Penny Coombes
Sarah Wharton
Gary Davies
Simon White
River Bee, Desing
FLOOD ALLEVIATION FEASIBILITY
![Page 3: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/3.jpg)
Location
Cardiff
Desing
![Page 4: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/4.jpg)
Introduction• Existing Situation
– Hydrological Data– River Model– Damage Assessment
• Flood Alleviation Proposals– Off-line Storage– On-line options– Economic Appraisal
![Page 5: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/5.jpg)
![Page 6: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/6.jpg)
Hydrology
• Determine relationship between water level and flow
• Predict peak discharges at various return periods
• Provide inflow data during storm periods
![Page 7: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/7.jpg)
Determine relationship
• Existing broad-crested weir
• Rating datah Q m m3/s
0.108 0.2210.109 0.2140.188 0.490.268 0.8710.354 1.3850.357 1.5130.586 3.7210.597 3.64
![Page 8: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/8.jpg)
Determine relationship
• Weir equation
5.1705.1 hCbCQ dv5.1hkCQ f
5.1hC
Qk
f
5.1165.7 hCQ f
![Page 9: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/9.jpg)
0
0.5
1
1.5
2
2.5
3
3.5
4
0.1 0.2 0.3 0.4 0.5 0.6
h (m)
Q (m3/s)
Q given Q formula
![Page 10: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/10.jpg)
Maxima Data
• Maximum river level of each year for previous 25 years
• Use equation to calculate flows
• Use statistical analysis to calculate corresponding return periods
![Page 11: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/11.jpg)
Relationship between peak flow and return period
-catchment characteristics-maxima data
• Region curves using mean annual flood from:
• Extreme value distribution
• Synthetic hydrographs
![Page 12: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/12.jpg)
Extreme Value Distribution
• Linear scale in the form of:
ayuQ
Where u and a are statistical functions based on the maxima data
y is a function of the return period
yQ 646.1166.7
![Page 13: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/13.jpg)
4
5
6
7
8
9
10
11
12
13
14
-2 -1 1 2 3 4
y
Q
(m3 / s)
Q maxima data
Q = u + ay
![Page 14: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/14.jpg)
Region curves
• Maxima data
Mean annual flood = 8.12 m3/s
Relationship between mean annual flood and floods of various return periods
![Page 15: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/15.jpg)
7
12
17
22
27
32
0 2 4 6
y=-ln(-ln(1-1/Tr))
Q (m3 /s)
EVD: Q=u+ay
Maxima dataQbar/Q(T)
CharacteristicsQbar/Q(T)
![Page 16: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/16.jpg)
7
9
11
13
15
17
19
21
23
0 1 2 3 4 5 6 7
y
Q (m3 / s)
![Page 17: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/17.jpg)
Synthetic hydrographs
• No runoff or rainfall data
• Use catchment characteristics to calculate a synthetic hydrograph
• Hydrograph-variation of flow with time
![Page 18: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/18.jpg)
0
10
20
30
40
50
60
0 10 20 30 40 50 60
Time (hours)
Discharge
(m3/s)
2 5 10 25 50 100 200 500 1000
![Page 19: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/19.jpg)
Estimated Maximum Flood
• Not the impossible flood
• Very small probability of being exceeded
• Time to peak reduced by third
• Snowmelt added but not ground-frost
![Page 20: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/20.jpg)
10,000 Year Flood
• Based on region curves
• Estimated to be 10 times the mean annual flood
![Page 21: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/21.jpg)
050
100150200250300
0 5 10 15 20 25 30 35 40
Time (hours)
Q
(m3/s)
synthetic hydrograph EMF adjusted EMF 10,000 year flood
![Page 22: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/22.jpg)
![Page 23: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/23.jpg)
• Cross-sectional data entered
• 5000m long reach modelled
• Data for 2 culverts entered
• Model calibrated using 1990 storm
Creating the HEC-RAS modelDesing
Bee
5000m
3000m
1000m
0m
Reach Plan
Culvert 1
Culvert 2
-120 -100 -80 -60 -40 -20 0 2045
46
47
48
49
50
51
design project Plan 41 Flow: Dam 1 in 500 year eventupstream end of main reach
Station (m)
Elev
atio
n (m
)
Legend
Ground
Bank Sta
Channel cross-section
-120 -100 -80 -60 -40 -20 0 2042
43
44
45
46
47
48RS=3.010 Upstream (Culvert)
Station (m)
Elev
ation
(m)
Legend
Ground
Ineff
Bank Sta
-120 -100 -80 -60 -40 -20 0 2039
40
41
42
43
44
45RS=1.010 Upstream (Culvert)
Station (m)
Elev
atio
n (m
)
Legend
Ground
Ineff
Bank Sta
Culvert 1 (downstream)
Culvert 2 (upstream)
![Page 24: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/24.jpg)
Trial model
47.08
42.78
44.20
41.34
41.91
44.72
45.65
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 1.000 2.000 3.000 4.000 5.000 6.000
Chainage (km)
Ele
vatio
n (m
AO
D)
Series1Recorded level
![Page 25: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/25.jpg)
Trial model
47.08
45.65
44.72
41.91
41.34
44.20
42.78
45.35
41.33
47.30
45.85
44.19
43.02
42.06
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 1.000 2.000 3.000 4.000 5.000 6.000
Chainage (km)
Ele
va
tio
n (
mA
OD
)
Recorded profile HEC-RAS predicted profile
![Page 26: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/26.jpg)
Calibrated model
47.08
45.65
44.72
42.78
44.20
41.34
41.91
47.19
45.71
44.82
44.22
42.91
41.36
41.89
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 1.000 2.000 3.000 4.000 5.000 6.000
Chainage (km)
Ele
va
tio
n (
mA
OD
)
Recorded profile HEC-RAS predicted profile
![Page 27: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/27.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr Bed level
Culvert 1
Culvert 2
![Page 28: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/28.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr Bed level
Culvert 1
Culvert 2
![Page 29: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/29.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr Bed level
Culvert 1
Culvert 2
![Page 30: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/30.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr Bed level
Culvert 1
Culvert 2
![Page 31: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/31.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr Bed level
Culvert 1
Culvert 2
![Page 32: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/32.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr 1 in 100yr Bed level
Culvert 1
Culvert 2
![Page 33: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/33.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr 1 in 100yr1in 200yr Bed level
Culvert 1
Culvert 2
![Page 34: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/34.jpg)
Running the storm events
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr1 in 100yr 1in 200yr Bed level 1 in 500 yr
Culvert 1
Culvert 2
![Page 35: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/35.jpg)
![Page 36: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/36.jpg)
Net Present Value
• Interest Rate - 6%
• Time period - 60 years
• Annuity rate - 16.16
![Page 37: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/37.jpg)
Preliminary Damage EstimateMethod 1• Averaging previous flood damages• NPV = £5.17 million
Method 2• Using Depth/Damage relationship from
previous flood events• NPV = £6.43 million
![Page 38: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/38.jpg)
Depth/Damage Model
• Created as spreadsheet
• Estimates Direct, Tangible Damages
• Based on depth/damage graphs
• Calculates damage every 50m
• 2 sites of 100m x 2km– Residential– Business and Retail
![Page 39: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/39.jpg)
Residential Layout
320 Terrace Houses
(6.25m x 20m)
300 Semi-detached Houses
(10m x 20m)
40 Detached Houses
(15m x 20m)
![Page 40: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/40.jpg)
Business/Retail Layout
4 Offices
(25m x 100m)
Clothing Store
(50m x 160m)
Electrical Store
(20m x 250m)
Household Store
(20m x 400m)Supermarket
(50m x 180m)
![Page 41: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/41.jpg)
NPV - Direct Damages
£0
£500,000
£1,000,000
£1,500,000
£2,000,000
£2,500,000
£3,000,000
£3,500,000
0 2 4 6 8 10
Y=-ln(-ln(1-1/Tr))
NP
V
NPV = £2.91 million
![Page 42: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/42.jpg)
![Page 43: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/43.jpg)
Off-Site Storage
• Purpose - attenuate river flows
• Requirements
• Predominate EquationINFLOW - OUTFLOW = STORAGE• Outlet Devices
• Energy Dissipation
![Page 44: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/44.jpg)
Requirements• Dam must not be overtopped by
PMF/10,000 year flood
• Dam will stop all flooding at 50 year return period
• Water level behind reservoir must not reach 58.0 m AOD
![Page 45: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/45.jpg)
Equation Terms• INPUT - OUTPUT = STORAGE
• INPUT– Hydrograph data– Return periods:
2,5,10,25,50,100,200,500,10 000, PMF
• STORAGE– Contours– Areas– Volumes
![Page 46: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/46.jpg)
OUTPUT
• Bankfull Discharge
• Device 1– Radial Gate– 5.2 m3/s– 4 m x 0.235m
• Device 2– Weir and spillway– For additional discharge– 30m wide
Radial ‘Tainter’ Gate
‘Ogee’ Spillway
00.5
11.5
22.5
33.5
44.5
55.5
66.5
77.5
88.5
99.510
10.511
11.512
12.513
13.514
14.515
15.5
0 10 20 30 40 50 60 70
Time(hrs)
Inflow
Outflow total
MAXIMUM ALLOWABLE DISCHARGE:
5 . 2 m3/S
Inflow, Storage and Outflow from the Storage Structure
![Page 47: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/47.jpg)
Off-site Storage Dam
• 100m wide• Slope of 1 in 2.5• 29m breadth
• Safety Fencing• Up-stream Rip-rap
protection• Down-stream grass
protection
Plan of the storage structure
![Page 48: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/48.jpg)
Energy Dissipation• Create a hydraulic jump• Convert super-critical flow to sub-critical flow• Abrupt drop in level of stilling basin• Dependant on Froude Number, water depth
and step height
Abrupt Drop Energy Dissipator
![Page 49: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/49.jpg)
![Page 50: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/50.jpg)
Existing water levels
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr1 in 100yr 1in 200yr Bed level 1 in 500 yr
Culvert 1
Culvert 2
![Page 51: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/51.jpg)
Widening the culverts
2.5m
3m
![Page 52: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/52.jpg)
Widening the culverts
3.5m
3m
![Page 53: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/53.jpg)
Widening the culverts
3.5m
3.5m
![Page 54: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/54.jpg)
Widening the culverts
3.5m
6.75m
![Page 55: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/55.jpg)
Widening the culverts
Gabions
![Page 56: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/56.jpg)
Without culverts widened
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr1 in 100yr 1in 200yr Bed level 1 in 500 yr
Culvert 1
Culvert 2
![Page 57: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/57.jpg)
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Chainage (km)
Wa
ter
su
rfa
ce
lev
el (
mA
OD
)
1 in 2yr 1 in 5yr 1 in 10yr 1 in 25yr 1 in 50yr
1 in 100yr 1in 200yr Bed level 1 in 500 y
Culvert 1
Culvert 2
With fully widened culverts
![Page 58: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/58.jpg)
Flood wall
1m
No dam1 in 200 year
![Page 59: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/59.jpg)
Flood wall
1m
No dam1 in 500 year
![Page 60: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/60.jpg)
Flood wall
1.2m
No dam1 in 500 year
![Page 61: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/61.jpg)
Flood wall
1m
With dam1 in 500 year
![Page 62: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/62.jpg)
Flood wall
0.5m
With dam1 in 200 year
![Page 63: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/63.jpg)
![Page 64: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/64.jpg)
Economic Appraisal
• 7 different alleviation schemes
• Total cost = Construction Costs + Residual Damages
• Do-nothing option = £2.91m
• Cost/benefit ratios calculated
![Page 65: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/65.jpg)
Scheme A
Widening the Culverts
• Damages prevented < 1 in 2 year flood
• Total Cost = £1.7m
• Cost/benefit = 0.77
![Page 66: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/66.jpg)
Scheme B
Widening the Culverts and 1m Flood Wall
• Damages prevented < 1 in 500 year flood
• Total Cost = £2.13m
• Cost/benefit = 0.96
![Page 67: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/67.jpg)
Scheme C
Widening the Culverts and 1.2m Flood Wall
• Damages prevented 1 in 500 year flood
• Total Cost = £2.42m
• Cost/benefit = 1.1
![Page 68: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/68.jpg)
Scheme D
Dam and Storage Reservoir
• Damages prevented 1 in 50 year flood
• Total Cost = £1.3m
• Cost/benefit = 0.59
![Page 69: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/69.jpg)
Scheme E
Dam and Widening the Culverts
• Damages prevented 1 in 50 year flood
• Total Cost = £1.76m
• Cost/benefit = 0.8
![Page 70: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/70.jpg)
Scheme F
Dam, Widening the Culverts and
1m Flood Wall
• Damages prevented 1 in 500 year flood
• Total Cost = £3m
• Cost/benefit = 1.37
![Page 71: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/71.jpg)
Scheme G
Dam, Widening the Culverts and
0.5m Flood Wall
• Damages prevented < 1 in 500 year flood
• Total Cost = £2.4m
• Cost/benefit = 1.1
![Page 72: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/72.jpg)
Comparison of Schemes
£0
£500,000
£1,000,000
£1,500,000
£2,000,000
£2,500,000
£3,000,000
£3,500,000
- A B C D E F G
To
tal
Co
st
ResidualDamages
ConstructionCosts
![Page 73: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/73.jpg)
Warning Systems
• 4 hour warning £2.55m Damages =12% reduction
• Combined with Scheme E:– Construction Cost £1.57m– Residual Damages £170,000– Total Cost £1.74m
• Cost/benefit = 0.6
![Page 74: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/74.jpg)
![Page 75: Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY](https://reader036.vdocument.in/reader036/viewer/2022070413/5697bfee1a28abf838cb9642/html5/thumbnails/75.jpg)
Conclusion
• Construction of Dam
• Widening of Culverts
• Establish 4 hour warning system
• Total Cost = £1.74m
• Cost effective
• Environmentally sound