performance-based communication and surveillance (pbcs)
DESCRIPTION
Performance-Based Communication and Surveillance (PBCS). Introductory remarks. Presented to:ICAO Asia-Pacific RCP/RSP Workshop (Bangkok , Thailand). By:Tom Kraft [email protected]. Date: 13-14 May 2013. Data link began in APAC – now global. - PowerPoint PPT PresentationTRANSCRIPT
Federal AviationAdministrationPerformance-Based
Communication and Surveillance (PBCS)Introductory remarks
Date: 13-14 May 2013
Presented to: ICAO Asia-Pacific RCP/RSP Workshop (Bangkok, Thailand)
By: Tom [email protected]
APAC RCP/RSP Workshop Intro13-14 May 2013
2Federal AviationAdministration
Data link began in APAC – now globalAir traffic management operations are becoming more
dependent on communication and surveillance capabilities and performances
APAC RCP/RSP Workshop Intro13-14 May 2013
3Federal AviationAdministration
NATRegion EUR
RegionNAM
Region
What is happening up North?
APAC RCP/RSP Workshop Intro13-14 May 2013
4Federal AviationAdministration
Background in the NAT Region
• NAT SPG/43 (2007) – Identified communication service problem needing urgent attention (43/29)
• Special NAT SPG (2007) – Established RCP Task Force (SP2007/6)
• NAT SPG/44 (2008) – Agreed to mandate RCP by 2015 (44/11)
• NAT SPG/46 (2010) – Endorsed GOLD (46/8)
• NAT SPG/47 (2011) – Endorsed NAT PBCS Implementation Plan (47/5)
• NAT SPG/48 (2012) – RCP – RSP Applicability (48/7)
APAC RCP/RSP Workshop Intro13-14 May 2013
5Federal AviationAdministration
NAT PBCS Implementation Plan
• 2015 implementation
• 17 tasks on track
• Key items– PfA for Doc 7030
– Operational authorizations
– Flight plan
– ATC automation
– Post-implementation monitoring
APAC RCP/RSP Workshop Intro13-14 May 2013
6Federal AviationAdministration
Background in the APAC Regions (1 of 2)
• APANPIRG/19 (2008) – Identified communication service problem needing urgent attention (19/24)
• SOCM/1 (2009) – Proposed conclusions for APANPIRG
• APANPIRG/20 (2009)– Acknowledges GOLD (20/31, 20/73 and State letter)
– Organize SOCM/2 (20/32)
– Reduced horizontal separation based on RCP 240 (20/33)
– Identified data link limitations (20/34)
• APANPIRG/21 (2010)– SATVOICE task force (21/27)
– APAC PBN Implementation Plan (21/32 through 21/35, Appendix M)
APAC RCP/RSP Workshop Intro13-14 May 2013
7Federal AviationAdministration
Background in the APAC Regions (2 of 2)
• APANPIRG/22 (2011)– Data link performance monitoring (22/12 through 22/15)
– Organize SOCM/2 (22/20)
– APAC PBN Implementation Plan (22/25 and Appendix G)
• SOCM/2 (2012) – Proposed conclusions for APANPIRG
• APANPIRG/23 (2012)– Increase data link equipage (Not concluded)
– Support MTSAT (23/22)
– Support FANS 1/A over Iridium (23/23)
– Develop Regional PBCS Implementation Plan (Not concluded)
– Organize RCP/RSP Workshop (23/13 and 23/24)
– SATVOICE Guidance Material (23/25)
APAC RCP/RSP Workshop Intro13-14 May 2013
8Federal AviationAdministration
Safety promotion
• Sep 2012 – SAM Data Link Semshop (Lima)• Feb 2013 – EUR-NAT PBCS Workshop (Paris)• Mar 2013 – APAC Data Link Performance
Monitoring Seminar (Bangkok)• May 2013 – RCP/RSP Workshop (Bangkok)
ATMRCPRNP
RSPS
NC
Global harmonization will be essentialto realizing safety in APAC Regions
APAC RCP/RSP Workshop Intro13-14 May 2013
9Federal AviationAdministration
Safety realization• Benefits come from ATM (e.g. reducing separation minima)
• PBN (e.g. RNP) by itself does NOT give you ATM
• PBCS implementation plays important role in ATM– Recognized problem
– Endorsed GOLD
– Endorsed Regional PBCS implementation plan
– Conduct PBCS workshops
– Implement PBCS in the Region
2008 2009 2010 2011 2012 2013 2014 2015
11
22
3NAT Region
APAC Regions
44
5
What is missing?12345
ATMRCPRNP
RSPS
NC
APAC RCP/RSP Workshop Intro13-14 May 2013
10Federal AviationAdministration
RCP/RSP Workshop Aim – Day 1
• Promote PBCS implementation– What is PBCS and what are RCP and RSP
specifications?– What amendments are being proposed for
Annexes 6 and 11, Doc 4444, Doc 8168, and Doc 9869 to include PBCS provisions?
– What guidance material is provided by GOLD?
APAC RCP/RSP Workshop Intro13-14 May 2013
11Federal AviationAdministration
RCP/RSP Workshop Aim – Day 1
• Promote PBCS implementation– How do RCP/RSP specifications relate to C and S
requirements for application of separation minima?
– Why and how does PBCS effectively apply RCP/RSP specifications to ensure safe application of ATM through prescriptive requirements, initial qualification and continued operational safety
– How does post-implementation monitoring, analysis and corrective action improve performance?
APAC RCP/RSP Workshop Intro13-14 May 2013
12Federal AviationAdministration
RCP/RSP Workshop Aim – Day 2
• Promote a timely APANPIRG conclusion to endorse an APAC Regional PBCS Implementation Plan– Develop draft plan– To complement APAC Regional
PBN Implementation Plan– Compatible with the global air navigation planning
and performance-based concepts to ensure effective and harmonized PBCS implementation
ATMRCPRNP
RSPS
NC
APAC RCP/RSP Workshop Intro13-14 May 2013
13Federal AviationAdministration
APAC RCP/RSP Workshop ProgramTime(min)
Session 1 – Understanding RCP/RSP & PBCS Discussion Leader
20 Introductory Remarks Fredric LecatTom Kraft
45 ICAO SARPS – Guidance Paul Radford45 Global Operational Data Link Document (GOLD) Tom Kraft15 Derivation of RCP/RSP specifications Tom Kraft35 Introduction to Performance Based Communication and
Surveillance (PBCS)Paul Radford
30 Qualification of service provision: ANSP and CSP ARINC/SITA30 Qualification of aircraft equipment for certification Jerome Condis15 Operational authorization to use data link Tom Kraft45 Post-Implementation Monitoring Guidance Paul Radford30 Performance monitoring in the Fukuoka FIR Koji Nakaitani20 Interpreting the results Paul Radford10 GOLD Performance Analysis Tool Paul Radford
APAC RCP/RSP Workshop Intro13-14 May 2013
14Federal AviationAdministration
APAC RCP/RSP Workshop Program
Time(min)
Session 2 – Planning for PBCS implemenation in the APAC Region
Discussion Leader
30 State of the data link implementation in the South Pacific
Toby Farmer
15 An overview of NAT PBCS Implementation Plan Tom Kraft
45 General Discussion on APAC PBCS Planning and Implementation
Frederic Lecat,Tom Kraft and Paul Radford
15 Wrap-up/ Summary of outcomes Li Peng and Frederic Lecat
APAC RCP/RSP Workshop Intro13-14 May 2013
15Federal AviationAdministration
APAC RCP/RSP Workshop Intro13-14 May 2013
16Federal AviationAdministration