    PerformancePerformanceEnhancementEnhancement

    Proposal for EPICProposal for EPICVietnamVietnam

    Raymond ChongRaymond ChongOctober 28 2008October 28 2008

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    2/34

    2

    Scope and AimScope and Aim

    EPIC Vietnam is one of theEPIC Vietnam is one of theimportant part in whole EPICimportant part in whole EPIC

    Group familyGroup family

    Customers Jones New YorkCustomers Jones New York( 60% )( 60% )

    Kohls, Costo and NextKohls, Costo and Next

    ( 40% )( 40% )

    Workers 1,500 workersWorkers 1,500 workers

    Quantity 250,000 pcs per monthQuantity 250,000 pcs per month

    Quality Which is EPIC GroupQuality Which is EPIC Group

    tenet for providing service to ourtenet for providing service to our

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    3/34

    3

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    4/34

    4

    Hardware Space (1)Hardware Space (1)

    Fabric in Warehouse / CuttingFabric in Warehouse / Cutting

    DepartmentDepartmentFabric Fabric

    Fabric Relaxation for all StretchFabric Relaxation for all Stretch

    FabricFabric

    Unroll fabric for cutting both rollUnroll fabric for cutting both roll

    end and middle of roll forend and middle of roll for

    shrinkage wash testshrinkage wash testSolution Solution

    Trolleys and Trays can be optionTrolleys and Trays can be option

    for getting more space to relaxfor getting more space to relaxfabricfabric

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    5/34

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    6/34

    6

    Hardware Space (3)Hardware Space (3)

    Finishing and Final Audit ( Unit 2 )Finishing and Final Audit ( Unit 2 )Measuring Garment Measuring Garment

    QC has no space for measuringQC has no space for measuring

    garment and flipping aroundgarment and flipping around

    caused low efficiencycaused low efficiency

    Cannot get the accurateCannot get the accurate

    measurement if garment cannot bemeasurement if garment cannot be

    laying flat on the tablelaying flat on the tableSolution Solution

    Purchase more Plastic Shelf for thePurchase more Plastic Shelf for the

    back log garments after pressingback log garments after pressing

    Create more s ace for lettinCreate more s ace for lettin

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    7/347

    Hardware - LogisticHardware - Logistic Between Unit 1 and Unit 2Between Unit 1 and Unit 2Garment lost, damage ( oil stain,Garment lost, damage ( oil stain,

    dirt mark ) and wastage due todirt mark ) and wastage due totransportation transportation

    Garment lost due to missingGarment lost due to missingcounting in and out from Unit 1 tocounting in and out from Unit 1 toUnit 2Unit 2

    Oil stain and dirt mark causedOil stain and dirt mark caused

    wastagewastageMistake found in Unit 2 which theMistake found in Unit 2 which theproduction is still continuous inproduction is still continuous inUnit 1Unit 1

    Fabric Warehouse should be theFabric Warehouse should be the

    d iH d E i /

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    8/348

    Hardware Equipment /Hardware Equipment /

    Facility (1)Facility (1)

    Textile Pre-Shrink / SpongeTextile Pre-Shrink / Sponge

    MachineMachineStretch Fabric Stretch Fabric

    Comfort for the end consumerComfort for the end consumer

    Popular in the marketPopular in the market

    Fabric Shrinkage is unstable in theFabric Shrinkage is unstable in the

    marketmarket

    Solution Solution

    Fabric Relaxation overnightFabric Relaxation overnight

    Fabric Shrinkage / Wash TestFabric Shrinkage / Wash Test

    Textile Pre-Shrink / SpongeTextile Pre-Shrink / Sponge

    d iH d E i t /

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    9/349

    Hardware Equipment /Hardware Equipment /

    Facility (2)Facility (2)

    Current Sewing MachineCurrent Sewing MachineOld Chinese stated to do good jobOld Chinese stated to do good job

    should have good tools first.should have good tools first.

    Efficiency is low because theEfficiency is low because the

    machines have to be maintenancemachines have to be maintenancealwaysalways

    Some of current sewing machinesSome of current sewing machines

    are too old which are not operatedare too old which are not operatedwellwell

    Have to be fixed / repaired byHave to be fixed / repaired by

    maintenance always caused lowmaintenance always caused low

    efficiencyefficiency

    H d E i /H d E i t /

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    10/3410

    Hardware Equipment /Hardware Equipment /

    Facility (3)Facility (3)

    Drill Hole MachineDrill Hole MachineHelp sewing working to haveHelp sewing working to have

    accuracy accuracy

    By manually folding dart theBy manually folding dart the

    placement is up to the sewingplacement is up to the sewingworker whateverworker whatever

    By the welt pocket placement is upBy the welt pocket placement is up

    to where is the back dartto where is the back dartplacement should beplacement should be

    Drill hole machine should be usedDrill hole machine should be used

    after cutting right away, no need toafter cutting right away, no need to

    have extra work and have accuracyhave extra work and have accuracy

    H d E i /H d E i t /

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    11/3411

    Hardware Equipment /Hardware Equipment /

    Facility (3)Facility (3)

    Needle DetectorNeedle DetectorChild Safety ChildrenwearChild Safety Childrenwear

    Needle detector is the one of mostNeedle detector is the one of most

    important if we have to runimportant if we have to run

    business for childrenwearbusiness for childrenwear

    Next requested to have everyNext requested to have every

    garment ( Test Order ) to begarment ( Test Order ) to be

    passing through the needlepassing through the needledetector without any metal beforedetector without any metal before

    shipmentshipment

    PS : Even the childrenwear fromPS : Even the childrenwear from

    Kohls is asking for passingKohls is asking for passing

    H d T l fH d T l f

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    12/3412

    Hardware Tools fromHardware Tools from

    Buyer (1)Buyer (1) Construction RuleConstruction RuleJones New York has their ownJones New York has their own

    construction rule for garment construction rule for garment Merchandising and CADMerchandising and CAD

    department must have a set ofdepartment must have a set ofcopy which is updatedcopy which is updated

    Better to print the constructionBetter to print the constructionrule to let everyone know aboutrule to let everyone know about

    Translate to Vietnamese and put onTranslate to Vietnamese and put onboard of sewing lineboard of sewing line

    Any updated should be choppedAny updated should be choppedthe date, highlighted and replacethe date, highlighted and replace

    on board for sewing workerson board for sewing workers

    H d T l fH d T l f

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    13/3413

    Hardware Tools fromHardware Tools from

    Buyer (2)Buyer (2) How to Measure ManualHow to Measure ManualCAD department, QC and FinalCAD department, QC and Final

    Audit must have one set which isAudit must have one set which is

    updated updated

    Pattern maker must follow thePattern maker must follow the

    individual manual from differentindividual manual from different

    customer to create patterncustomer to create pattern

    especially waist circum or hip levelespecially waist circum or hip leveletc.etc.

    QC and Final Audit must followQC and Final Audit must follow

    individual Manual when measuringindividual Manual when measuring

    garmentgarment

    H d C tH d C t

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    14/3414

    Hardware CorrectHardware Correct

    GuidanceGuidance Standard of ProcedureStandard of ProcedureQuality Right 1Quality Right 1stst Time Time

    Workers are weak on properWorkers are weak on proper

    mindset, and no correct conceptmindset, and no correct concept

    and appropriate mentalityand appropriate mentality

    Quality Control should followQuality Control should follow

    correct guidance to do their jobcorrect guidance to do their job

    ( not number of piece )( not number of piece )Solution Solution

    Leaders should implant workers forLeaders should implant workers for

    correct concept as alwayscorrect concept as always

    Establish a Standard of ProcedureEstablish a Standard of Procedure

    H d Q liH d Q lit

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    15/3415

    Hardware QualityHardware Quality

    Management SystemManagement System TQM / ISO 9000 / 5-S Principal / 6TQM / ISO 9000 / 5-S Principal / 6

    SigmaSigmaQuality Management System canQuality Management System can

    help housekeeping, enhancehelp housekeeping, enhance

    quality, performance and evenquality, performance and evenself-discipline and self-initiativeself-discipline and self-initiativealsoalsoThough it will be a long process toThough it will be a long process to

    get the system to be certifiedget the system to be certifiedThe first thing we have to do is toThe first thing we have to do is tofine tune/ make better progress offine tune/ make better progress ofour systemour system

    With Quality Management SystemWith Quality Management System

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    16/3416

    S ft Q lit A dS ft Q lit A d

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    17/3417

    Software Quality AwardSoftware Quality Award(1)(1)

    Quality Award ProductivityQuality Award Productivity

    against Qualityagainst QualityEveryone is looking at number ofEveryone is looking at number of

    piece as company set-up thepiece as company set-up the

    Productivity AwardProductivity AwardQuality Control can get ProductivityQuality Control can get Productivity

    Award also which is not right, andAward also which is not right, and

    against whose job natural at allagainst whose job natural at all1,200 pcs output with difficult for1,200 pcs output with difficult for

    repairing or damage garmentrepairing or damage garment

    versus 1,000 pcs without repairingversus 1,000 pcs without repairing

    concept must be implantedconcept must be implanted

    S ft Q lit A dS ft Q lit A d

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    18/3418

    Software Quality AwardSoftware Quality Award(2)(2)

    Quality Award ( continuous )Quality Award ( continuous )Solution Solution

    Suggest to set-up Quality Award toSuggest to set-up Quality Award to

    emerge the importanceemerge the importance

    Award any worker who doing goodAward any worker who doing good

    job without or less return forjob without or less return for

    repairingrepairing

    Billboard the monthly QualityBillboard the monthly QualityAward ( if possible ) to let allAward ( if possible ) to let all

    workers knowworkers know

    Make an announcement and memoMake an announcement and memo

    to let all workers understand howto let all workers understand how

    S ft P i h tS ft P i h t

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    19/3419

    Software PunishmentSoftware PunishmentSchemeScheme

    Punishment SchemePunishment SchemePunish any worker if they didPunish any worker if they did

    many mistakesmany mistakesSet-upSet-up Verbal Warning SystemVerbal Warning System forfor

    certain number of Minor Mistakescertain number of Minor Mistakesreturn for repairing ( E.g. morereturn for repairing ( E.g. morethan 3% )than 3% )

    Set-upSet-up Written Warning SystemWritten Warning System forfor

    Major Mistake occurred causedMajor Mistake occurred causeddamage garment or high wastagedamage garment or high wastage( E.g. only 1 time )( E.g. only 1 time )

    By the end of the year, number ofBy the end of the year, number of

    warnings will count into thewarnings will count into the

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    20/3420

    Software Accuracy (2)Software Accuracy (2)

    Information provide from HKInformation provide from HKmerchandisingmerchandisingQuality Right 1Quality Right 1stst Right is fromRight is from

    accurate informationaccurate information

    HK merchandising should alwaysHK merchandising should always

    be specific when writing e-mailbe specific when writing e-mail

    with details informationwith details information

    Factory always need clear detailsFactory always need clear detailsand instruction to processand instruction to process

    E-mail should be better point byE-mail should be better point by

    point in Bullets and Numbering topoint in Bullets and Numbering to

    rovide clear informationprovide clear information

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    21/3421

    Software Accuracy (2)Software Accuracy (2) Fabric Shrinkage / HandlingFabric Shrinkage / HandlingFabric is the most expensive in aFabric is the most expensive in a

    garmentgarment

    Fabric Department should getFabric Department should get

    involved for fabric inspection wheninvolved for fabric inspection whenshipment is ready from mill notshipment is ready from mill not

    until problem found in factoryuntil problem found in factory

    Factory should pull the roll end andFactory should pull the roll end andmiddle roll of fabric for shrinkagemiddle roll of fabric for shrinkage

    wash testwash test

    Unroll the fabric for relaxationUnroll the fabric for relaxation

    properly without die creaseproperly without die crease

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    22/34

    22

    Software Accuracy (3)Software Accuracy (3) Shrinkage build-in method ( CADShrinkage build-in method ( CAD

    department )department )How build-in shrinkage withoutHow build-in shrinkage without

    distort the fit is an acknowledgedistort the fit is an acknowledge

    Pattern maker used their own wayPattern maker used their own way

    to build-in shrinkage on patternto build-in shrinkage on pattern

    The way is not correct method andThe way is not correct method and

    will be distorted the fit as whatwill be distorted the fit as whatbuyer approvedbuyer approved

    Suggest to use the function in theSuggest to use the function in the

    CAD system provided for build-inCAD system provided for build-in

    the shrinkage based on fabric form,the shrinkage based on fabric form,

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    23/34

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    24/34

    24

    Software Accuracy (5)Software Accuracy (5) Sewing DepartmentSewing DepartmentMarking / Sewing and NotchMarking / Sewing and Notch

    matching is the next step tomatching is the next step toachieve Quality Right 1achieve Quality Right 1stst TimeTime

    Any mis-cut panel should beAny mis-cut panel should bereturned to cutting department toreturned to cutting department tore-cut or re-trim, do not startre-cut or re-trim, do not startsewingsewing

    Marking / Sewing must be accurateMarking / Sewing must be accurateusing the actual pattern with seamusing the actual pattern with seamallowance consistenceallowance consistence

    Sewing must be followed allSewing must be followed all

    notches matching provided fromnotches matching provided from

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    25/34

    25

    Software Accuracy (6)Software Accuracy (6) Washing DepartmentWashing DepartmentShrinkage built-in on pattern andShrinkage built-in on pattern and

    marker is based on approved washmarker is based on approved wash

    standardstandard

    Should conduct Pilot Run ofShould conduct Pilot Run ofwashing before bulk washing towashing before bulk washing to

    see the result is stablesee the result is stable

    Any measurement discrepancy isAny measurement discrepancy isfound should inform CADfound should inform CAD

    department to adjust the patterndepartment to adjust the pattern

    and marker for the following cutand marker for the following cut

    Any dirt mark or oil stain is foundAny dirt mark or oil stain is found

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    26/34

    26

    Software Accuracy (7)Software Accuracy (7) Pilot Run VS ShrinkagePilot Run VS ShrinkagePilot Run has to make sure allPilot Run has to make sure all

    preparation is donepreparation is done

    Used the approval PPS Pattern toUsed the approval PPS Pattern to

    cut the Pilot Run for building incut the Pilot Run for building inshrinkage for bulk is riskyshrinkage for bulk is risky

    Suggest to make 2Suggest to make 2ndnd round if the 1round if the 1stst

    round Pilot Run is too far away onround Pilot Run is too far away onmeasurementmeasurement

    If we have to make a 2If we have to make a 2ndnd round Pilotround Pilot

    Run it has to be doneRun it has to be done

    The orders we have going forwardThe orders we have going forward

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    27/34

    27

    Software Accuracy (8)Software Accuracy (8) Measurement ( Before WashMeasurement ( Before Wash

    Garment )Garment )Due to Group Marker from variousDue to Group Marker from various

    shrinkageshrinkage

    Within 2% for Missy and PetiteWithin 2% for Missy and Petite

    stylestyle

    Within 1% for Women styleWithin 1% for Women style

    Even measurement is perfect, theEven measurement is perfect, thefinal measurement is still variedfinal measurement is still varied

    due Group Markerdue Group Marker

    CAD / Pattern Department mustCAD / Pattern Department must

    rovide the shrinka e atternrovide the shrinka e attern

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    28/34

    28

    Software Efficiency (1)Software Efficiency (1) CAD DepartmentCAD DepartmentPattern Makers should be trainedPattern Makers should be trained

    the same vision for fittingthe same vision for fitting

    requirementrequirement

    Fitting is on the mannequin or liveFitting is on the mannequin or livemodel in 3 dimensions, not flatmodel in 3 dimensions, not flat

    pattern in 2 dimensionspattern in 2 dimensions

    Should not trace the number ofShould not trace the number ofmeasurement as provided as it canmeasurement as provided as it can

    be revised from buyer as always.be revised from buyer as always.

    How to control the fit after PPSHow to control the fit after PPS

    sample is approved, number ofsample is approved, number of

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    29/34

    29

    Software Efficiency (2)Software Efficiency (2) Communication and UpdatedCommunication and Updated

    InformationInformationFace to Face touch-base is veryFace to Face touch-base is very

    importantimportant

    Suggest HK merchandising teamSuggest HK merchandising team

    should visit factory monthly toshould visit factory monthly to

    have more communicationhave more communication

    Suggest daily regular phone callSuggest daily regular phone call( E.g. Skype ) should be need to( E.g. Skype ) should be need to

    clear up any pending issueclear up any pending issue

    Any updated should beAny updated should be

    communicated each other to avoidcommunicated each other to avoid

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    30/34

    30

    Software Efficiency (3)Software Efficiency (3)

    Communication DifficultyCommunication DifficultyDifferent LanguageDifferent Language

    Difficulty of communicationDifficulty of communication

    between leader and local workersbetween leader and local workers

    Message from management cannotMessage from management cannot

    be reached to the bottom due tobe reached to the bottom due to

    different languagedifferent language

    Suggest to have 1 worker or leaderSuggest to have 1 worker or leaderin each sewing line who is familiarin each sewing line who is familiar

    of English for betterof English for better

    communication to avoid confusioncommunication to avoid confusion

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    31/34

    31

    Software Efficiency (4)Software Efficiency (4)

    Communication GapCommunication GapSome error or mistake occurredSome error or mistake occurred

    due to communication problemdue to communication problem

    between departmentsbetween departments

    As leader who should make sureAs leader who should make sure

    the communication to bethe communication to be

    throughout to another departmentthroughout to another department

    to get job well doneto get job well doneBy assumption or guessing is notBy assumption or guessing is not

    the appropriate action as a leaderthe appropriate action as a leader

    To take proactive initiative to leadTo take proactive initiative to lead

    as a leader Training is needas a leader Training is need

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    32/34

    32

    Software Self DisciplineSoftware Self Discipline LeadershipLeadershipMust be theMust be the ParagonParagon for thefor the

    workers how to do the good job inworkers how to do the good job in

    the factory the factory

    Should be responsible to spreadShould be responsible to spreadout the same message fromout the same message from

    management to the bottommanagement to the bottom

    Should take properShould take proper Time andTime andActionAction of corrective action planof corrective action plan

    when management raise up anywhen management raise up any

    issueissue

    Should take note ofShould take note ofTo Do ListTo Do List

  • 8/14/2019 Performance Enhancement Proposal for EPIC Vietnam

    33/34

    33

    Software HeadcountSoftware Headcount Pattern Maker Pattern Maker

    Suggest to have 1 ~ 2 more patternSuggest to have 1 ~ 2 more patternmakers to ease up their workload. Then,makers to ease up their workload. Then,have extra time to train up same eye forhave extra time to train up same eye forfit requirement adoptionfit requirement adoption

    Technical Manager Technical Manager Should have an experienced technicalShould have an experienced technicalperson to oversee the technical aspect /person to oversee the technical aspect /solution. Provide any garmentsolution. Provide any garmentengineering advise for increasing higherengineering advise for increasing higher

    productivity without style changeproductivity without style change Checkpoint QC ( Buttoning )Checkpoint QC ( Buttoning )

    There is only 1 checkpoint QC forThere is only 1 checkpoint QC forbuttoning, and who is only pullingbuttoning, and who is only pullingrandom check onlyrandom check only

    Suggest to have 1 more QC to ensureSuggest to have 1 more QC to ensure