC Process Control System PCS 7 CFC for SIMATIC S7 (V8.0)" function manual, chapter "Handling of control module types".

Please find the link to the manual in chapter 5. "Further Links".

Validity Valid for SIMATIC PCS 7 V8.0 or higher (incl. option package PCS 7 Advanced Engineering System V8.0 or higher)

Abbreviations Table 1-1: Abbreviations

Abbreviation Description

CMT Control module type (new type model) CM Control module (instance of a CMT) PTT Process tag type (old type model) PT Process tag (instance of a PTT) CFC Continuous function chart

Page 5: PCS7 Project Adaption AdvES

2 Task

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 5

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

2 Task You want to adapt your SIMATIC PCS 7 project in such a way that you can apply the new type concept in combination with AdvES. The reasons for that could be the following: • You want to apply the new type concept to your SIMATIC PCS 7 project and

use the AdvES functionalities. • You want to use an existing SIMATIC PCS 7 project either completely or at

least in parts in a new PCS 7 project. • You want to make changes (for example, adapt parameter values) and

possibly expansions in a new SIMATIC PCS 7 project in an efficient manner. (For example, if the changes or expansions are already available in Excel files, these data can be transferred using AdvES.)

Note In the application "Performance Mass Data Engineering with PCS 7 Advanced ES on a Practical Example", section 2.2 specifies further advantages of the new type concept in combination with AdvES.

http://support.automation.siemens.com/WW/view/en/61627479

Page 6: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 6

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3 Solution and Implementation This chapter demonstrates the steps that have to be taken in principle to prepare your PCS 7 project for the use of AdvES and to convert to the new type concept. The procedure for that can be divided into four process steps. Figure 3-1: Workflow

This process provides the following advantages: • The hardware configuration and interconnection of the driver blocks with the

I/O modules do not get lost during the conversion. • Cross-process tag interconnections of the existing project are copied and do

not need to be reconfigured.

To which extent the individual steps have to be processed depends on whether you want to continue to use the existing project and how the existing process tags were created in the project (see section 3.2.)

Page 7: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 7

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.1 Saving PCS 7 project data

This section describes how to save your PCS 7 project data before converting your PCS 7 project into the new type concept.

Procedure Regardless of how you created your PCS 7 project (for example, with CFCs and thus without a master data library, with process tag types or control module types in a master data library), you have to save your project data first. 1. For this purpose, open your PCS 7 project in SIMATIC Manager. 2. Open the Process Object View. 3. Select your subproject and right-click to open the context menu. Click on:

"Process Objects > Select I/Os...". Figure 3-2: SIMATIC PCS 7 Process Object View

The "Filter: Select I/Os" dialog opens. Confirm the dialog by clicking on the "OK" button.

Page 8: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 8

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Figure 3-3: "Filter: Select I/Os" dialog

4. If not yet done in the source project: Check all check boxes in the "Parameters" column for the parameters with cross-process tag interconnections. Figure 3-4: Selecting parameter flags

Page 9: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 9

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Note In larger projects, this may affect a great deal of parameters. To save time and filter by the interconnected parameters only and save these, proceed as follows:

1. Select the subproject in the Process Object View, right-click to open the context menu and click on the command: "Process Objects > Export All I/Os...".

2. Save the CSV file. The Excel file created out of that contains all interconnections, even the interconnections between inputs/outputs without a parameter flag.

3. Filter the interconnections in column H (without blanks), for example: 4. Compare the entries in column B (Chart) with those in column H

(Interconnection): The interconnection starts with the name of the target/source chart. If the name differs from that in column B (same row), it is a cross-process tag interconnection. Via columns B and D you can determine the I/O in the chart.

You can use the following formula to evaluate larger amounts of data: Excel command: German: =ISTFEHL(WENN(H2<>"";FINDEN(B2;LINKS(H2;FINDEN("\";H2;1)-1);1);"no_conn")) Excel command: English: =ISERR(IF(H4<>"";FIND(B4;LEFT(H4;FIND("\";H4;1)-1);1);"no_conn")) This formula gives the result "TRUE" if it is a cross-process tag interconnection. Enter this formula in each cell of a blank column and then filter by "TRUE". This provides an overview of all cross-process tag interconnections and you can save these.

Page 10: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 10

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

5. Select the subproject in the Process Object View, right-click to open the context menu and click on the command: "Process Objects > Export I/Os...". Figure 3-5: SIMATIC PCS 7 Process Object View

6. Save the parameters and assign a unique name to the CSV file. You will need this file later to reimport the information (see section 3.4).

Figure 3-6: Saving the export file

Note Since you set all parameter flags, all the information about interconnections and parameter values is saved.

Page 11: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 11

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

7. Open the "General" tab in the Process Object View. In this view, all CFCs contained in the project are displayed.

8. Select the subproject in the Process Object View and right-click to open the context menu. Click on the command: "Process Objects > Export Current View...".

Figure 3-7: SIMATIC PCS 7 Process Object View

9. Save the general project data (CSV file).

Figure 3-8: Saving the export file

10. Open this CSV file with Microsoft Office Excel and save the file under a unique

name in Excel format. You will need this Excel list later to reimport the data in AdvES (see section 3.3).

Page 12: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.1 Saving PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 12

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

11. Open the "Signals" tab in the Process Object View. In this view, all signals and their associated HW information are displayed.

12. Select the subproject in the Process Object View and right-click to open the context menu. Click on the command: "Export Current View...".

13. Save the signal data (CSV file). 14. Open this CSV file with Excel and save the file under a unique name in Excel

format. You will need this Excel list later to reimport the data in AdvES (see section 3.3).

15. Open the "Blocks" tab in the Process Object View. In this view, all blocks and their associated information (for example, block icon) are displayed.

16. Select the subproject and right-click to open the context menu. Click on the command: "Export Current View...".

17. Save the block data (CSV file). 18. Open this CSV file with Excel and save the file under a unique name in Excel

format. You will need this Excel list later to reimport the data in AdvES (see section 3.3).

Note This procedure serves for saving the project data of the "old" project in order to transfer them to AdvES later using the Excel list import.

Example: Creating Excel lists

Figure 3-9: Creating Excel lists

csv file

Excel file created out of the csv file

Page 13: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 13

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.2 Updating/preparing PCS 7 project data

This section describes how to adapt/prepare your SIMATIC PCS 7 project in order to optimally use AdvES in combination with the new type concept. The procedure for that depends on whether in the project: • you created the CFCs directly without using a master data library (see

section 3.2.1). • you created the CFCs directly and no master data library is available (see

section 3.2.2). • you created the process tags (PT) out of conventional process tag types (PTT)

in the master data library (see section 3.2.3). • you created the control modules (CM) out of control module types (CMT) in the

master data library (see section 3.2.4).

3.2.1 Procedure: CFCs created directly in the project without using a master data library

Your project includes a master data library. However, you did not use it and created the CFCs directly (without a process tag type). Proceed as follows: 1. If you have several CFCs with exactly the same structure in your project (for

example, for a valve or motor), copy the relevant CFC that is to serve as a template (CMT) to the master data library.

NOTICE If your project includes CFCs that occur only once and are additionally interconnected with various I/Os or other CFCs, these must also be converted into CMTs. If this is not done, this interconnection information will get lost.

Figure 3-10: Converting CFCs into CMTs

Page 14: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 14

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

2. Convert the CFCs in the master data library into CMTs. For this purpose, open a CFC and create a new object for a control module in the plant I/Os. For this, you have to open the context menu by right-clicking in the white field of the plant I/Os and then click on the command: "Insert new object > Control module". Figure 3-11: Converting CFC into CMT

The CFC has now automatically been converted into a CMT.

3. Now click on the "F5" button to refresh the chart. The blocks in the chart are colored in green.

Note This procedure is only possible for converting CFCs into CMTs. If your project includes process tag types, you have to proceed as described in section 3.2.3.

4. Make an assignment for the name of the control module type.

For this purpose, right-click in the field of the "Assignment" column and the "Name" row. The "Add chart ..." button is displayed. Click on the "Add chart ..." button to assign a chart to the name.

Page 15: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 15

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Figure 3-12: Assigning the name of the control module

NOTICE If this assignment is not made, as a consequence the instances will not be created correctly when the chart names are generated.

5. Now define the plant I/Os of the CMT.

Note The basic functional principles of that are not described explicitly in this section.

The functional principles and configuration of CMTs are described in great detail and well-illustrated in the following document.

Application Example: "Performance Mass Data Engineering with PCS 7 Advanced ES on a Practical Example"

http://support.automation.siemens.com/WW/view/en/61627479

6. Check in the plant I/Os whether the sampling time of the CMT is correct.

Figure 3-13: Plant I/Os

Page 16: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 16

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Figure 3-14: Created CMT

Page 17: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 17

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.2.2 Procedure: CFCs created directly in the project but no master data library available in the project

If there is no master data library available yet in the project, proceed as follows: 1. Create a master data library if there is none available yet.

For this purpose, select your PCS 7 multiproject and right-click to open the context menu. Click on the command: "Multiproject > Create in Multiproject...". Figure 3-15: Creating a library in the project

The "New Project" dialog opens. 2. In this "New Project" dialog, open the "Libraries" tab.

Assign an appropriate name. 3. Then click on the "OK" button.

Figure 3-16: "New Project" dialog

1.

2.

3.

Page 18: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 18

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

4. Select the created library and right-click to open the context menu. Click on the command: "Multiproject > Define as Master Data Library". Figure 3-17: Defining a library as master data library

5. Open the Component View of your project. 6. Select the master data library and right-click to open the context menu.

Click on the command: "Insert New Object > S7 Program".

Figure 3-18: Inserting an S7 program

Page 19: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 19

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

7. Select the created "S7 Program" folder and right-click to open the context menu. Click on the command "Insert New Object > Chart folder" to create the "Charts" folder.

Figure 3-19: Creating a chart folder

8. Open the Plant View of your project and create the shared declarations in the

master data library. For this purpose, select the master data library and right-click to open the context menu. Click on the command: "Insert New Object > Shared Declarations".

9. Open the Plant View of your project and create a folder in the master data library. For this purpose, select the master data library and right-click to open the context menu. Click on the command: "Insert New Object > Hierarchy Folder".

Page 20: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 20

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Figure 3-20: Creating a hierarchy folder in the master data library

10. Assign an appropriate name to the folder. 11. If you have several CFCs with exactly the same structure in your project (for

example, for a valve or motor), copy the relevant CFC that is later to serve as a template (CMT) to the folder you created in the master data library. Figure 3-21: Copying CFCs to the master data library

NOTICE If your project includes CFCs that occur only once and are interconnected with various I/Os or other CFCs, these must also be converted into CMTs. If this is not done, this interconnection information will get lost.

Page 21: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 21

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

12. Convert the CFCs in the master data library into CMTs. For this purpose, open the CFCs and create a new object for a control module in the plant I/Os. For this, open the context menu by right-clicking in the white field of the plant I/Os and then click on the command: "Insert new object > Control module". Figure 3-22: Converting CFC into CMT

The CFC has now automatically been converted into a CMT.

13. Now click on the "F5" button to refresh the chart. The blocks in the chart are colored in green.

Note This procedure is only possible for converting CFCs into CMTs. If your project includes process tag types, you have to proceed as described in section 3.2.3.

14. Make an assignment for the name of the control module type.

For this purpose, right-click in the field of the "Assignment" column and the "Name" row. The "Add chart ..." button is displayed. Click on the "Add chart ..." button to assign a chart to the name.

Page 22: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 22

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Figure 3-23: Assigning the name of the control module

NOTICE If this assignment is not made, as a consequence the instances will not be created correctly when the chart names are generated.

15. Now define the plant I/Os of the CMT.

Note The basic functional principles of that are not described explicitly in this section.

The functional principles and configuration of CMTs are described in great detail and well illustrated in the following document.

Application Example: "Performance Mass Data Engineering with PCS 7 Advanced ES on a Practical Example"

http://support.automation.siemens.com/WW/view/en/61627479

16. Check in the plant I/Os whether the sampling time of the CMT is correct.

Figure 3-24: Plant I/Os

Page 23: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 23

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

17. Close the CFC editor. In the Plant View of your project, the "Process tag types" folder has been created in the master data library. Figure 3-25: Created "Process tag types" folder

18. Copy the CMT and the remaining CFCs to the "Process tag types" folder and

delete the folder you created before in the master data library.

Figure 3-26: Created CMT

19. Convert all other CFCs into CMTs in the same way.

The standard functions are created automatically when the CMTs are created. These are only relevant to COMOS and immaterial for AdvES. The standard functions cannot be deleted.

Page 24: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 24

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.2.3 Procedure: PTs created out of conventional PTTs, master data library used

1. Convert the process tag types in the master data library in the "Process tag types" folder into control module types. Select the "Process tag types" folder in the master data library of your multiproject and open the context menu. In the context menu, select "Control modules > Create control module type from process tag type ...".

NOTICE In automatic conversion, structured control tags might be created that cannot be controlled by AdvES.

These must be corrected manually.

Figure 3-27: Converting process tag types into CMTs

A selection dialog opens. Select all process tag types and click on the "Create..." button. Figure 3-28: Selection dialog for the conversion of process tag types into CMTs

The CMT is now created in the master data library.

Page 25: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 25

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

2. After conversion, the process tag types are kept and the control module type is automatically assigned a name extension. Example: Example_Motor (PTT) and Example_Motor(1) (CMT) Figure 3-29: Created CMTs

3. Delete the process tag types from the master data library and rename the

control module types. Example: CMT > "Example_Motor(1)" to "Example_Motor" Figure 3-30: Deleting process tag types and renaming CMTs

Page 26: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.2 Updating/preparing PCS 7 project data

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 26

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

4. Open the created control module types and make an assignment for the name of the control module type in the plant I/Os of the respective control module type. For this purpose, right-click in the field of the "Assignment" column and the "Name" row. The "Add chart ..." button is displayed. Click on the "Add chart ..." button to assign a chart to the name.

Figure 3-31: Assigning the name of the control module

NOTICE If this assignment is not made, as a consequence the instances will not be created correctly when the chart names are generated.

Note The basic functional principles of that are not described explicitly in this section.

The functional principles and configuration of CMTs are described in great detail and well-illustrated in the following document.

Application Example: "Performance Mass Data Engineering with PCS 7 Advanced ES on a Practical Example"

http://support.automation.siemens.com/WW/view/en/61627479

3.2.4 Procedure: CMs created out of CMTs, master data library used

In this case you do not have to make any changes as you already use the new type concept.

Page 27: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 27

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.3 Processing in AdvES This section describes how to import your updated PCS 7 project data in AdvES, transfer the previously saved project data from Excel lists to AdvES, and then export the data to PCS 7.

Note The basic functional principles of AdvES are not described explicitly in this section but are a prerequisite for further processing.

Basic information on AdvES and its functional principles are described in great detail and well-illustrated in the following document.

Application Example: "Performance Mass Data Engineering with PCS 7 Advanced ES on a Practical Example"

http://support.automation.siemens.com/WW/view/en/61627479

Procedure 1. Open AdvES. 2. Only import the Control module types (CMT) and Hardware in AdvES.

Figure 3-32: AdvES user interface

3. Assign the signals and parameters to the mapping labels and generate the copy templates.

1.

2.

3.

Page 28: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 28

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

4. Create a configuration file for the import of the project data from the previously saved Excel file that contains the information from the "General" tab in the Process Object View (see section 3.1, steps 7.-10.). Create the configurator with the respective assignments as shown in the following table:

Table 3-1: Configurator structure

Excel column

Name Mapping class Mapping target

A Hierarchy Example: Plant(1)\ Plant section(1)\ Function(1)\

Technological hierarchy

02 (hierarchy folder level 1) Use splitting to filter out the information: Plant(1) Plant(1)\Plant section(1)\ Function(1)\ Use splitting to filter out the information: Plant section(1) Plant(1)\Plant section(1)\ Function(1)\ 02 (hierarchy folder level ...) Use splitting: ...

B Name (of the chart) Measuring point 02 (control module AdvES)

L AS Example: SIMATIC 400(1)\CPU 416-3 DP\S7 Program(1)

Process tag attribute

Station name Use splitting to filter out the information: SIMATIC 400 (1) SIMATIC 400(1)\CPU 416-3 DP\S7 Program(1)

Figure 3-33: AdvES configurator for the Excel list with the "general" project information

Page 29: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 29

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

5. Create a configuration file for the import of the project data from the previously saved Excel file that contains the information from the "Signals" tab in the Process Object View (see section 3.1, steps 11.-14.). Create the configurator with the respective assignments as shown in the following table:

Table 3-2: Configurator structure

Excel column

Name Mapping class Mapping target

A Hierarchy Example: Plant(1)\ Plant section(1)\ Function(1)\

Technological hierarchy

02 (hierarchy folder level 1) Use splitting to filter out the information: Plant(1) Plant(1)\Plant section(1)\ Function(1)\ 02 (hierarchy folder level 2) Use splitting to filter out the information: Plant section(1) Plant(1)\Plant section(1)\ Function(1)\ 02 (hierarchy folder level ...) Use splitting: ...

B Chart Measuring point 02 (control module AdvES)

T AS Example: SIMATIC 400(1)\CPU 416-3 DP\S7 Program(1)

Process tag attribute

Station name Use splitting to filter out the information: SIMATIC 400 (1) SIMATIC 400(1)\CPU 416-3 DP\S7 Program(1)

K Signal Example: M100_FBR

Signal Use splitting: Use splitting to filter out the information: M100_FBR M100_FBR

K Signal Example: M100_FBR

Signal attribute PCS 7 signal name

Page 30: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 30

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Q HW address Example: SIMATIC 400(1)/CPU 416-3 DP/1/3/4/0

Signal attribute Station name Use splitting to filter out the information: SIMATIC 400 (1) SIMATIC 400(1)/CPU 416-3 DP/1/3/4/0

Signal attribute Subnet Use splitting to filter out the information: 1 SIMATIC 400(1)/CPU 416-3 DP/1/3/4/0

Signal attribute Address Use splitting to filter out the information: 3 SIMATIC 400(1)/CPU 416-3 DP/1/3/4/0

Signal attribute Slot Use splitting to filter out the information: 4 SIMATIC 400(1)/CPU 416-3 DP/1/3/4/0

Signal attribute Channel Use splitting to filter out the information: 0 SIMATIC 400(1)/CPU 416-3 DP/1/3/4/0

Page 31: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 31

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

Figure 3-34: AdvES configurator for the Excel list with the "signal" information

Figure 3-35: AdvES configurator for the Excel list with the "signal" information

Page 32: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 32

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

6. Create a configuration file for the import of the project data from the previously saved Excel file that contains the information from the "Signals" tab in the Process Object View (see section 3.1, steps 15.-18.). Create the configurator with the respective assignments as shown in the following table:

Table 3-3: Configurator structure

Excel column

Name Mapping class Mapping target

A Hierarchy Example: Plant(1)\ Plant section(1)\ Function(1)\

Technological hierarchy

02 (hierarchy folder level 1) Use splitting to filter out the information: Plant(1) Plant(1)\Plant section(1)\ Function(1)\

Use splitting to filter out the information: Plant section(1) Plant(1)\Plant section(1)\ Function(1)\ 02 (hierarchy folder level ...) Use splitting: ...

B Chart Measuring point 02 (control module AdvES)

G Block icon

Process tag attribute

Control icon

Figure 3-36: AdvES configurator for the Excel list with the "block" information

Page 33: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.3 Processing in AdvES

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 33

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

7. Import the data from the Excel files. 8. Type the control modules. 9. Adapt the name of the Profibus master system (in AdvES) to the name of the

PCS 7 project, for example, from "1" (AdvES) to "PROFIBUS(1) (PCS 7)". 10. Export the data to your STEP 7 project.

You can now continue to work either in a new project or in the existing project. The following options are provided for that: – If you want to export the data to a new PCS 7 project, you can check the

check boxes for Plant hierarchy, Control modules, and Hardware in the filter settings for the export (that is the default setting). Figure 3-37: AdvES export to a new PCS 7 project

– If you want to export the data to the existing PCS 7 project, check the check boxes for Plant hierarchy and Control modules in the filter settings for the export. You do not have to export the hardware as it has already been created. Figure 3-38: AdvES export to an existing PCS 7 project

Note 1. If you use a new project, mind that the OS project has to be adapted. 2. If you continue to use the old project, you should delete the hierarchy and

the CFCs contained therein.

Page 34: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.4 Project postprocessing in PCS 7

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 34

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.4 Project postprocessing in PCS 7

This section describes the tasks to be accomplished subsequently. These depend on where you exported your data to using AdvES:

– You exported the AdvES data to a new project in the multiproject (see section 3.4.1).

– You exported the AdvES data to your "old" project in the multiproject (see section 3.4.2).

3.4.1 New project in the multiproject

Procedure In the project, the control modules are now created on the basis of the CMTs and the I/Os are interconnected with the module channels. As the next step you now have to transfer the remaining project data from the "old" PCS 7 project that you have saved before (see section 3.1, steps 1.-6.). 1. Open the Process Object View in PCS 7 for that. 2. Select the subproject and right-click to open the context menu.

Click on the command: "Process Objects > Import I/Os...". Figure 3-39: SIMATIC PCS 7 Process Object View

Page 35: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.4 Project postprocessing in PCS 7

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 35

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3. The "Import I/Os" dialog opens. To transfer the data, select the backup file in the dialog (see section 3.1, step 6.) and click on the "OK" button.

Figure 3-40: "Import I/Os" dialog

Note Warnings may occur during the transfer of the project data because already existing data are overwritten.

You have now adapted the project in such a way that you can use AdvES and the new type concept.

Page 36: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.4 Project postprocessing in PCS 7

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 36

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3.4.2 Old project in the multiproject

Procedure In the project, the control modules are now created on the basis of the CMTs and the I/Os are interconnected with the module channels. If you had not deleted the plant hierarchy and the CFCs contained therein before you exported the AdvES project data to the PCS 7 project, the PCS 7 project now contains not only the existing CFCs but also the control modules. Figure 3-41: Example of double instances after the AdvES export

Delete the "old" CFCs and rename the CMTs to the original names of the equivalent CFCs. Example: Delete the CFC "Example_Motor" and rename the CMT "Example_Motor(1)" to "Example_Motor". As the next step you now have to transfer the remaining project data from the "old" PCS 7 project that you have saved before (see chapter 3.1, steps 1.-6.). 1. Open the Process Object View in PCS 7 for that. 2. Select the subproject and right-click to open the context menu.

Click on the command: "Process Objects > Import I/Os...". Figure 3-42: SIMATIC PCS 7 Process Object View

Page 37: PCS7 Project Adaption AdvES

3 Solution and Implementation 3.4 Project postprocessing in PCS 7

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 37

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

3. The "Import I/Os" dialog opens. To transfer the data, select the backup file in the dialog (see section 3.1, step 6.) and click on the "OK" button.

Figure 3-43: "Import I/Os" dialog

Note Warnings may occur during the transfer of the project data because already existing data are overwritten.

You have now adapted the project in such a way that you can use AdvES and the new type concept.

Page 38: PCS7 Project Adaption AdvES

4 Conclusion

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 38

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

4 Conclusion With the help of this procedure you have prepared a PCS 7 project for AdvES, taken over the interconnections of the old project, and transferred the hardware inclusive of the icon table and interconnection with the channel driver blocks. Moreover, you have updated your "old" PCS 7 project to the new SIMATIC PCS 7 type concept and can thus use all new functionalities for mass data engineering (for example, CMT/CM comparison or variants formation). Furthermore, you now have the option to exchange parameter value changes bidirectionally between PCS 7 and AdvES.

Page 39: PCS7 Project Adaption AdvES

5 Further Links

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 39

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

5 Further Links Table 5-1: Internet links

Subject Title

1 Application: Performance Mass Data Engineering with PCS 7 Advanced ES on a Practical Example

Entry ID: 61.627.479 http://support.automation.siemens.com/WW/view/en/61627479

2 "SIMATIC Process Control System PCS 7; Advanced Engineering System"

Entry ID: 57.414.032 http://support.automation.siemens.com/WW/view/en/57414032

3 "SIMATIC Process Control System PCS 7 CFC for SIMATIC S7 (V8.0)"

Entry ID: 60.283.984 http://support.automation.siemens.com/WW/view/en/60283984

4 FAQ: How can you export and then re-import PCS 7 Advanced ES project data?

Entry ID: 62.884.021 http://support.automation.siemens.com/WW/view/en/62884021

5 Application: Integrated Engineering with COMOS and SIMATIC PCS 7 using a practical example

Entry ID: 70.922.226 http://support.automation.siemens.com/WW/view/en/70922226

6 Online article: Service Pack 1 for SIMATIC PCS 7 V8.0 (EU) Released for Delivery

Entry ID: 67.798.122 http://support.automation.siemens.com/WW/view/en/67798122

7 Online article: SIMATIC PCS 7 Advanced Engineering System V8.0 Service Pack 1

Entry ID: 68.402.701 http://support.automation.siemens.com/WW/view/en/68402701

8 Siemens Whitepaper "Fast Track Engineering"

German: http://www.automation.siemens.com/mcms/process-control-systems/SiteCollectionDocuments/efiles/pcs7/support/marktstudien/WP_Fast-Track-Engineering_DE.pdf English: http://www.automation.siemens.com/mcms/process-control-systems/SiteCollectionDocuments/efiles/pcs7/support/marktstudien/WP_Fast-Track-Engineering_EN.pdf

Page 40: PCS7 Project Adaption AdvES

6 History

Adaption of existing PCS 7 Projects for the Use of Advanced ES V1.0, Entry ID: 82949027 40

Cop

yrig

ht

Sie

men

s AG

201

3 Al

l rig

hts

rese

rved

6 History Table 6-1

Version Date Modifications

V1.0 11/2013 First version