PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hanson Aggregates Lindy Paving Inc. New Enterprise Stone & Lime Co.
District 1 Location: HOME Connellsville, PA New Galilee, PA New Enterprise, PA
Homewood Maintenance
2399 1083 837
ITEM DESCRIPTIONS PRICE PER TON PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $42.00 $25.24 $40.33
7387 (AASHTO #57) STONE 2B $31.62 $25.24 $35.83
7388 STONE 2RC $29.62 $23.43 $28.58
7389 (AASHTO #2A) STONE 2A MOD. $29.62 $23.43 $31.08
7390 (AASHTO #3) STONE 3A $31.62 $25.24 $36.63
7391 (AASHTO #1) STONE 4 $31.62 $25.24 $36.33
7392 (AASHTO #10) SCREENING $29.00 $24.00 $33.43
7394 R-3 ROCK $34.62 $28.84 $41.28
7393 R-4 ROCK $34.62 $28.84 $42.28
7395 R-5 ROCK $37.62 $38.11 $44.28
7396 R-6 ROCK $40.00 $38.11 $44.28
7398 SAND, TYPE A, CONCRETE NB $22.00 $54.00
MINIMUM DELIVERY/ TONS 22 23
NO BIDS:
Homewood - 1
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hanson Aggregates New Enterprise Stone & Lime Co. Allegheny Mineral Corporation Lindy Paving Inc.
District 1 Location: GIBS Connellsville, PA New Enterprise, PA Kittanning, PA New Galilee, PA
Gibsonia Maintenance
2399 837 793 1083
ITEM DESCRIPTION PRICE PER TON PRICE PER TON PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $37.00 $36.07 $27.00 $31.83
7387 (AASHTO #57) STONE 2B $27.35 $31.57 $23.50 $29.73
7388 STONE 2RC $24.95 $24.32 $22.00 $28.15
7389 (AASHTO #2A) STONE 2A MOD. $24.95 $26.82 $22.00 $28.15
7390 (AASHTO #3) STONE 3A $27.35 $32.37 $23.50 $29.73
7391 (AASHTO #1) STONE 4 $27.35 $32.37 $23.75 $29.73
7392 (AASHTO #10) SCREENING $24.00 $29.17 $21.12 $26.52
7394 R-3 ROCK $29.95 $37.02 $23.95 $30.25
7393 R-4 ROCK $29.95 $38.02 $23.95 $30.25
7395 R-5 ROCK $32.95 $40.02 $38.84 NB
7396 R-6 ROCK $35.50 $40.02 $38.84 NB
7398 SAND, TYPE A, CONCRETE NB $49.50 NB $24.00
MINIMUM DELIVERY/TONS 22 23 20
NO BIDS:
Gibsonia - 2
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hanson Aggregates New Enterprise Stone & Lime Co.
District 1 Location: GREEConnellsville, PA New Enterprise, PA
Greensburg (AKH)
2399 837
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $32.00 $29.92
7387 (AASHTO #57) STONE 2B $22.85 $25.42
7388 STONE 2RC $19.45 $18.17
7389 (AASHTO #2A) STONE 2A MOD. $19.45 $20.67
7390 (AASHTO #3) STONE 3A $22.85 $26.22
7391 (AASHTO #1) STONE 4 $22.85 $26.22
7392 (AASHTO #10) SCREENING $18.35 $23.02
7394 R-3 ROCK $26.50 $30.87
7393 R-4 ROCK $26.50 $31.87
7395 R-5 ROCK $28.85 $33.87
7396 R-6 ROCK $32.00 $33.87
7398 SAND, TYPE A, CONCRETE NB $43.50
MINIMUM DELIVERY/TONS 22 23
NO BIDS:
Greensburg - 3
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hanson Aggregates New Enterprise Stone & Lime Co.
District 1 Location: HARC Connellsville, PA New Enterprise, PA
Harrison City Maintenance
2399 837
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $33.00 $31.91
7387 (AASHTO #57) STONE 2B $23.65 $27.41
7388 STONE 2RC $20.35 $20.16
7389 (AASHTO #2A) STONE 2A MOD. $20.35 $22.66
7390 (AASHTO #3) STONE 3A $23.65 $28.21
7391 (AASHTO #1) STONE 4 $23.65 $28.21
7392 (AASHTO #10) SCREENING $19.35 $25.01
7394 R-3 ROCK $27.25 $32.86
7393 R-4 ROCK $27.25 $33.86
7395 R-5 ROCK $29.65 $35.86
7396 R-6 ROCK $33.00 $35.86
7398 SAND, TYPE A, CONCRETE NB $41.15
MINIMUM DELIVERY/TONS 22 23
NO BIDS:
Harrison City - 4
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co. Hanson Aggregates
District 1 Location: DNGL New Enterprise, PA Connellsville, PA
Donegal Maintenance
837 2399
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $26.27 $28.00
7387 (AASHTO #57) STONE 2B $21.77 $19.00
7388 STONE 2RC $14.52 $16.00
7389 (AASHTO #2A) STONE 2A MOD. $17.02 $16.00
7390 (AASHTO #3) STONE 3A $22.57 $19.00
7391 (AASHTO #1) STONE 4 $22.57 $19.00
7392 (AASHTO #10) SCREENING $19.37 $16.00
7394 R-3 ROCK $27.22 $21.50
7393 R-4 ROCK $28.22 $21.50
7395 R-5 ROCK $30.22 $24.50
7396 R-6 ROCK $30.22 $26.75
7398 SAND, TYPE A, CONCRETE $37.15 NB
MINIMUM DELIVERY/TONS 23 22
NO BIDS:
Donegal - 5
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hanson Aggregates
District 1 Location: JEFF Connellsville, PA
Jefferson Hills
2399
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $36.00
7387 (AASHTO #57) STONE 2B $26.50
7388 STONE 2RC $24.50
7389 (AASHTO #2A) STONE 2A MOD. $24.50
7390 (AASHTO #3) STONE 3A $26.50
7391 AASHTO #1) STONE 4 $26.50
7392 (AASHTO #10) SCREENING $22.50
7394 R-3 ROCK $29.50
7393 R-4 ROCK $29.50
7395 R-5 ROCK $32.50
7396 R-6 ROCK $34.65
7398 SAND, TYPE A, CONCRETE NB
MINIMUM DELIVERY/TONS 22
NO BIDS:
Jefferson Hills - 6
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hanson Aggregates
District 1 Location: SEAR Connellsville, PA
Searights Maintenance
2399
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $32.00
7387 (AASHTO #57) STONE 2B $22.00
7388 STONE 2RC $19.85
7389 (AASHTO #2A) STONE 2A MOD. $19.85
7390 (AASHTO #3) STONE 3A $22.00
7391 (AASHTO #1) STONE 4 $22.00
7392 (AASHTO #10) SCREENING $19.35
7394 R-3 ROCK $25.50
7393 R-4 ROCK $25.50
7395 R-5 ROCK $28.50
7396 R-6 ROCK $30.50
7398 SAND, TYPE A, CONCRETE NB
MINIMUM DELIVERY/TONS 22
NO BIDS:
Searights - 7
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co.
District 2 Location: SMST New Enterprise, PA
Somerset Maintenance
837
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $27.92
7387 (AASHTO #57) STONE 2B $23.42
7388 STONE 2RC $16.17
7389 (AASHTO #2A) STONE 2A MOD. $18.67
7390 (AASHTO #3) STONE 3A $24.22
7391 AASHTO #1) STONE 4 $24.22
(AASHTO #10) SCREENING $21.02
7394 R-3 ROCK $28.87
7393 R-4 ROCK $29.87
7395 R-5 ROCK $31.87
7396 R-6 ROCK $31.87
7398 SAND, TYPE A, CPMCRETE $33.58
MINIMUM DELIVERYTONS 23
NO BIDS:
Somerset - 8
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co.
District 2 Location: KEGG New Enterprise, PA
Kegg Maintenance
837
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $23.16
7387 (AASHTO #57) STONE 2B $19.16
7388 STONE 2RC $15.16
7389 (AASHTO #2A) STONE 2A MOD. $17.41
7390 (AASHTO #3) STONE 3A $20.66
7391 (AASHTO #1) STONE 4 $20.66
7392 (AASHTO #10) SCREENING $18.16
7394 R-3 ROCK $21.66
7393 R-4 ROCK $22.66
7395 R-5 ROCK $25.16
7396 R-6 ROCK $25.16
7398 SAND, TYPE A, CONCRETE $32.89
MINIMUM DELIVERY/TONS 23
NO BIDS:
Kegg - 9
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co.
District 2 Location: EVRT New Enterprise, PA
Everett Maintenance
837
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $19.15
7387 (AASHTO #57) STONE 2B $15.15
7388 STONE 2RC $11.15
7389 (AASHTO #2A) STONE 2A MOD. $13.40
7390 (AASHTO #3) STONE 3A $16.65
7391 (AASHTO #1) STONE 4 $16.65
7392 (AASHTO #10) SCREENING $14.15
7394 R-3 ROCK $17.65
7393 R-4 ROCK $18.65
7395 R-5 ROCK $21.15
7396 R-6 ROCK $21.15
7398 SAND, TYPE A, CONCRETE $34.95
MINIMUM DELIVERY/TONS 23
NO BIDS:
Everett - 10
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co.
District 2 Location: BRNT New Enterprise, PA
Burnt Cabins Maintenance
837
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $26.29
7387 (AASHTO #57) STONE 2B $22.29
7388 STONE 2RC $18.29
7389 (AASHTO #2A) STONE 2A MOD. $20.54
7390 (AASHTO #3) STONE 3A $23.79
7391 (AASHTO #1) STONE 4 $23.79
7392 (AASHTO #10) SCREENING $21.29
7394 R-3 ROCK $24.79
7393 R-4 ROCK $25.79
7395 R-5 ROCK $28.29
7396 R-6 ROCK $28.29
7398 SAND, TYPE A, CONCRETE $34.90
MINIMUM DELIVERY/TONS 23
NO BIDS:
Burnt Cabins - 11
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co. Pennsy Supply Inc
District 3 Location: NEWV New Enterprise, PA Harrisburg, PA
Newville Maintenance
837 843
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $21.32 $24.65
7387 (AASHTO #57) STONE 2B $18.32 $20.17
7388 STONE 2RC $12.82 $13.70
7389 (AASHTO #2A) STONE 2A MOD. $14.82 $15.71
7390 (AASHTO #3) STONE 3A $18.32 $15.71
7391 (AASHTO #1) STONE 4 $18.32 $19.72
7392 (AASHTO #10) SCREENING $15.82 $20.37
7394 R-3 ROCK $20.82 $19.72
7393 R-4 ROCK $21.82 $24.86
7395 R-5 ROCK $24.82 call for availablity
7396 R-6 ROCK $24.82 call for availablity
7398 SAND, TYPE A, CONCRETE $32.99 $29.47
MINIMUM DELIVERY/TONS 23 22
NO BIDS:
Newville - 12
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Hempt Bros Inc Pennsy Supply Inc
District 3 Location: NCMB Camp Hill, PA Harrisburg, PA
New Cumberland Maintenance
805 843
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $20.50 $26.42
7387 (AASHTO #57) STONE 2B $19.50 $23.61
7388 STONE 2RC NB NB
7389 (AASHTO #2A) STONE 2A MOD. $16.50 $19.94
7390 (AASHTO #3) STONE 3A $19.50 $19.94
7391 (AASHTO #1) STONE 4 $18.00 $23.32
7392 (AASHTO #10) SCREENING $21.00 $29.76
7394 R-3 ROCK NB $23.32
7393 R-4 ROCK NB $26.56
7395 R-5 ROCK NB call for availablity
7396 R-6 ROCK NB call for availablity
7398 SAND, TYPE A, CONCRETE $28.45 $30.72
MINIMUM DELIVERY/TONS 18 22
NO BIDS:
New Cumb - 13
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Pennsy Supply Inc New Enterprise Stone & Lime Co.
District 3 Location: MTGT Harrisburg, PA New Enterprise, PA
Mt. Gretna Maintenance
843 837
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $23.27 $22.70
7387 (AASHTO #57) STONE 2B $18.86 $19.70
7388 STONE 2RC $15.92 $14.20
7389 (AASHTO #2A) STONE 2A MOD. $16.59 $16.45
7390 (AASHTO #3) STONE 3A $16.59 $19.70
7391 (AASHTO #1) STONE 4 $18.86 $19.70
7392 (AASHTO #10) SCREENING $20.79 $17.20
7394 R-3 ROCK $18.86 $23.71
7393 R-4 ROCK $22.21 $24.71
7395 R-5 ROCK $35.68 $27.20
7396 R-6 ROCK $35.68 $27.20
7398 SAND, TYPE A, CONCRETE NB $30.23
MINIMUM DELIVERY/TONS 22 23
NO BIDS:
Mt Gretna - 14
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Silver Hill Quarry New Enterprise Stone & Lime Co.
District 3 Location: BOWM Div. of H&K Group New Enterprise, PA
Bowmansville Maintenance Skippack, PA
859 837
ITEM DESCRIPTION PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $17.65 $20.64
7387 (AASHTO #57) STONE 2B $14.40 $17.64
7388 STONE 2RC $11.00 $12.14
7389 (AASHTO #2A) STONE 2A MOD. $11.00 $14.39
7390 (AASHTO #3) STONE 3A $14.00 $17.64
7391 (AASHTO #1) STONE 4 $14.00 $17.64
7392 (AASHTO #10) SCREENING $12.00 $15.14
7394 R-3 ROCK $18.50 $20.14
7393 R-4 ROCK $20.50 $21.14
7395 R-5 ROCK $30.00 $23.14
7396 R-6 ROCK $31.00 $23.14
7398 SAND, TYPE A, CONCRETE NB $26.24
MINIMUM DELIVERYTONS 22-23 23
NO BIDS:
Bowmansville - 15
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Glasgow Inc Douglassville Quarry Birdsboro Materials New Enterprise Stone & Lime Highway Materials, Inc
District 4 Location: DVLT Glenside, PA Div. of H&K Group Shippack, PA New Enterprise, PA Flourtown, PA
Devault Maintenance Catanach GLA15A14 Skippack, PA
794 421 6476 837 3249
ITEM DESCRIPTION PRICE PER TON PRICE PER TON PRICE PER TON PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $22.50 $23.00 NB $22.76 $26.20
7387 (AASHTO #57) STONE 2B $19.00 $20.50 NB $19.76 $22.25
7388 STONE 2RC $15.90 $16.00 NB $14.26 $20.75
7389 (AASHTO #2A) STONE 2A MOD. $16.65 $16.00 NB $16.51 $20.75
7390 (AASHTO #3) STONE 3A $18.25 $20.50 NB $19.76 $22.75
7391 (AASHTO #1) STONE 4 $18.25 $20.00 NB $19.76 $22.75
7392 (AASHTO #10) SCREENING $16.65 $18.50 NB $17.26 $25.35
7394 R-3 ROCK $26.50 $23.50 NB $23.63 NB
7393 R-4 ROCK $26.50 $29.50 NB $23.63 NB
7395 R-5 ROCK NB NB $36.00 $27.26 NB
7396 R-6 ROCK NB NB $37.00 $27.26 NB
7398 SAND, TYPE A, CONCRETE NB NB NB $26.43 NB
MINIMUM DELIVERY/TONS 22 22-23 22-23 23 23
NO BIDS:
Devault - 16
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Glasgow, Inc. Douglassville Quarry Birdsboro Materials Highway Materials Inc
District 4 Location: PLYM Glenside, PA Div. of H&K Group Skippack, PA Flourtown, PA
Plymouth Meeting Maintenance McCoy GLA46B14 Skippack, PA
794 421 6476 3249
ITEM DESCRIPTION PRICE PER TON PRICE PER TON PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $22.50 $23.00 NB $22.45
7387 (AASHTO #57) STONE 2B $19.40 $20.50 NB $18.50
7388 STONE 2RC $16.40 $16.00 NB $16.95
7389 (AASHTO #2A) STONE 2A MOD. $17.40 $16.00 NB $16.95
7390 (AASHTO #3) STONE 3A $18.25 $20.50 NB $18.80
7391 (AASHTO #1) STONE 4 $18.25 $20.00 NB $18.80
7392 (AASHTO #10) SCREENING NB $18.50 NB $21.55
7394 R-3 ROCK $26.50 $23.50 NB NB
7393 R-4 ROCK $26.50 $29.50 NB NB
7395 R-5 ROCK NB NB $36.00 NB
7396 R-6 ROCK NB NB $37.00 NB
7398 SAND, TYPE A, CONCRETE NB NB NB NB
MINIMUM DELIVERY/TONS 22 22-23 22-23 23
NO BIDS:
Plymouth Mtg - 17
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Glasgow Inc Plumstead Materials Highway Materials Inc
District 4 Location: TREV Glenside, PA Div. of Naceville Materials Flourtown, PA
Trevose Maintenance Spring House GLA46D14 Doylestown, PA794 6477 3249
ITEM DESCRIPTION PRICE PER TON PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $27.55 $24.50 $26.00
7387 (AASHTO #57) STONE 2B $24.05 $20.70 $21.50
7388 STONE 2RC $21.45 $17.90 $20.15
7389 (AASHTO #2A) STONE 2A MOD. $21.45 $17.90 $20.15
7390 (AASHTO #3) STONE 3A $23.30 $20.50 $21.95
7391 (AASHTO #1) STONE 4 $23.30 $20.50 $21.95
7392 (AASHTO #10) SCREENING NB $21.50 $24.65
7394 R-3 ROCK NB $24.00 NB
7393 R-4 ROCK NB $25.50 NB
7395 R-5 ROCK NB $35.00 NB
7396 R-6 ROCK NB $36.00 NB
7398 SAND, TYPE A, CONCRETE NB NB NB
MINIMUM DELIVERY/TONS 22 22-23 23
NO BIDS:
Trevose - 18
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
Martin Stone Quarries Inc Glasgow Inc Naceville Materials New Enterprise Stone & Lime Co. Highway Materials Inc
District 5 Location: QTWN Bechtelsville, PA Glenside, PA Doylestown, PA New Enterprise, PA Flourtown, PA
Quakertown Maintenance Spring House GLA46D141138 794 1217 837 3249
ITEM DESCRIPTION PRICE PER TON PRICE PER TON PRICE PER TON PRICE PER TON PRICE PER TON
7385 (AASHTO #8) STONE 1B $22.25 $26.80 $21.00 $23.17 $21.55
7387 (AASHTO #57) STONE 2B $18.00 $23.30 $17.20 $20.17 $18.95
7388 STONE 2RC $14.25 $20.70 $14.40 $15.63 $17.70
7389 (AASHTO #2A) STONE 2A MOD. $14.25 $20.70 $14.40 $16.92 $17.70
7390 (AASHTO #3) STONE 3A $16.25 $22.55 $17.00 $20.17 $18.25
7391 (AASHTO #1) STONE 4 $15.50 $22.55 $17.00 $20.17 $18.25
7392 (AASHTO #10) SCREENING $15.25 NB $15.00 $21.67 NB
7394 R-3 ROCK $17.00 NB $20.50 $23.63 $24.15
7393 R-4 ROCK $19.25 NB $22.00 $24.63 $29.15
7395 R-5 ROCK $31.25 NB $34.00 $28.63 $35.15
7396 R-6 ROCK $37.25 NB $35.00 $28.63 $36.15
7398 SAND, TYPE A, CONCRETE $36.25 NB NB NB NB
MINIMUM DELIVERY/TONS 22 22 22-23 23 23
NO BIDS:
Quakertown - 19
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co.
District 5 Location: SLAT New Enterprise, PA
Slatington Maintenance
837
ITEM DESCRIPTION PRICE PER TON
7385 (AASHTO #8) STONE 1B $22.70
7387 (AASHTO #57) STONE 2B $19.70
7388 STONE 2RC $16.95
7389 (AASHTO #2A) STONE 2A MOD. $16.45
7390 (AASHTO #3) STONE 3A $19.70
7391 (AASHTO #1) STONE 4 $19.70
7392 (AASHTO #10) SCREENING $21.20
7394 R-3 ROCK $24.95
7393 R-4 ROCK $25.95
7395 R-5 ROCK $27.95
7396 R-6 ROCK $27.95
7398 SAND, TYPE A, CONCRETE NB
MINIMUM DELIVERY/TONS 23
NO BIDS:
Slatington - 20
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co. Locust Ridge Quarry
District 5 Location: POCN New Enterprise, PA Skippack, PA
Pocono Maintenance
837 823
ITEM DESCRIPTION
7385 (AASHTO #8) STONE 1B $25.28 $21.00
7387 (AASHTO #57) STONE 2B $21.78 $17.00
7388 STONE 2RC $13.28 $14.50
7389 (AASHTO #2A) STONE 2A MOD. $16.28 $14.50
7390 (AASHTO #3) STONE 3A $21.78 $17.00
7391 (AASHTO #1) STONE 4 $21.78 $17.00
7392 (AASHTO #10) SCREENING $15.28 $21.00
7394 R-3 ROCK $23.28 $21.50
7393 R-4 ROCK $24.28 $23.50
7395 R-5 ROCK $26.28 $33.00
7396 R-6 ROCK $26.28 $34.00
7398 SAND, TYPE A, CONCRETE NB NB
MINIMUM DELIVERY/TONS 23 22-23
NO BIDS:
Pocono - 21
PENNSYLVANIA TURNPIKE COMMISSION
TABULATION OF BIDS
Aggregates
Bid Number: 801023-2019
Due: 5/28/2019
New Enterprise Stone & Lime Co.
District 5 Location: WYOM New Enterprise, PA
Wyoming Valley Maintenance
837
ITEM DESCRIPTION
7385 (AASHTO #8) STONE 1B $25.28
7387 (AASHTO #57) STONE 2B $21.78
7388 STONE 2RC $13.28
7389 (AASHTO #2A) STONE 2A MOD. $16.28
7390 (AASHTO #3) STONE 3A $21.78
7391 (AASHTO #1) STONE 4 $21.78
7392 (AASHTO #10) SCREENING $15.28
7394 R-3 ROCK $23.28
7393 R-4 ROCK $24.28
7395 R-5 ROCK $26.28
7396 R-6 ROCK $26.28
7398 SAND, TYPE A, CONCRETE NB
MINIMUM DELIVERY/TONS 23
NO BIDS:
Wyoming Valley - 22