performer ko meeting nice - 12 th & 13 th september 2013 wp1short presentation
DESCRIPTION
PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation. WP 1 content. PERFORMER concept WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment. WP 1 content. - PowerPoint PPT PresentationTRANSCRIPT
PERFORMER KO MEETINGNICE -12th & 13th September 2013
WP1short presentation
WP 1 content
PERFORMER concept
WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment
WP 1 content
OBJECTIVES : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment
Task 1.1 : Define a comprehensive and coherent framework for the global quality process of performance assessment
Definition of a quality process ensuring the monitoring of building energy consumptions and the achievement of targeted performances (based on commissioning)
Definition of appropriate indicators, characterization of the buildings properties, characterization of « in use » conditions
Task 1.2 : Develop methodologies as well simulation models and tools to assess the in situ intrinsic performance of the buildings envelops
Development of a methodology to assess intrinsic performance of the envelope at the end of the construction during a short period Development of a methodology to assess intrinsic performance of the envelope using long term monitoring during operation phase
Task 1.3 : Develop methodologies to propose a cost optimized measurement assessment plan
Specification for a tool aiming at providing cost-optimized energy performance measurement plan enable to support PERFORMER solutions
Task 1.4 : methodologies for energy management, fault detection and diagnosis Specifications for a set of relevant tools to manage energy consumption and ensure continuity of the performances during the
operation phase Fault detection and diagnosis, performance monitoring, real time management and optimized control, visualization and reporting tools
4
WP 1 content
Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment
WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 months Lead: CSTB
Task / Deliverable Lead Contributors Deliver by
1.1 - Define a PERFORMER quality process that guarantees; Monitoring of all energy consumption in any building Achievement of building energy performance targets
CSTB ECG, UPL, GDF BRE, ASM, DRA CU & CEA
Month 12
1.2 - Specify tools for the measurement of the intrinsic energy performance of building envelopes.
- Subtask 1.2.1 : Quick assessment at the end of the construction phase Subtask leader : CSTB - Subtask 1.2.2 : Long term assessment during the operation phase Subtask leader : SG
CSTB SG, BRE, GDF, UPL, ECG & DRA
15
1. 3 - Define a robust method to identify a cost optimized performance measurement plan & produce specifications for tools to be developed on WP2 that will be applied to pilot buildings.
ECG CSTB, CEA, GDF, BRE & UPL
15
1.4 - Specify methodologies for energy consumption management and ensuring continuity of the performance during the operation phase
- Subtask 1.4.1 : Fault detection and diagnosis functionalities based on expert rules Subtask leader : GDF - Subtask 1.4.2 : Performance monitoring exploiting machine learning techniques Subtask leader : CEA - Subtask 1.4.3 : Real time energy management and optimized control Subtask leader : CU - Subtask 1.4.4 : Visualization and reporting tools Subtask leader : CSTB
CSTB BRE, CEA, CU, GDF & ECG
15
5
WP 1 content
Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment
WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 months Lead: CSTB
Task / Deliverable Lead Contributors Deliver by
1.1 - Define a PERFORMER quality process that guarantees; Monitoring of all energy consumption in any building Achievement of building energy performance targets
CSTB ECG, UPL, GDF BRE, ASM, DRA CU & CEA
Month 12
1.2 - Specify tools for the measurement of the intrinsic energy performance of building envelopes. CSTB 15
- Subtask 1.2.1 : Quick assessment at the end of the construction phase
Subtask leader : CSTB
CSTB SG, BRE, DRA, UPL?
- Subtask 1.2.2 : Long term assessment during the operation phase Subtask leader : SG
SG CSTB, BRE, GDF, ECG UPL?
UPL CSTB CEA CU BRE DRA ECG GDF SG ASM
SIGMA
9 20 7 12 8 6 16 10 10 2 2
Person-months per participant
6
WP 1 content
Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment
WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 months Lead: CSTB
Task / Deliverable Lead Contributors Deliver by
1. 3 - Define a robust method to identify a cost optimized performance measurement plan & produce specifications for tools to be developed on WP2 that will be applied to pilot buildings.
ECG CSTB, CEA, GDF, BRE & UPL?
Month 15
1.4 - Specify methodologies for energy consumption management and ensuring continuity of the performance during the operation phase
CSTB 15
- Subtask 1.4.1 : Fault detection and diagnosis functionalities based on expert rules Subtask leader : GDF
GDF CEA, CU, CSTB, UPL, GDF & ECG
- Subtask 1.4.2 : Performance monitoring exploiting machine learning techniques Subtask leader : CEA
CEA CEA, ?
- Subtask 1.4.3 : Real time energy management and optimized control Subtask leader : CU
CU CU, CSTB?
- Subtask 1.4.4 : Visualization and reporting tools Subtask leader : CSTB
CSTB CU, GDF & ECG, UPL?
UPL CSTB CEA CU BRE DRA ECG GDF SG ASM
SIGMA
9 20 7 12 8 6 16 10 10 2 2
Person-months per participant
7
Dependencies & Dependents for WP1
WP1/WP2 A high level of interaction is required in order to ensure the transfer
of the methodologies to WP2 Proposition to provide intermediate deliverables for WP2
WP1/WP3&4 WP1 has to support WP3 for the deployment of the PERFORMER
methodologies on demonstrators(indicators for perfromance assessment, characterization of the building and « in
use » conditions and occupant’s behavior)
WP1/WP5 WP1 has to provide relevant inputs for WP5, in particular general
principles replicable for the development of a business model for the exploitation of the PERFORMER solution
Intermediate deliverable for WP2
For the first 6 months, main stakes are :
Task 1.1 (Global Framework - T0 ->T0+12) : Interact with WP3 in order to ensure the consistency
with PERFORMER demonstrators Ensure to provide a « european view » required for a
replication strategy (WP5) Fist step : All participants send to CSTB contribution
about state of art
Task 1.2 (Intrinsic performance - T0 –> T0+15) : Develop the 2 PERFORMER methodologies for intrinsic
performance assessment Identify the way of validation (in situ experimentation
and/or mockup)
Task 1.3&1.4 (Cost optimized measurement plan and energy consumption management - T0+5 –> T0+15)
Set up dedicated work team for the 4 subtasks, Identify the PERFORMER scientific methods (state of art
required) Identify the better way of interaction with WP2 to transfer
the methodologies developped
WP1 implementation plan for first 6 months
Asking for 3 months more in order to reinforce the link with WP2?
Interaction with other WPs: WP1/WP2 : asking for 3 months more for tasks 1.2,1.3&1.4 in order to reinforce the link with WP2
CSTB offers its services to all players in the construction sector to improve the quality and safety of buildings.