91194 rev b - homedepot.com 3/8-16 x 1.25 carriage bolt 91079 floating shelf 91129 pedestal for type...
TRANSCRIPT
�9��94_F_INSTALL AF PART # 9��94 Rev B
A FLORENCE COMPANY
5935 CORPORATE DRIVEMANHATTAN, KANSAS 66503
Ph. 800-275-1747Fax. 800-275-5081
www.auth-florence.com
YOUR ISO 9001 MAILBOX SUPPLIER
MAINTENANCE MANUALMETAL CBU TYPES I, II, III, AND IV
INSTALLATION MANUALMETAL CBU
TYPES I, II, III, AND IV
TABLE OF CONTENTSDESCRIPTION PAGE
CBU INFORMATION 2
SITE PREPARATION AND PEDESTAL INSTALLATION 3SECURITY TOOL REQUIREMENTS 4INSTALLATION OF AN ARROW LOCK 5PARCEL ARROW LOCK INSTALLATION 7PEDESTAL TO CBU INSTALLATION 9
1570 “F” SERIES
� 9��94_F_INSTALL AF PART # 9��94 Rev B
THIS PAGE INTENTIONALLY LEFT BLANK.
�9��94_F_INSTALL AF PART # 9��94 Rev B
TYPE I TYPE II TYPE III TYPE IVINSTALLED HEIGHT 6�” 6�” 6�” 6�”
DEPTH �7-7/8” �7-7/8” �7-7/8” �7-7/8”
WIDTH �0-�/�” �0-�/�” �0-�/�” �0-�/�”
WEIGHT (WITHOUT PEDESTAL) �07 LBS ��� LBS �47 LBS ��7 LBS
WEIGHT (WITH PEDESTAL) ��5 LBS ��9 LBS �6� LBS �5� LBS
QTY OF STANDARD COMPARTMENTS 8 �� �6 ��
QTY OF PARCEL COMPARTMENTS � � � �
PARCEL COMPARTMENT HEIGHT �0”, ��” �0” �0”, ��” �0”
I II III IV
4 9��94_F_INSTALL AF PART # 9��94 Rev B
BOX OUTLINE BOX OUTLINE BOX OUTLINE
REINFORCING STEEL RODSON 14.00” CENTERS MAXIMUM EACH WAY (CONFORMING TO ASTM A615 GRADE 60)
(CONFORMING TO ASTM A193, GRADE B8MTYPE 316 STAINLESS STEEL, NOT INCLUDED)
0.25
MOUNTING NUT/WASHER (NOT INCLUDED)
NOTE:CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 3000 PSI @ 28 DAYS, CONTAIN 4% MIN ~ 6% MAX AIR ENTRAPMENT AND BE PLACED WITH A 3.50 ~ 4.50 SLUMP IN ACCORDANCE TO 301.
SITE PREPARATIONAND PEDESTAL INSTALLATION
METAL CBU TYPES I, II, III, AND IV1570 “F” SERIES
59��94_F_INSTALL AF PART # 9��94 Rev B
IMPORTANT NOTICE FOR USPS INSTALLERSMETAL CBU TYPES I, II, III, AND IV
1570 “F” SERIES
INSTALLER MUST ORDER McGARD SCREW DRIVER (USPS - MAIL EQUIPMENT SHOP PART NUMBER ��0050)
TO INSTALL AND SERVICE THE PARCEL ARROW LOCK COVER ON THE NEW AUTH-FLORENCE CBU.
McGARD SCREW DRIVER MES NO. 110050
IT MAY BE ORDERED BY FAXING AN “OFF CATALOG” eBUY REQUEST TO:
USPS MAIL EQUIPMENT SHOPFAX NO. (�0�) �8�-�64�
QUESTIONS? CALL THE USPS MAIL EQUIPMENT SHOP AT (�0�) �8�-�6�0
IF THE
NEEDS TO BE ORDERED
6 9��94_F_INSTALL AF PART # 9��94 Rev B
INSTALLATION OF AN ARROW LOCKMETAL CBU TYPES I, II, III, AND IV
PART # DESCRIPTION86091 10-32 LOCK NUT92300 ARROW LOCK SECURITY BRACKET 92303 LOCK SUPPORT PLATE
ARROW LOCK
REQUIRED TOOLS3/8” SOCKET WRENCH
OPEN ARROW LOCK DOOR.
REMOVE FIVE (5) 86091 10-32 LOCK NUTS, AS WELL AS 92303 LOCK SUPPORT PLATE (DISPOSE OF PLASTIC SHIPPING SPACER).
PLACE ARROW LOCK IN TO ARROW LOCK SECURITY BRACKET AND POSITION ON DOOR.
REPLACE ONE (1) 86091 10-32 LOCK NUT IN THE REAR POSITION TO SECURE ARROW LOCK SECURITY BRACKET.
INSTALL 92303 LOCK SUPPORT PLATE AS SHOWN.
REPLACE FOUR (4) 86091 10-32 LOCK NUTS. TORQUE 250 TO 30 INCH-POUNDS.
1.2.
3.
4.
5.
1570 “F” SERIES
6.
79��94_F_INSTALL AF PART # 9��94 Rev B
86091
ARROW LOCK
3/5.
92303
6.
4.
PLASTICSHIPPINGSPACER
2.
1.
INSTALLATION OF AN ARROW LOCK
8 9��94_F_INSTALL AF PART # 9��94 Rev B
PARCEL ARROW LOCK INSTALLATIONMETAL CBU TYPES I, II, III AND IV
PART # DESCRIPTION84993 10-32 x .312 UNF-2A 18-8 SS
PASSIVATED MCGARD84994 10-32 X .375 UNF-2A 18-8 SS
PASSIVATED 1-WAY TAMPER PROOF86091 10-32 LOCK NUT91255 LATCHING ASSEMBLY COVER91259 ARROW LOCK COVER
ARROW LOCK
REQUIRED TOOLSFLAT SCREWDRIVERUSPS PROPRIETARY MCGARD TOOL3/8” SOCKET WRENCHPLIERS
OPEN PARCEL DOOR, REMOVE AND DISCARD FOUR (4) PLASTIC SHIPPING RETAINERS (TWO ON LATCHING ASSEMBLY COVER AND TWO ON ARROW LOCK COVER).
REMOVE PLASTIC BAG OF FASTENERS (IT CONTAINS ALL FASTENERS NECESSARY TO INSTALL POSTAL LOCK IN ONE PARCEL DOOR).
INSTALL ARROW LOCK AS SHOWN AND SECURE WITH FOUR (4) 86091 10-32 LOCK NUTS. TORQUE 25 to 30 INCH-POUNDS.
INSTALL LATCHING ASSEMBLY COVER 91255 USING TWO (3) 84994 10-32 X .375 UNF-2A 18-8 SS PASSIVATED 1-WAY TAMPER PROOF FASTENERS.
INSTALL ARROW LOCK COVER 91259 USING TWO (2) 84993 10-32 X .312 UNF-2A 18-8 SS PASSIVATED MCGARD FASTENERS.
REMOVE LABEL FROM COVER.
1.
2.
3.
4.
1570 “F” SERIES
5.
6.
99��94_F_INSTALL AF PART # 9��94 Rev B
1.
3.
4.
8609191255
91259
84993
84994
5.
1/2.
6.
PLASTICSHIPPING
RETAINERS
PARCEL ARROW LOCK INSTALLATION
�0 9��94_F_INSTALL AF PART # 9��94 Rev B
PEDESTAL TO CBU INSTALLATIONMETAL CBU TYPES I, II, III AND IV
PART # DESCRIPTION86089B 3/8-16 HEX NUT86101 3/8-16 X 1.25 CARRIAGE BOLT91079 FLOATING SHELF91129 PEDESTAL FOR TYPE I, II91121 PEDESTAL FOR TYPE III, IV86097 3/8” X .688 OD LOCK WASHER
REQUIRED TOOLS9/16” SOCKET WRENCH
OPEN MASTER LOADING DOORS.
REMOVE LEFT AND RIGHT SIDE 91079 FLOATING SHELVES, EXPOSING MOUNTING HOLES.
PLACE UNIT ON PEDESTAL.
FROM UNDERNEATH UNIT, INSERT FOUR (4) 86101 3/8-16 X 1.25 CARRIAGE BOLTS UPWARD.
FROM INSIDE PARCEL COMPARTMENTS, ADD FOUR (4) 86097 3/8” X .688 OD LOCK WASHER AND TIGHTEN FOUR (4) 86089B 3/8-16 HEX NUTS. TORQUE TO 22 FOOT-POUNDS.
REPLACE LEFT AND RIGHT SIDE 91079 FLOATING SHELVES.
1.2.
3.4.
5.
6.
1570 “F” SERIES
��9��94_F_INSTALL AF PART # 9��94 Rev B
PEDESTAL TO CBU INSTALLATION
1.
2/6.
4.
86101
91079
86084B
86097 3.
5.86089B