pete 411 - well drilling

16
Slide Slide 1 of 16 of 16 1. Introduction 1. Introduction Pete 411 Well Drilling Pete 411 Well Drilling PETE 411 - Well Drilling PETE 411 - Well Drilling by Dr. M. Amani TAMU-Petroleum Engineering FALL, 2003 Lesson 1 Lesson 1 Introduction Introduction

Upload: shing

Post on 07-Jan-2016

81 views

Category:

Documents


23 download

DESCRIPTION

PETE 411 - Well Drilling. Lesson 1 Introduction. by Dr. M. Amani. TAMU-Petroleum Engineering FALL, 2003. Lesson 1 - Introduction. Texts Grading Syllabus (attached and on internet) Class Objectives(attached and on internet) Schedule Corrections to Textbook (on internet) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PETE 411 - Well Drilling

Slide Slide 11 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

PETE 411 - Well DrillingPETE 411 - Well Drilling

by

Dr. M. Amani

TAMU-Petroleum EngineeringFALL, 2003

Lesson 1Lesson 1

IntroductionIntroduction

Page 2: PETE 411 - Well Drilling

Slide Slide 22 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Lesson 1 - IntroductionLesson 1 - Introduction

Texts Grading Syllabus (attached and on internet) Class Objectives (attached and on internet) Schedule

Corrections to Textbook (on internet)

http://pumpjack.tamu.edu/~juvkam-wold/

MOVIE The Rotary Drilling Rig

Page 3: PETE 411 - Well Drilling

Slide Slide 33 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

General InformationGeneral Information

Prerequisites: PETE 320, 321, 322, 323 and 324

3 credit hours

Class Schedule:

Section 501: MWF 9:10 - 10:00

Section 502: MWF 11:30-12:20

Class Room: Rich Room 313

Page 4: PETE 411 - Well Drilling

Slide Slide 44 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

General InformationGeneral Information

Instructor: Dr. M. Amani

Office: Room 401 K

Office Hours: MWF 10:00 – 11:00

MW 12:30 - 2 p.m– or by

appointment

Phone: 845-6164

[email protected]

Page 5: PETE 411 - Well Drilling

Slide Slide 55 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

TextbookTextbook

Applied Drilling Engineering,

by Adam T. Bourgoyne Jr., Martin E.

Chenevert, Keith K. Millheim and F.S.

Young Jr., Society of Petroleum

Engineers, Richardson, TX, 1991.

Available from the bookstore or directly from

SPE

Page 6: PETE 411 - Well Drilling

Slide Slide 66 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Basis for GradingBasis for Grading

Homework 10% Weekly Quizzes 10% Quiz A 20% Quiz B 20% Design Project 10% FINAL 30%

100%

Page 7: PETE 411 - Well Drilling

Slide Slide 77 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Homework Assignment:Homework Assignment:

Read: Applied Drilling Engineering,

Ch.1, pp 1-12

HW #1, due Monday, Sept. 8 (internet)

Class Lectures are on the Internet Class Lectures are on the Internet PETE 411 – Lessons 1 & 2

http://pumpjack.tamu.edu/~amani/

Page 8: PETE 411 - Well Drilling

Slide Slide 88 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

PETE 411 Catalog DescriptionPETE 411 Catalog Description

The design and evaluation of well drilling systems; identification and solution of drilling problems; wellbore hydraulics; casing design; well cementing; drilling of directional and horizontal wells; wellbore surveying.

Page 9: PETE 411 - Well Drilling

Slide Slide 99 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Schedule - Fall, 2002Schedule - Fall, 2002

WEEK NO. TOPICS

1. Introduction, the Rotary Drilling Process, The Rig, Drilling Equipment

2. Drilling Cost & Drilling Rate, Hole Problems, Drilling Structures

3. Drilling Bits, Drilling Hydraulics - Hydrostatics

4. Rheological Models, Pressure Losses in Laminar Flow, Slot Flow

Page 10: PETE 411 - Well Drilling

Slide Slide 1010 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Schedule - cont’dSchedule - cont’d

WEEK NO. TOPICS

5. Oct. 6 & 8: no classes; SPE Fall Mtng.

Surge and Swab Pressures - cont’d

6. Pressure across Bit, Bit Nozzle Sizing, Surge and Swab Pressures

7. Lifting Capacity of Drilling Fluids,Casing Design Procedures, Burst, Collapse, Tension

Page 11: PETE 411 - Well Drilling

Slide Slide 1111 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Schedule - cont’dSchedule - cont’d

WEEK NO. TOPICS

8. Casing Design, API Performance Properties, Examples, Drilling Technology - - Abnormal Pore Pressure Detection

9. Drilling Technology - Balanced and Overbalanced Drilling, Fracture Gradient Prediction, Gas Cut Mud, “dc-exponent”

Page 12: PETE 411 - Well Drilling

Slide Slide 1212 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Schedule - cont’dSchedule - cont’d

WEEK NO. TOPICS

10. Well Control Methods,

Kick Detection and Procedures for

Killing Wells, Wireline Logging, MWD

11. Cements and Cementing, Primary & Secondary Cementing

Squeeze Operations

Page 13: PETE 411 - Well Drilling

Slide Slide 1313 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Schedule - cont’dSchedule - cont’d

WEEK NO. TOPICS

12. Cementing Equipment, Additives, Liner Cementing, Setting Cement Plugs

13. Directional Drilling, Well Trajectory Surveying, Horizontal Drilling

Page 14: PETE 411 - Well Drilling

Slide Slide 1414 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Schedule - cont’dSchedule - cont’d

WEEK NO. TOPICS

14. Torque & Drag Calculations, Coiled Tubing,

Slimhole Drilling

15. Problem Solving,

Review,

Finals

Page 15: PETE 411 - Well Drilling

Slide Slide 1515 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

Important DatesImportant Dates

QUIZ A - Monday, Oct. 13, 7-9 p.m.

QUIZ B - Monday, Nov. 10, 7-9 p.m QUIZ A & B: Rich 101

Design Projects Due: - Monday, Dec. 8, 5 p.m. (Rich 401K)

FINALS Rich 313

- Sec. 501: Mon., Dec. 15, 8-10 a.m. - Sec. 502: Wed., Dec. 17, 10:30-12:30

Page 16: PETE 411 - Well Drilling

Slide Slide 1616 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling

END

Lesson 1

And now, the movie...

PETE 411 - Texas A&MPETE 411 - Texas A&M