PE Pipe Applications -Case Story
Marmara Earthquakeİzmir Aliağa Thermal Power Plant
03 April 2003 - AnkaraHakan Belen
d o n ‘ t c r a c k u n d e r p r e s s u r e 24/2003PE100+ Association
Marmara earthquake
In the past we thought that hardness was the uniquecriteria of durable and lasting systems.
And based on this criteria we estimated lifetime.
Thus, from the last disaster we learnt that there are suchpowers in the nature, that durability and lifetime depend on being in harmony with them.
d o n ‘ t c r a c k u n d e r p r e s s u r e 34/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 44/2003PE100+ Association
Hard wallsHow hard the walls are, how easily pipes got broken. Result: increase in waste product.
d o n ‘ t c r a c k u n d e r p r e s s u r e 54/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 64/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 74/2003PE100+ Association
Meaning that when building an infrasructure withhard pipes, risk of loss costs has already beenaccepted.
d o n ‘ t c r a c k u n d e r p r e s s u r e 84/2003PE100+ Association
RESULT
d o n ‘ t c r a c k u n d e r p r e s s u r e 94/2003PE100+ Association
‘‘A waterless city”
d o n ‘ t c r a c k u n d e r p r e s s u r e 104/2003PE100+ Association
‘‘A waterless city”
In Adapazarı some lucky districts waited just for therepair. In these infrastructure systems PE100 products were installed.
What about others? Earthquake result in 70% of theinfrastructure systems of Adapazarı being out of order.
d o n ‘ t c r a c k u n d e r p r e s s u r e 114/2003PE100+ Association
Lifetime
d o n ‘ t c r a c k u n d e r p r e s s u r e 124/2003PE100+ Association
Lifetime
Lifetime (no need for maintenance) of an infrastructure system is estimated with lifetimes of each component.
For example; a pipe’s being leak tight depends on itsjoint’s and sleev’s lifetime.
d o n ‘ t c r a c k u n d e r p r e s s u r e 134/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 144/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 154/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 164/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 174/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 184/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 194/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 204/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 214/2003PE100+ Association
d o n ‘ t c r a c k u n d e r p r e s s u r e 224/2003PE100+ Association
Corrosion and erosion
d o n ‘ t c r a c k u n d e r p r e s s u r e 234/2003PE100+ Association
Corrosion and erosion
Conditions of the terrain are other criterias that affectthe life time:– Frequent rain,– Alkaline and salt rich soil shortens life time of the
product significantly.
d o n ‘ t c r a c k u n d e r p r e s s u r e 244/2003PE100+ Association
Before Marmara Eartquake, “İller Bankası” altered 380km. of Asbestos Cement and PVC pipelines with PE100 pipesin Adapazarı.
Marmara Eartquake drinking water pipe failure statistics:Pipe Type Failures (pcs/km)Ductile iron 0,488Cast iron 1,508PVC 1,430Steel 0,437Asbestos cement 1,782PE 100 Boru 0 (no failure)
d o n ‘ t c r a c k u n d e r p r e s s u r e 254/2003PE100+ Association
As a result...
İller Bankası decided on puchasing PE100 pipes forAdapazarı drinking water pipelines and mains.
These pipes were only bought from PE100 producers.
d o n ‘ t c r a c k u n d e r p r e s s u r e 264/2003PE100+ Association
Case Story 2-İzmir Aliağa Thermal Power Plant
d o n ‘ t c r a c k u n d e r p r e s s u r e 274/2003PE100+ Association
PE100 products, are suitable for fire and cooling pipelines applications. İzmir-Aliağa is one of these kind of Thermal Power Plants, that was built with thecollaboration of Enka & Bechtel.
d o n ‘ t c r a c k u n d e r p r e s s u r e 284/2003PE100+ Association
With this project 11,5% of total electricity demand is aimed to supply.In the beginning it was considered on steel pipes. Afterthe presentation, it was decided on PE100.
d o n ‘ t c r a c k u n d e r p r e s s u r e 294/2003PE100+ Association
All of the fire and cooling lines were built with PE100 pipesand fittings. 200-500 mm, PN 16800-1000 mm, PN 12,5pipes were usedThis project is the second all over the world that 800 mm PN12,5 pipes were used. And the first for 1000 mm PN12,5 pipes.
d o n ‘ t c r a c k u n d e r p r e s s u r e 304/2003PE100+ Association
Total pipe consumption of the previous mentionedPE100 pipes is 12000 mt.
d o n ‘ t c r a c k u n d e r p r e s s u r e 314/2003PE100+ Association
Power plant is in use since project finalised in August2002.
d o n ‘ t c r a c k u n d e r p r e s s u r e 324/2003PE100+ Association
Various fittings and joints were used.