PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018) Page 1 DRAFT 0 TUESDAY, JULY 24 1. WELCOME, INTRODUCTIONS & ROLL CALL Welcome, Introductions and Roll Call SC-4 Chair Mark Bowman opened the meeting about 8:00 AM and provided opening remarks, including “Message from the Chair” (Mystic Pizza reference to quality). Officers were introduced: Mark Bowman – Chair Kenn Miller – Vice Chair Mitch Staskiewicz – Secretary Tammy Womack – Alternate Secretary The Chair then started introductions around the room – name, affiliation, whether SC-4 member or guest. Special Memorial Presentation – Robert Fletcher SC-4 Officer Rotation: Kevin Littrell will assume Alternate Secretary positions IEEE General Data Privacy Requirements (GDPR) Policy – adherence to privacy of personal information; collect only what you need and nothing more; if you obtain unneeded personal information, delete it; e-mail transmittals, etc. to follow new privacy protocols. ROLL CALL/QUORUM: Of the 34 voting Members (and 21 Corresponding Members) on the SC-4 Roster, 27 Members were present. Therefore, a quorum of 50% or more was present. MEETING ATTENDEES: There were thirty-eight (38) attendees consisting of twenty-seven (27) members, and eleven (11) guests, including four (4) international attendees. Membership Update, Changes, and Assignments No new members added, and five (5) removed. Roy Lyon was moved to corresponding membership based on his request Duane Brock was moved to corresponding membership based on his request Mell Hess was removed from membership based on his request Steve Hutchins was removed from membership based on his request Bob Fletcher was removed from membership (deceased) 2. S18-02 AGENDA & S18-01 MEETING MINUTES S18-02 Meeting Agenda was reviewed and approved (motion to approve by John Disosway; second by Kenn Miller) S18-01 Meeting Minutes were reviewed and approved (motion to approve by Jason Bellamy; second by Ken Netzel) 3. GENERAL ANNOUNCEMENTS

Upload: others

Post on 08-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

Page 1

DRAFT 0 TUESDAY, JULY 24

1. WELCOME, INTRODUCTIONS & ROLL CALL Welcome, Introductions and Roll Call

SC-4 Chair Mark Bowman opened the meeting about 8:00 AM and provided opening remarks, including “Message from the Chair” (Mystic Pizza reference to quality).

Officers were introduced: Mark Bowman – Chair Kenn Miller – Vice Chair Mitch Staskiewicz – Secretary Tammy Womack – Alternate Secretary

The Chair then started introductions around the room – name, affiliation, whether SC-4 member or guest.

Special Memorial Presentation – Robert Fletcher

SC-4 Officer Rotation: Kevin Littrell will assume Alternate Secretary positions

IEEE General Data Privacy Requirements (GDPR) Policy – adherence to privacy of personal information; collect only what you need and nothing more; if you obtain unneeded personal information, delete it; e-mail transmittals, etc. to follow new privacy protocols.

ROLL CALL/QUORUM: Of the 34 voting Members (and 21 Corresponding Members) on the SC-4 Roster, 27 Members were present. Therefore, a quorum of 50% or more was present.

MEETING ATTENDEES: There were thirty-eight (38) attendees consisting of twenty-seven (27) members, and eleven (11) guests, including four (4) international attendees.

Membership Update, Changes, and Assignments

No new members added, and five (5) removed.

Roy Lyon was moved to corresponding membership based on his request Duane Brock was moved to corresponding membership based on his request Mell Hess was removed from membership based on his request Steve Hutchins was removed from membership based on his request Bob Fletcher was removed from membership (deceased)

2. S18-02 AGENDA & S18-01 MEETING MINUTES

S18-02 Meeting Agenda was reviewed and approved (motion to approve by John Disosway; second by Kenn Miller)

S18-01 Meeting Minutes were reviewed and approved (motion to approve by Jason Bellamy; second by Ken Netzel)

3. GENERAL ANNOUNCEMENTS

Page 2: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

Page 2

The Chair provided general discussion on several items. Participants, patents, and duty to inform slides were reviewed. Chair presentation is attached to the meeting minutes.

Recognition of corporate sponsors PSStech and ETAP; sponsors were acknowledged for their contribution to the development of quality standards for the nuclear industry.

4. WEBSITE REVIEW – SC-4 & Working Groups

Nader Eldeiry developed contemporary look for SC-4 website, which was previewed during the meeting (Nader to publish the new website). Updated attendance sheet to be provided to Nader by Mitch (Secretary). Working Group Chairs required to submit agendas, meeting minutes and members for publication to the website.

5. FINANCIAL REPORT / ALLIGATOR FUND

18-01 NPEC SC-4 Financial Report

18-01 BEGINNING BALANCE $4,077.69 18-01 Member Meeting Fees Received $680.00 18-01 Meeting Expenses Paid -$1,031.10 18-01 CLOSING BALANCE $3,726.59

6. Summary of NPEC/ADCOM Activities & NPEC/ADCOM Areas of Interest PARs approved by ADCOM for P308, P741 and P765. Directions from NPEC to SC-4 Chair to “think globally” was reviewed (see Chair presentation,

attached); Tom Koshy provided additional overview and information. “Power Systems Simulation Guidance for NPGS” Task Force was established – Tom Koshy selected as

Chair for this task force. o Task force to determine scope & identify issues to be addressed; Mission of this group is to determine the boundaries for guidance for the power system, emergency diesel generators, and islanding mode. Initial outline for topics to be considered and prioritized include: Modeling Detail; Reporting Detail; Recommended Studies; Operating Experience; Recommended Scenarios; Recommended Alignments; Reporting; Analytical Techniques). Task force members: Tom Koshy (Chair)

Yoon Kim Gene Polleto Jeff Weibelt

Ken Fleisher Greg Reimers Tammy Womack

Joe Krvavak Neal Simmons

Tim Lensmire Shawn Simon

Page 3: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

Page 3

During the next working group meeting, there will be a discussion for the need of a new working group, new guide, etc.

NEXT MEETING: S19-01 will be in Charlotte, NC with NPEC

7. REVIEW OF WORKKING GROUP ACTIVITIES (Chair Reports and Standards Status Report)

See standard status (attached) for standard activities for ADCOM/REVCOM

Working Group 4.1 (Std. 308) – John Disosway (for Bob Fletcher) Roster on website to be reviewed/updated PAR (as-is) submitted to ADCOM … outstanding … moving forward with Ballot; looking 19-01 WG meeting requirement – Yes, 3 hours

Working Group 4.2.1 (Std. 387) – Ken Fleisher Roster is up to date on website Standard just approved (2017) … no new PARs; possible annex for recommended practices 19-01 WG meeting requirement – Yes, 30 minutes

Working Group 4.2.2 (Std. P2420) – Gene Polleto Roster is up to date on website Anticipated SC-4 Preview at S19-01 19-01 WG meeting requirement – Yes, 2 hours

Working Group 4.3 (Std. 317) – Mitch Staskiewicz • Roster on website to be reviewed/updated• PAR (as-is) submitted to ADCOM at 19-01 meeting• 19-01 WG meeting requirement – Yes, 1 hour

Working Group 4.4 (Std. 1290) – Bruce Lord Roster is up to date on website Initiate PAR discussion at 19-01 meeting 19-01 WG meeting requirement – Yes, 1 hour

Working Group 4.5 (Std. 690) – Robert Konnik Roster on website to be reviewed/updated In re-ballot stage as of 18-02 19-01 WG meeting requirement – Yes, 1 hour

Working Group 4.6 (Std. 765, 1792) – Tamatha Womack Roster is up to date on website PAR (765 for Open Phase) approved by ADCOM 19-01 WG meeting requirement – Yes, 4 hours

Page 4: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

Page 4

Working Group 4.7 (Std. 741) – Mark Bowman Roster is up to date on website; changes will be submitted to Nader PAR (741 for Open Phase) approved by ADCOM 19-01 WG meeting requirement – Yes, 3 hours

Working Group 4.8 (Std. 833) – Keith Bush Roster is to be updated on website PAR submittal to ADCOM expected 19-01 19-01 WG meeting requirement – Yes, 2 hours

Working Group 4.9 (Std. 628) – Kevin Littrell Roster updates for website already submitted to Nader Anticipated Preview at 19-02 19-01 WG meeting requirement – Yes, 2 hours

8. INDUSTRY REPORTS

NEI Report

No NEI update was provided.

NRC Report

Kenn Miller provided the NRC update, which is attached to these meeting minutes; additional information available on NRC website. Singh Matharu provided additional updates (no written report – verbal only).

INPO Report

Shawn Simon provided the INPO update (no written report, verbal only). Overview of Industry performance, component level issues, preferred off-site power, Safety, etc.

9. REVIEW SC-4 ACTION ITEMS

Action Items were reviewed, changes were made, and the updated SC-4 Action Items are attached to these meeting minutes.

10. GENERAL TOPICS

Call for Next Meeting Presentations Members should consider presentation topics that would be of interest to SC-4 members and send information on potential presentations to the SC-4 Chair, Secretary or other officer.

Add to S19-01 Agenda: TBD per ideas below SC-4 Standards Feature Presentations – Working Group 4.7 Chair, Mark Bowman, to provide a

presentation related to the historical perspective on the use of the 741 standard.

Page 5: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

Page 5

Presentation Ideas: o Islanding Mode Issues (Tom Koshy) PRESENTATION 1 o MSPI – Emergency Performance Update (Jim Sharky) PRESENTATION 2 o OPC Regulatory Perspective (Singh Matharu) PRESENTATION 3 o LTC Transformer Application (Joe Krvavac) PRESENTATION 4

11. PRESENTATIONS

The following presentations were made during the meeting.

PRESENTER TOPIC

Shinji Kawanago DC Charger Behavior Keith Bush In-Place Generator Rewind at Diablo Canyon Neal Simmons Auto-Transformer Failure

These presentations are posted on the SC-4 website and are attached to these meeting minutes.

12. OE REVIEW – Significant Operating Experience (OE) Since Last Meeting

Members took part in a roundtable discussion of recent operating experience.

13. CLOSING REMARKS

Chair Mark Bowman provided closing remarks and adjourned the meeting at approximately 5:00 PM. (motion by Gene Poletto; second by Ken Fleischer)

Submitted by: Mitch Staskiewicz, SC-4 Secretary

ATTACHMENTS: 1 S18-02 SC-4 Meeting Agenda 2 SC-4 Chair Presentation 3 Membership and Attendance List 4 Standards Status Spreadsheet 5 Action Items 6 NRC Liaison Report 7 Presentation: DC Charger Behavior (Shinji Kawanago) 8 Presentation: In-Place Generator Rewind at Diablo Canyon (Keith Bush) 9 Presentation: Transmission Systems Issue (Neal Simmons)

Page 6: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

1 S18-02

SC-4 MEETING AGENDA

Page 7: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

SCHEDULE: S18-02, Mystic, CT

Page 1 SC-4 S18-02 Meeting Agenda REV 2 2018-07-20.docx

SC-4 KICK-OFF MEETING: Monday, July 23, 2018 Time

1. Welcome and Introductions 8:00 – 8:15

2. Housekeeping Items 8:15 – 8:25

3. IEEE Legal Issue (review) 8:25 – 8:30

4. Working Group Meeting Schedules 8:30 – 8:45

5. Closing Remarks 8:45 – 9:00

Note: All Working Group Chairs are expected to attend the Monday Kick-Off Meeting

WORKING GROUP MEETINGS: Monday, July 23, 2018 Room & Time

Working Group Standards WG Chair Time Needed

SC-4 Room 1

SC-4Room 2

4.1 – Class 1E Power Systems Standard 308 Bob Fletcher 30 min 1:00-1:30

4.2.1 – Standby Power Supply (Diesel Generators) Standard 387 Ken

Fleischer 30 min 9:00-9:30

4.2.2 – Standby Power Supply (Combustion Turbine Generators)

Standard P2420 Gene Poletto 2 hrs 10:00-12:00

4.3 – Electric Penetration Assemblies Standard 317 Mitch

Staskiewicz 1 hr 1:00-2:00

4.4 – MOV Motor Application, Protection, Control & Testing

Standard 1290 Bruce Lord 30 min 1:30-2:00

4.5 – Cable Systems Standard 690 Robert Konnik 3 hrs 2:00-5:00

4.6 – Preferred Power Supply Standards 765, 1792 Tamatha Womack 1 hr 9:00-10:00

4.7 – Protection of Class 1E Power Systems Standard 741 Mark

Bowman 1 hr 2:00-3:00

4.8 – Protection of Electric Equipment from Water Hazards

Standard 833 Keith Bush 2 hr 3:00-5:00

4.9 – Raceway Systems Standard 628 Kevin Littrell 30 min 9:30-10:00

Open-Phase Discussion Group (WGs 4.1, 4.6, 4.7)

Discuss potential impact to standards All 2 hr 10:00-12:00

Page 8: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

SCHEDULE: S18-02, Mystic, CT

Page 2 SC-4 S18-02 Meeting Agenda REV 2 2018-07-20.docx

SC-4 MEETING AGENDA: Tuesday, July 24, 2018 Time Speaker

1. Welcome and Introductions 8:00 – 8:15 Chair

2. Membership Update, Changes, and Assignments 8:15 – 8:30 Chair

3. Roll Call / Establish Quorum 8:30 – 8:40 Secretary

4. Approve Agenda & S18-01 Minutes 8:40 – 8:50 Secretary

5. General Announcements 8:50 – 9:00 Chair

6. Website Status (SC info review, WG info review) 9:00 – 9:10 Nader Eldeiry

7. Financial Report / Alligator Fund 9:10 – 9:15 Secretary

8. Summary of NPEC Activities & NPEC Areas of Interest 9:15 – 9:30 Chair

BREAK 9:30 – 10:00

9. Working Group Chair Reports (WG Status / Standards Status Report / Action Items)

Working Group 4.1 Working Group 4.2.1 Working Group 4.4.2 Working Group 4.3 Working Group 4.4 Working Group 4.5 Working Group 4.6 Working Group 4.7 Working Group 4.8 Working Group 4.9

10:00 – 11:15

Bob Fletcher Ken Fleischer Gene Poletto Mitch Staskiewicz Bruce Lord Robert Konnik Tamatha Womack Mark Bowman Keith Bush Kevin Littrell

10. Industry Reports: NRC Areas of Interest INPO Areas of Interest 11:15 –11:45

Kenn MillerShawn Simon

11. Review SC-4 Action Items 11:45 – 12:00 Secretary

LUNCH 12:00-1:00

12. Presentation: DC Charger Behavior 1:00 – 1:40 Shinji Kawanago

13. Presentation: In-Place Generator Rewind (Diablo Canyon) 1:30 – 2:20 Keith Bush

14. Presentation: Transmission Systems Issue 2:20 – 3:00 Neal Simmons

BREAK 3:00 – 3:30

15. OE Review – Significant OE since last meeting 3:30 – 4:45 SC-4 Members

16. Closing Remarks Open Discussion for 19-01 Meeting: Choose Standard Overview; Ideas for Future Presentations; Topics for Future Agenda

4:45 – 5:00 Chair

ADJOURNMENT 5:00

Page 9: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

2 SC-4 CHAIR

PRESENTATION (OUTLINE & IEEE PATENT SLIDES)

Page 10: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

SC‐4 Auxiliary Power Subcommittee Meeting

S18‐02Mystic

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Page 11: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Message from the Chair

Page 12: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

1. Introductions• Name• Affiliation• SC‐4 Member or Guest• WG Memberships

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Page 13: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Robert J. Fletcher12/31/1958 – 7/11/2018

Husband and father of three Grandfather of four Fair golfer (but loved the sport) Die hard St. Louis Cardinal and Minnesota Viking fan Member of Institute of Electrical & Electronics Engineers (IEEE) Past Chair of IEEE Stationary Battery Committee Working Group Chair for IEEE 485 – Lead Acid Battery Sizing and Selection Member of IEEE/Power Engineering Society’s  Nuclear Power Engineering Committee Member of Sub Committee 4 (Auxiliary Power) of the Nuclear Power Engineering Committee Working Group Chair for IEEE 308 ‐ IEEE Standard Criteria for Class 1E Power Systems Great friend and colleague for over 30 years

Page 14: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Robert J. Fletcher (12/31/1958 – 7/11/2018)

• BSEE – Power Systems from North Dakota State University 1981

• Bechtel (1981 – 1988) at San Onofre, Calloway and Plant Vogtle

• Impell / Vectra / Duke Engineering (1988 – 2004)• Performance Power Services & Independent consultant (2004 ‐ 2018)

• Extensive background in DC system analysis and design and was recognized as an industry leader

• Developed a DC battery sizing and voltage drop program (DCSDM)

Page 15: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

2. Membership Update/Changes• New Members

• None• Members Removed

• Duane Brock (moving to Corresponding)• Delinquent Members

• None• New WG Recruits

• Hector Leon (STP)  Brad Miller (Entergy – ANO)• Audrey Baricko (PSEG ) David Pederson (Duke)• Jin Hwi Park, KEPCO E&C Michael Sykes, Southern Nuclear• Scott Sweat, Westinghouse

• Officer Rotation for 19‐01

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Page 16: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

2. IEEE GPDR Policy• Public Information (including meetings):

• Name, Affiliation, Email (only)

• Private Information:• Phone Numbers, Physical Addresses, etc.

• Any private information must be password protected (e.g. the SC‐4 website) and shall not be passed around in meetings, emailed, or given to the public.

• All SC‐4 Members: review your private information stored on the SC‐4 website and send changes to SC‐4 secretary.

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Page 17: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

5. General Announcements• IEEE‐SA Patent Disclaimer Slides• NPEC Attendance Count

Page 18: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Page 19: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

8. NPEC/ADCOM Items of Interest• PARs approved by ADCOM for P308, P741, P765• Direction from NPEC Chair for SC‐4 to:“Think globally and create a standard for power system simulation for nuclear plants. Add features to address EDG Loading, offsite power loading and voltage adequacy, degraded voltage, open‐phase protection, etc.”

Page 20: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

8. NPEC/ADCOM Items of Interest• Next meetings:

• 19‐01 Charlotte• 19‐02 TBD

Page 21: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

9. Working Group Chair Reports• WG Status / Outstanding Issues• WG Roster up‐to‐date on Website?

• Officers (Chair and Secretary required)• Membership Needs (balance? right people?)

• Standards Status Report Update• Next Meeting Plans (Yes/No, Length)

Nuclear Power Engineering CommitteeAuxiliary Power Subcommittee (SC-4)

Page 22: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

15 March 2015

The IEEE-SA strongly recommends that at each WG meeting the chair or a designee:

• Show slides #1 through #4 of this presentation • Advise the WG attendees that:

• The IEEE’s patent policy is described in Clause 6 of the IEEE-SA Standards Board Bylaws; • Early identification of patent claims which may be essential for the use of standards under

development is strongly encouraged; • There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the

IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development.

• Instruct the WG Secretary to record in the minutes of the relevant WG meeting:

• That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown;

• That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard

• Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom.

• The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance.

• It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual 6.3.5 and in FAQs 14 and 15 on inclusion of potential Essential Patent Claims by incorporation or by reference.

Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR

approved by the IEEE-SA Standards Board.

Instructions for the WG Chair

(Optional to be shown)

Page 23: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

15 March 2015

Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy.

• Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]:

• “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents

• “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents)

• The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group

• Early identification of holders of potential Essential Patent Claims is strongly encouraged

• No duty to perform a patent search

Slide #1

Page 24: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

15 March 2015

Patent Related Links

All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development.

Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws http://standards.ieee.org/develop/policies/bylaws/sect6-7.html#6 IEEE-SA Standards Board Operations Manual http://standards.ieee.org/develop/policies/opman/sect6.html#6.3

Material about the patent policy is available at http://standards.ieee.org/about/sasb/patcom/materials.html

Slide #2

If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at [email protected] or visit http://standards.ieee.org/about/sasb/patcom/index.html

This slide set is available at

https://development.standards.ieee.org/myproject/Public/mytools/mob/slideset.ppt

Page 25: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

15 March 2015

Call for Potentially Essential Patents

• If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance:

• Either speak up now or

• Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or

• Cause an LOA to be submitted

Slide #3

Page 26: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

15 March 2015

Other Guidelines for IEEE WG Meetings

• All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws.

• Don’t discuss the interpretation, validity, or essentiality of patents/patent claims.

• Don’t discuss specific license rates, terms, or conditions.

• Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings.

• Technical considerations remain primary focus

• Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets.

• Don’t discuss the status or substance of ongoing or threatened litigation.

• Don’t be silent if inappropriate topics are discussed … do formally object. ---------------------------------------------------------------

See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for

more details.

Slide #4

Page 27: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

3 MEMBERSHIP AND

ATTENDANCE

Page 28: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

First Last Attendance1 Elnora Balser A

2 Jason Bellamy Y

3 Mark Bowman Y

4 Keith Bush Y

5 Rich Casalaina A

6 John Disosway Y

7 Nader Eldeiry A

8 Ken Fleischer Y

9 Dale Goodney A

10 Evans Heacock Y

11 Mel Hess A

12 Steve Hutchins A

13 Ayodele Ishola-Salawu A

14 Shinji Kawanago Y

15 Yoon Kim Y

16 Robert Konnik Y

17 Tom Koshy Y

18 Edvin Kozo Y

19 Joe Krvavac Y

20 Harvey Leake A

21 Jinsuk "Jay" Lee Y

22 Tim Lensmire Y

23 Kevin Littrell Y

24 Bruce Lord Y

25 Tania Martinez Navedo A

26 Singh Matharu Y

27 Kenn Miller Y

28 John Minley Y

29 Ken Netzel Y

30 Gene Poletto Y

31 Gregg Reimers Y

32 Shawn Simon Y

33 Tom Solinsky A

34 Mitch Staskiewicz Y

35 Hideki Tanaka Y

36 Sudhir Thakur A

37 Jeff Weibelt Y

38 Tammy Womack Y

Totals 27

Absent A

Present Y

Page 29: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

4 SC-4 ACTION ITEMS

Page 30: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

ATTACHMENT 4

SC-4 ACTION ITEMS

ITEM ASSIGNED MEETING ENTERED

DUE ACTION STATUS

584 Website Coordinator

S16-01 S19-01 Review workgroup mandatory meeting requirements and initiate updates to SC-4 website.

WG P&P Manual, NPEC O&P Manual, and NPEC P&P Manual add to the website by 19-01.

585 Chair S16-01 S19-01 Solicit SC-4 Working Groups for consideration of annual PES Working Group Recognition Award. SC-4 then nominates to NPEC.

In progress

588 Tom Koshy S18-01 S19-01 Provide the draft of efforts that address challenges involving Islanding Mode and additional guidance for modeling and simulation

589 John Disosway

S18-01 S19-01 Review SC-4 OPS Manual and recommend revisions in order to eliminate any duplication or conflict with NPEC P&P Manual and NPEC O&P Manual

Cutting out duplication with upper tier documents, only alternate secretary position and list of WG standards concerns, if any. Will bring proposed change at 19-01 meeting

590 Nader Eldeiry S18-02 S19-01 Publish new website. Ensure the personal identification information is password protected.

591 Tom Koshy S18-02 S19-01 Task force for Power System Simulation Guidance for NPGS formed. Task #1: Determine the purpose and scope of a potential Guide or Recommended Practice in this area. Task #2: Determine topics (clauses) to be considered and prioritized (Suggestions: Modeling Detail; Reporting Detail; Recommended Studies; Operating Experience; Recommended Scenarios; Recommended Alignments; Reporting; Analytical Techniques). 

592 SC-4 Chair S18-02 S18-02 Chair to poll ADCOM for additional standards to prioritize endorsement by NRC.

The following standards were chosen as priority from SC-4: 741-2017, 387-2017.

Page 31: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

ITEM ASSIGNED MEETING ENTERED

DUE ACTION STATUS

593 SC-4 Chair S18-02 S19-01 Communicate need of NPEC Letter from SC-4 to state the value (specifics e.g., DVR standard alleviates regulation by inspection, etc.) of NRC endorsement and give priority to selective standards

Awaiting additional information from NPEC or other NPEC committees.

  

Page 32: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

5 SC-4

STANDARDS STATUS

Page 33: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

STANDARDSTD

YEARSTD

EXPIREREAFFIR- MATION

PAR EXPIRES

TITLE WG WG CHAIRCYCLE YEAR

N18-1N18-2

N19-1N19-2

STATUS & NOTES

308 2012 2022IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations

4.1 J. Disosway 618-01: PAR (as-is) submitted to ADCOM18-02: Proceed to ballot, anticipated complete 19-01

387 2017 2027IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations

4.2.1 K. Fleischer 1Standard just approved

P2420 (new) Dec-2019IEEE Standard Criteria for Combustion Turbine Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations

4.2.2 G. Poletto N/A PreviewPAR approved March 2015.Anticipated SC-4 preview 19-01

317 2013 2023IEEE Standard for Electric Penetration Assemblies in Containment Structures for Nuclear Power Generating Stations

4.3 M. Staskiewicz 518-02: PAR (as-is) submitted to ADCOM

1290 2015 2025Guide for MOV Motor Application, Protection, Control and Testing in Nuclear Generating Stations 4.4 B. Lord 3

Initiate PAR discussion 19-01

690 2004 2018 Dec-2018IEEE Standard for the Design and Installation of Cable Systems for Class 1E Circutis in Nuclear Power Generating Stations

4.5 R. Konnik 10Balloting process.Working on comment resolution. 18-02 To be re-circ ballotedPlan to submit to revcom fall 2018

765 2012 2022 Dec-2022Standard for Preferred Power Supply for Nuclear Power Plants

4.6 T. Womack 6PAR to update content and consider open phase was accepted by standards board 3/8/18

1792 2017 2027Recommended Practices for Nuclear Power Plant Offsite Power Circuits Reliability

4.6 T. Womack 1Standard just issued - no activity

741 2017 2027IEEE Standard Criteria for the Protection of Class 1E Power Systems and Equipment in Nuclear Power Generating Stations

4.7 M. Bowman 1PAR to update content and consider open phase was accepted by standards board

833 2005 2021 2011IEEE Recommended Practice for the Protection of Electric Equipment in Nuclear Power Generating Stations from Water Hazards

4.8 K. Bush 719-01: PAR initiatied

628 2011 2021 Dec-2021IEEE Standard Criteria for the Design, Installation, and Qualification of Raceway 4.9 K. Littrell 7 Preview

Anticipated preview 19-02

Color Code ;Document 0 to 2 years old 3Document 3 years old 1Document 4 Years old 0Document 5 - 7 years old 4Document 8 or more years old 1

9

Page 34: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

6 NRC LIAISON REPORT

Page 35: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

NRC Liaison Report - IEEE PES NPEC 18-02 Annie Caputo and David A. Wright, nominated by President Trump and confirmed by the United States Senate, were sworn in as NRC Commissioners in May 2018. The NRC Commission is now fully-staffed with 5 members. 1. Operating Reactors

a. Turkey Point Subsequent License Renewal (SLR) Application was submitted January 2018 and accepted for review on 5/2/18. Letters of intent for SLR Applications have been received from Peach Bottom, Surry, and North Anna. b. TSTF-505 updated traveler and SE template are expected to be published in the next coming months.

i. Battery TS LCO implementation – LCO 3.8.4 c. Open Phase Condition – The staff has issued TI 2515/194 for regional implementation. The initial inspections are covering four of the NEI voluntary industry initiative designs. The initial inspections concluded in June 2018. In addition, staff is currently reviewing LARs from Surry and TVA plants. d. EQ - Inspections are ongoing. A public meeting with industry was held in May as a follow-up to December 2017 meeting. e. All licensees have declared compliance with post-Fukushima Orders EA-12-049 (Mitigating Strategies) and EA-12-051 (Spent Fuel Pool Level Instrumentation).

2. New Reactors

a. The Commission issued the Combined Licenses for Turkey Point, Units 6 and 7, in April 2018. b. APR1400 Design Certification Review is currently in Phase 5 (Response to ACRS regarding SER with no Open Items issued) and 6 (Final SER issued); no electrical design open items. c. NuScale Design Certification Review is ongoing. ACRS SubCommittee Meeting on Chapter 8 (Electric Systems) took place in June 2018.

i. NuScale Power’s “Safety Classification of Passive Nuclear Power Plant Electrical Systems” Licensing Topical Report was approved by the NRC on January 2018.

d. With respect to the Advanced Reactor General Design Criteria, the staff issued, RG 1.232, “Developing Principal Design Criteria for Non-Light Water Reactors.”

3. Rulemaking

a. The final rule on Mitigation of Beyond-Design-Basis Events is under Commission’s consideration for approval.

 

Page 36: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

NRC Liaison Report - IEEE PES NPEC 18-02 (Continued) 4. Research

a. NRC’s Office of Research is in the process to endorse IEEE 741 (Appendix A related to DVR and LOV) and is awaiting publication of IEEE 946 to initiate the process for endorsing the standard. b. Regulatory Guide 1.158, “Qualification of Safety-Related Lead Storage Batteries for NPPs,” endorsing IEEE Standard 535-2013) was published in April 2018. c. Regulatory Guide 1.234, “Evaluating Deviations and Reporting Defects and Noncompliance Under 10 CFR Part 21” was issued in April 2018 d. NUREG/CR-7229, “DC Power System Fault Contributions from the Battery and Battery Chargers used in Nuclear Power Plants,” has been published. e. DG-1333, “Evaluating Electromagnetic and Radio Frequency Interference in Safety-Related I&C Systems,” has been published (ADAMS Accession No. ML16281A531) and comments were due by June 25, 2018.

5. Part 21

a. The following Part 21 Reports were issued in the past 6 months (more information available on the NRC website under the Part 21 Reports webpage): i. 2018-12-00 - Notification of 10 CFR 21 Defect – Failure of Relays to Change State

ii. 2018-11-00 - Interim Report Related to Failure of a Diesel Generator Pressure Switch

iii. 2018-06-01 - Dedicating Entity Part 21 Notification - General Electric CR120BD Relay

iv. 2018-07-00 - Notification for Certain Rosemount Model 1154 and Model 1154 Series H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies

v. 2018-06-00 - Inadequate Dedication of Relays vi. 2018-04-00 - Interim Part 21 Report Related to a Failed Bench Test of a General Electric Model CR124C028 Thermal Overload Relay vii. 2018-03-00 - Initial and Final Part 21 Report Related to an Incorrectly Sized Wire Lug found in a 480VAC Westinghouse / Eaton Circuit Breaker Cubicle

6. Generic Communications

a. IN 17-06 - Battery and Battery Charger Short-circuit Current Contributions to a Fault on the Direct Current Distribution System b. IN 17-05 - Potential Binding of Schneider Electric/Square-D Masterpact NT and NW 480-VAC Circuit Breaker Anti- Pump Feature

 

Page 37: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

7 PRESENTATION:

DC Charger Behavior (Shinji Kawanago)

Page 38: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Mitsubishi Heavy Industries, LTD

2018.7.24

Current Japanese Nuclear Plants Status and

Design Status & Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 39: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 2

Contents

1. Current Japanese Nuclear Plants Status

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 40: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 3

1. Current Status of Japanese Nuclear Plants (1/2)

Plan to be decommissioned

Status of the Japanese PWR Plants

Sendai NPP

Ikata NPP

Genkai NPP

Takahama NPP

Ohi NPP

2-loop

3-loop

4-loop

Mihama NPP

Tsuruga NPP

Tomari NPP

Fukushima Daiichi NPP (BWR)

Tokyo

Total: 26 Units

Approved to restart

Plan

MHI PROPRIETARY CLASS B

Page 41: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 4

Plan to be decommissioned

Status of the Japanese BWR & GCR Plants

Shimane NPP

Shika NPP

Fukushima Daiichi NPP

Plan

ABWR

Onagawa NPP

Higashidori NPP

Ohma NPP

Fukushima Daiichi NPP (BWR)

Tokyo

Total: 40 Units

Approved to restart

Fukushima Daiini NPP

Kariwa NPP

Tokai NPP

Tsuruga NPP

BWR

GCR

Hamaoka NPP

Kaminoseki NPP

1. Current Status of Japanese Nuclear Plants (2/2)

MHI PROPRIETARY CLASS B

Page 42: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 5

(1) IN2017-06 (1/2) Title : BATTERY AND BATTERY CHARGER SHORT-

CIRCUIT CURRENT CONTRIBUTIONS TO A FAULT ON THE DIRECT CURRENT DISTRIBUTION

IN was Issued on Sep/26/2017 IN indicates one concern:

IEEE std 946-2004 includes non-conservative design recommendation ;

When the battery charger is connected in parallel with the battery, the battery capacitance will prevent the battery charger contribution from rising instantaneously. Therefore, the maximum current that a charger will deliver on short circuit will not typically exceed 150 [percent] of the charger full load ampere rating. Instantaneous battery charger current rise should only become a concern during periods when the battery is disconnected.

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 43: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 6

(1) IN2017-06 (2/2) IN shows results of several experimental tests by BNL. This technical concern is related to type of Battery Charger. SCR type : Silicon Control Rectifier

Test results showed SCR charger provides 7 -10 times of the rated current during initial 100msec at DC short circuit fault.

This value is beyond 150% which is stated in IEEE.

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 44: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 7

(2) Japanese NPP’s design status (1/5) (a) Design Standards DC calculations refer SBA* 602.

“Short Circuit Current of Stationary Rechargeable Cells” *SBA : Standard of “Battery Association of Japan” This calculation method is consistent with IEEE std 946.

According to manufacturer remark, fault current’s

contribution from Battery Chargers can be calculated as negligible.

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 45: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 8

(2) Japanese NPP’s design status (2/5) (b) Japanese Battery Charger’s Supplier A

There are two type of SCR Charger ; - SCR type without Instantaneous Overcurrent protection

(note) In past, there was no available design on instantaneous overcurrent protection.

Fault current will be cut off by Fuse. Because Fuse will be blown-out, the Charger will be

physically isolated. - SCR type without Instantaneous Overcurrent protection

Overcurrent Protection will be activated by “200% of rated current”.

Once the fault point is cleared, the Charger will be started automatically.

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 46: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 9

(2) Japanese NPP’s design status (3/5) (c) Japanese Battery Charger’s Supplier B

There is only one type of SCR Charger ; - SCR type without Instantaneous Overcurrent protection

Fault current will be cut off by Fuse. Because Fuse will be blown-out, the Charger will be

physically isolated.

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 47: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 10

(2) Japanese NPP’s design status (4/4) (d) Experimental Data

There was one relevant reference information in past test (1990s). Test Conditions

Charger : around 50A, Battery : 500AH This Charger was SCR type without Instantaneous Overcurrent protection or Fuse, but with MCCB at just outlet of the Charger.

Two cases of test Case 1 : To have a Short Circuit at one DC load during

very Low load condition for the Charger. Case 2 : To have a Short Circuit at one DC load during

Full load condition of the Charger Results of tests

Case 1 : MCCB of Charger was not opened. Case 2 : MCCB of Charger was opened.

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 48: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 11

(3) Main Discussion in Japan Japanese regulation and Industry discussed how to resolve the issue:

1st Step: Contribution from Charger Magnitude of Contribution from charger and impact on the system should be checked by analysis and/or test. 2nd Step: Short Circuit Protection Evaluation If result of 1st step shows possibility of any impact on protection device by contribution from charger (i.e. unnecessary trip), protection against short circuit current should be evaluated.

Charger

DC Load

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 49: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

© MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 12

(4) Conclusion Japanese NPPs refer Japanese standard (i.e. SBA602)

which is equivalent to IEEE std 946. All Japanese NPPs use SCR type Battery Chargers. There are two type of SCR type. Two steps evaluation are considered. 1st step:

Check of Contribution from Charger 2nd step:

Evaluation of Short Circuit Protection if needed Currently discussing how to do step1

2. Design Status and Plan on IN2017-06

MHI PROPRIETARY CLASS B

Page 50: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 51: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

8 PRESENTATION:

In-Place Generator Rewind at Diablo Canyon

(Keith Bush)

Page 52: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Onsite Main Generator Upgrade

Presenter: Keith Bush

Date: 07/24/2018

Page 53: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Overall Project Scope

Main Generator was build in 1972 and placed in service in 1985. Over 33 years of operation has reached it end of life.Siemens Energy is modernizing the generator:

– Stator core replacement– New Nitronic through bolts with hydraulic nuts– Stator coil replacement– REGI-FLEX stator coil end winding support system– Water cooled parallel rings and main bushings – Hydrogen cooler replacement– Air cooled current transformers replacement– Stator Coil Cooling Water Heat Exchanger Replacement– Enlarge piping system piping due to increased flow rates

2

Page 54: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Donut Pack and Radial Vents

3

Stator Core Replacement

Page 55: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

4

Stator Exciter End Section

Stator Core Replacement

Page 56: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Stator Coil Cross Section

5

Stator Coil Replacement

Page 57: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Roebel TranspositionInvented in 1921 and patented in June 1915 by Ludwig Roebel

6

Stator Coil Replacement

Page 58: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

REGI-FLEX Stator DesignExciter End Turbine End

7

REGI-FLEX System

Page 59: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

REGI-FLEX Cross Section

8

REGI-FLEX System

Page 60: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Design Change Development

• Enercon prepared two (2) design changes1. Main Generator Upgrade

• Design Summary Report• Instrumentation Interfaces• Siemens Vendor Documentation• Electrical and Mechanical Calculation Revisions

2. SCCW System Upgrade• Design Summary Report• Siemens Vendor Documentation• Piping Support and Stress Analysis• Civil Calculation Revisions• New Instrumentation

9

Page 61: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Design Challenges

• Siemens was responsible for design and implementation of the upgrade, but took exception for all physical electrical modification work.

• Siemens legacy design records did not always match that of the existing plant documentation.

• Siemens sized and routed all piping based on system flow rates, but Enercon was responsible for analyzing for pipe stress.

• Technical specification was prepared by an individual with an electrical background, so level of detail was inconsistent for the other disciplines.

10

Page 62: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Design Challenges (Cont.)

• Design reviews were not very timely, design deliverable dates constantly moved out.

• Project calculation started per the schedule, but receipt of final design inputs resulted in significant delays.

• Siemens drawings are the responsibility of the PG&E to review and approve, normally Enercon can perform the review function, but in this specific contract, the Siemens is our client.

• Siemens was not aware of the details of the Design Change process.

11

Page 63: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

12

Page 64: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice Chair: Kenn Miller Secretary: Mitch Staskiewicz Alternate Secretary: Tammy Womack

MEETING MINUTES: S18-02, Mystic, CT (July 24, 2018)

ATTACHMENT

9 PRESENTATION:

Auto-Transformer Failure (Neal Simmons)

Page 65: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

McGuire Nuclear Station November 8, 2017

Page 66: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 67: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 68: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 69: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 70: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 71: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 72: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 73: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 74: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 75: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 76: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request
Page 77: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

The auto transformer consists of 3 single phase step-up transformers connected between the Unit 1 230kV yard and the Unit 2 525kV yard, with an installed single phase spare transformer. Prior to the failure, the single phase spare auto transformer was already in use. The Y phase was available as an installed spare. There were no signs of imminent failure from Oil Sampling testing of the auto transformer.

Page 78: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

The in-service spare phase (serving as the Y-phase) failed catastrophically. The failure of the in-service spare phase transformer caused extensive collateral damage to the adjacent X-phase transformer. Neither the failed transformer or the damaged transformer could be repaired on site. The 500 kV H1 Bushing faulted internally and failed catastrophically, initiating the event.

Page 79: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Updated voltage schedules were issued Switchyard Voltages went up.

Transmission relocated an auto transformer from another substation to replace the failed transformer. Transmission will be replacing the transformer at the substation. The replacement transformer has been installed and the Autobank has been returned to service. The Generator Voltage Schedule has been revised again for the new transformer.

Page 80: PES/NPEC SUBCOMMITTEE 4 (SC-4) Chair: Mark Bowman Vice ...grouper.ieee.org/groups/npec/SC4-open-access/sc4... · Duane Brock was moved to corresponding membership based on his request

Questions?