performance feedback

10
Copyright © 2009 First Steps Training & Development, Inc. All rights reserved. 1 Performance FeedBack Plan Follow-Up

Upload: teagan-blevins

Post on 31-Dec-2015

17 views

Category:

Documents


2 download

DESCRIPTION

Performance FeedBack. Plan Follow-Up. Three Tools. Outstanding Above average Average Below average Problem performers Recalcitrant employees. Performance Coaching. Performance Accountability. Performance Compliance. Praise Performance Ask Questions to Understand the Situation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

1

Performance FeedBack

Plan Follow-Up

Page 2: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

2

Three Tools

• Outstanding

• Above average

• Average

• Below average

• Problem performers

• Recalcitrant employees

Performance Coaching

Performance Accountability

Performance Compliance

Page 3: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

3

1. Praise Performance

2. Ask Questions to Understand the Situation

3. Review the Standard

4. Ask for a Solution

5. Get Commitment

Performance Coaching Process

Page 4: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

4

Set the Stage

Facts and Reasons

Get Specifics and Summarize

Performance Accountability

Page 5: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

5

Performance Compliance

Page 6: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

6

A “Truth” about Human Behavior

The behavior you measure is the behavior you get

Page 7: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

7

Opportunity to Perform

Define the Accomplishment

Road Blocks

Performer FeedBack

Undesired Accomplishment

Desired Accomplishment

Performer

Performance Sustaining

Consequences(+)

Performance Defeating

Consequences(-)

Performance Sustaining

Consequences(+)

Performance Defeating

Consequences(-)

Supports Organizational

Goals

Defeats Organizational

Goals

Supports Organizational

Goals

Defeats Organizational

Goals

Performance System Analysis – Basic Components

Accurate Measurement

System A Superior Measurement System

is part of the Opportunity to Perform and is also part of the

FeedBack System

Page 8: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

8

Establishing a Measurement System • Define the outputs

• Determine the area of measurement

• Identify the specific thing or things which will be measured

• Identify specific standard

Page 9: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

9

A Truth About Human Performance

If a person is doing the job right and does not know they are doing the job right they may change their behavior and do the job wrong!

Page 10: Performance FeedBack

Copyright © 2009 First Steps Training & Development, Inc. All rights reserved.

10

For more information, or to schedule a workshop, contact:

Toll Free: (800) 211-0871

www.FirstStepsTraining.com

Performance FeedBack