Perfomance Monitoring Sheet for Enrolment centre
Performance Parameter Target state
1
2 Aadhaar Certified Devices
3
4 Photo copier/ scanner availability 1/centre (or as per contract)
5
6 Backup power availability
7 Display of Aadhaar IEC material
8
9 Operators to Station Ratio10 Supervisor to Centre Ratio >=1
11
12 Suitable Station layout
13
14 Enrollment Data Capture Activity15 Picture Quality of Resident photo
16 Review is done for all residents
17
18 Dcocument Storage process
No
Laptop/Desktop availability for planned sations
1/station;Backup of atleast 1/centre
All biometric devices as per UIDAI standards
Aadhaar client is installed, registered and configured
Each station and backup laptops;New Version installed within 1 month of release
Health of equipments and devices being used at centre
Devices and equipments used are serviced and maintained as per the device manual and guidelines2KVA capacity generator / equivalent battery backup for every five enrolment stations kept in each centre.Artwork, Content and design templates as per UIDAI standards
Appropriate Measures for Electrical Safety at centre
All the wires and electrical equipment are nearly arranged and properly earthed to avoid accidents>= 1 extra Operator for each centre
Enrollment Cente Setup Checklist is maintained at centre
To be filled and signed by EA Supervisor when Enrolment Centre is setupPreferred layout is that the Resident sits at 90 Degrees to Operator; Refer layouts prescribed in Resident Enrolment Process
Document Verification process is followed
For all Document based verifications As per UIDAI standards and guidelines As per UIDAI standards and guidelines
Resident Data Review process is followed
Acknowledgement and Consent related process
Print, sign off , handover and filing done Adherence to UIDAI guidelines of keeping Physical cpies of PoI, PoA, DoB and letter of consent documents
19
20 Regular Data backup Data backup twice a day21 Facility and Crowd management Planned and manageable
Total
Data Transfer and smart sync process
EA must sync client to CIDR once in every 24-48 hours.The Data packets must be transferred to CIDR at the end of day or two days. In difficult to reach areas or due to other constraints, this time may be 4-5 days
List of 21 parameters on which audit will be done. This evaluation is purely objective and scores will be given for each parameter1. Not adhering - 02. Partially adhering - 13. Fully adhering - 2
Evaluation Process:Score Equal to and Above 80% is Green (Good)Score Equal to and Above 70% but below 80 % is considered as Yellow(Needs Improvement)Score Below 70% is considered as Red (Not Satisfactory)
Impact of score on EA empanelment:For renewal of empanelment EA should not be in RedFor upgrade from T1 to T2, an EA should not be in RedFor upgrade from T2 to T3, an EA needs EA needs a GreenFor upgrade from T3 to T4, an EA needs EA needs a Green
Perfomance Monitoring Sheet for Enrolment centre
Remarks Action PointsSelf
Rating
0 0.00%
List of 21 parameters on which audit will be done. This evaluation is purely objective and scores will be given