PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Dam Repair
A Case Study of the Girotte Dam in France
By Murphy Mahaffey
Director International Sales
WIWA Wilhelm Wagner GmbH & Co. KG
![Page 2: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/2.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Overview
• History of the Girotte Dam• Design• Project Requirements• Application• Performance to Date• Contributors to the Project
![Page 3: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/3.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
History of the Girotte Dam
• Located in the Rhone-Alpes Region near Hauteluce
• Girotte Lake producing electricity since 1903
• Built from 1942-1949• First Sub-Glacial inlet
structure in the world
![Page 4: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/4.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Construction of Girotte Dam
![Page 5: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/5.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Girotte Dam Design• Multiple Arch and Buttress
Design– 18 Arches held by Fixed
Buttresses• Unreinforced Concrete
– Due to Shortage of Steel• 45 m / 148 Feet Tall• 510 m / 1,675 feet long• Spans a mountain ridge
– 1,747m /5,732 feet elevation
![Page 6: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/6.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Girotte Dam Design
• Reservoir Surface Area is 75 ha / 8.7 million square feet
![Page 7: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/7.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Girotte Dam Conditions• Difficult Weather Conditions
– Cycling Temperatures and Elevation are demanding on a Concrete Structure, morning temperatures on job were 10C / 50F
– Aggressive Glacial Waters from Tré-la-Tête Glacier
– Wind Erosion• Elevation 1,747m / 5,732 feet• Aggressive Glacial Water• Multiple Coatings over time- paint, resin, etc.
![Page 8: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/8.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Girotte Condition Report 2006
Condition Report in March 2006
- Cracks observed in wall
- Escapes at some membranes (leaks)
![Page 9: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/9.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Material Specification and Budgeting
Polyurea offered these advantages over other competing systems:
• Fast setting• Sprayable• High-Build• Ease of Application• Exceptional Life
![Page 10: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/10.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Safety Considerations• Difficult Access• Harness Work• Changing Weather Conditions
– Temperature, Wind• Elevation• Communication with Sprayer• Environmentally Sensitive Area• Equipment Operation• Material Handling
![Page 11: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/11.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Application
• Visual Inspection– Individual drops by
rope and harness over all 18 arches and buttress
– Top of Dam to Base
– Safety is a Priority
![Page 12: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/12.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Application
• Identify and Mark Cracks
• Grind Cracks Down
![Page 13: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/13.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Application
• Apply 2-Component Epoxy Primer
![Page 14: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/14.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Application
Equipment Requirements
• 110 Bar / 1,600 psi spray pressure
• 70C / 160F material temperature
![Page 15: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/15.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea ApplicationEquipment
Requirements• Full access to
Wall Base 45m• Heated Hose• High Delta T
Heaters• Impingement
Mixing Spray Gun
![Page 16: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/16.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea ApplicationEquipment
Safety Requirements
• Over Pressure Shutdown
• Over Temperature Shutdown
• Ratio Monitoring
![Page 17: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/17.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Application
![Page 18: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/18.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Job Details
• 1,200 Kilos / 2,645 lbs. of Polyurea Sprayed– 110Bar / 1,600 psi;
70C / 160F• Applied over 5 Days
– Changing Weather Conditions
![Page 19: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/19.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Performance to Date
System Performing Within Specification
![Page 20: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/20.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Polyurea Dam Repair Success
![Page 21: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/21.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Contributing CompaniesSPIE Batignolles- Application
BMS- Equipment Supplier
Tradecc- Polyurea Material
WIWA- Equipment Design and
Technical Support
WIWA France- Laksander Michel
![Page 22: PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November Polyurea Dam Repair A Case Study of the Girotte Dam in France By Murphy](https://reader038.vdocument.in/reader038/viewer/2022102900/551b15ef55034607418b5550/html5/thumbnails/22.jpg)
PDA Europe 2010 Annual Conference – It’s Time to… Polyurea – Sitges, 15-17 November
Thank You!
Polyurea Dam Repair
A Case Study of the Girotte Dam in France
By Murphy Mahaffey
Director International Sales
WIWA Wilhelm Wagner GmbH & Co. KG