ENV IPT MEETING MINUTES
PF225‐VF300
‐Environmental
Working
Group
MEETING DATE:
06-02-2008
10:00 AM CDT
START TIME
ATTENDANCE/DISTRIBUTION
003947
(b) (6)
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 2/18
PF225 Meeting Minutes
) REMAINING PHASE I PF22 jo
1 5 ENVIRONMENTAL ISSUES A (D-2): Status
• Salvage Plan submitted for NPS review. NPS providing comments. Salvage is on-going while planed. Salvage plan finalized. Restoration plan being worked out. No updates reported.
ill be included in ECSO’s Environmental Repository for final filing.
(BRP) SCHEDULE ded basis.
in process.
0-4 – 0-10. SBI will have a full-time rep in Hidalgo
the County's work. Anticipated start date for (0-5, 0-6, 0-7) to
s. See timeline.
(with staging areas still needing surveyed). The stipulationd need to survey the staging areas (primarily for cultural
ange Request #27-Segment I_1A & I_1B-Access Road Change. Submitted on May 12.
f week (provided surveys are done).
is being finaliz
2) WEBSITE
• ELC and Yuma ESPs should be posted by the end of the week.
• ESPs w
3) ENVIRONMENTAL STEWARDSHIP PLANS (ESP)/BIOLOGICAL RESOURCE PLANS
• Change orders (that require additional survey) will be addressed on an as-nee
• See attached timeline schedule for project-specific reviews.
RGV ESP (O-1 – O-21)
• ESP/BRP review in process. See timeline.
• Draft ESP/BRP review
• Environmental Monitors to be provided for
tasked with coordinating/overseeingbegin by the end of June.
DRT (M-1, M-2A)
• ESP/BRP review in proces
MAR (L-1, L-1A, L-1B)
• ESP/BRP review in process. See timeline.
EP (K-2A, K-2B/C/D, K-3, K-4, K-5)• ESP/BRP review in process. See timeline.
T
• Being proposed that the ESP go finalwill be that the construction contractor woul
resources) and to avoid eligible resources. to follow up with to confirm that is the pathforward.
DEMING (H-2A AND I-1B)
•
PF225 ChReviews due May 29.
• ESP will be revised based on AR#5. Assume 45-50 foot road width (per ).
E-2A (NATIONAL MEMORIAL)
• ESP/BRP review in process. See timeline.
• ESP to be submitted by end o
003948
(b) (b)
(b) (6)
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 3/18
• ESP Schedule. Surveys underway.
YUM (C-1, C-2B)
• ESP to be finalized this week. Final ESP approved.
k to 27 May.
Final ESP approved.
Status?
K, A-2L, A-2N)
begin once provided following contract award.
).
Went out with Draft ESP.
Rio: Being Finalized. Went out with ESP.
e Waiver, no BRP.
surveyed. Data to be provided to E2M when available.
ovide with remaining BRP related data this week.
unes). Final BRP complete. Awaiting final approval.ck-final being reviewed.
) will have the latitude to develop scopes and contract cultural and
sts concurrent with finalizing BRPs, ESPs, and BMPs.d Restoration Plans. RFPs will include salvage plan task. The development of restoration
ental Monitor
PO ill h 5 d i i d f l l
• ATP pushed bac
ELC (B-2, B-3, B-4, B-5A, B-5B)
• ESP to be finalized this week.
AIRPORT MESA (A-2M)
• ESP in check-final review. Check-final review today.
SD ESP (A-2B, A-2C, A-2D, A-2E, A-2F, A-2H, A-2I, A-2J, A-2
•
ESP review to be finalized this week.
C
SD ESP (A-1, A-2A)
• Review of the preliminary alignment to
C
• A-2A, July 15 (ATP
4) BRPS
• RGV: Being finalized.
• Del
• Marfa: No Effect• El Paso: No Effect
• Deming: BA befor
• D-5: Corridor being
• D-5B/D-6 being finalized. GSRC to pr
• E-2A: Being prepared.
• Yuma (C-2B): No Issues.
•
El Centro/Yuma (Sand D• San Diego Gap Filler – Che
• San Diego (A-1/A-2A) – TBD.
5) ENVIRONMENTAL & CULTURAL M
• Each COE PM
ONITORS
environmental monitors.
6) BMPS /RFPS
• Developing mitigation co• Salvage an
plans will be a separate contract (i.e. not included in the Construction or Environm
contracts).
7) SECTION 106 (TRACKING MATRIX INCLUDED AT END OF MINUTES)
A SH
003949
(b) (6)
(b) (6)
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 4/18
Monitors for C-1 tribal land.
eed monitors for construction.
ana
Estuarine Research Reserve.
• Yuma: Report complete and being distributed.
• El Centro: Report complete and being distributed. No issues.
• Sand Diego A-2:
•
San Diego A-1: Report complete and being distributed. Only n8) SECTION 404/401
• One project identified and it includes invasive tree removal/marsh restoration project at the Tiju
River National ) is the contact.
Resource Plan: BRP
erFencePlanning.com
CBP will need to coordinate directly with organization.
• CBP finalized letter to the USACE HQ addressing its intention to mitigate impacts to Waters of theU.S.
• ECSO to determine level of effort and process and procedures for CA RWQCB monitoring efforts.
) OOPERATING9 C /COORDINATING AGENCY STATUS
• EPA Comment effort. Status? Need to close the loop on format for comment responses.
10) ACRONYMS
• Best Management Practice: BMP
• Biological
• Border Fence Planning (www.Bord ): BFP Website
t: CRSP
st PF225 Status Matrix table.
uct EDDAs for Federal properties to prevent risk to construction and set pre-construction
igation costs for cultural resources, waters of the U.S., BMPs applicable tod general BMPs.
ddress IBWC comments/coordination process (to be
C MOA).
• Cultural Resources Survey Repor• Environmental Due Diligence Assessment: EDDA
• Environmental Stewardship Plan: ESP
• Request for Information: RFI
• Request for Proposal: RFP
11) EDDAS
• Status is provided in the late
• Condbaseline condition.
12) MITIGATION TRACKING
• Need to estimate mitendangered species, an
13) ACTION ITEMS
• to follow up on how to a
consistent with the CBP-IBW• Finalize responses to EPA comments and determine comment-response matrix format.
4 EY ISSUES (FOR FEIT ACTION)1 ) K
• Need resolution on EPT (K sections) ROE, staging and access road locations.
003950
(b) (6)
(b) (6)
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 5/18
As of: 2 June 2008 PF 225 Environmental Timeline Document RFP Issue Date BRP ESP Review Final ESP--Week Of RFP Award Date Construction
Start Date (P2)Comments
Rio Grande
Valley ESP6.23.08 6.3.08 5.25.08 6.02.03 8.04.08 8.07.08 Levee wall to start by July
Del Rio ESP 5.28.08 6.3.08 5.29.08 6.2.08 7.17.08 8.01.08
Marfa ESP 5.15.08Current No
Effect6.3.08 6.09.08 6.17.08 7.24.08 No BRP
El Paso K
Segments4.21.08
Current No
Effect5.29.08 6.02.08 6.5.08 6.13.08
No BRP. Need to get the access roads and
staging areas surveyed, as appropriate;
ESP will be pending until surveys are
complete. Alternative is to proceed and
put stipulation on construction contractor
to survey access/staging areas thatcurrently lack ROE.
Deming ESP 6.4.08 04.20.08 5.29.08 6.09.08 8.05.08 8.02.08No BRP since BA already existed; Going
to include AR #5 in final ESP.
E-2A
Coronado Nat
Memorial ESP
4.30.08 5.9.08 5.25.08 6.09.08 6.12.08* 6.27.08Check final ESP to be submitted NLT 4
June
Tucson ESP
D-5B/D-65.6.08 6.9.08 6.5.08 6.09.08 6.19.08* 7.12.08 Draft ESP to be submitted 2 June
D-5 7.01.08 6.22.08 6.22.08 6.30.08 8.01.08 8.xx.08 Draft ESP more likely 6.30.08
Yuma ESP (C-
1/C-2B)3.14.08 5.19.08 5.19.08 5.19.08 5.20.08* 5.27.08
Final ESP approved 29 May. To be posted
by COB June 6.
EL Centro ESP 2.08.08 5.19.08 5.19.08 5.19.08 5.20.08* 5.22.08Final ESP approved 29 May. To be posted
by COB June 6.
Airport Mesa 5.29.08 6.03.08 5.28.08 6.09.08 6.26.08
San Diego (A-
2) ESP4.28.08 6.03.08 5.28.08 6.09.08 6.26.08* 7.10.08 need to ensure BRP and ESP jibe
San Diego ESP
(A-1)1.22.08 6.15.08 6.20.08 6.26.08 5.29.08* 5.30.08
Delayed one month due to new alignment
for fence
Page 5 of 18
003951
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 6/18
VF300 Meeting Minutes
Combined VF300 and PF225 Programmatic issues:
• The combined meeting is to facilitate closer integration of the PF and VF projects.
• The Draft West Tucson EA will be delivered to SBE later this week.
• The first two ESPs have been approved for PF225 – the Tucson and El Centro ESPs will be
posted on the website by the end of this week.
•
Need to look into providing environmental monitoring for VF projects which will be managedby the individual project managers.
• Review process for ESPs:o Share the process developed from PF projects.
o Look into using tools like Adobe Acrobat reviewing functions and house the draft
document on the shared drive so that there can be live/shared reviewing.
o Another proposed option is reviewing as a team and providing one set of comments.
1) VF300 Environmental Program Overview
• Program team includes: CBP, OBP, SBI, USACE, LMI, e²M, MBaker, GSRC, HDR
A) VF300 Programmatic Other/Key Issues
• Environmental Stewardship Plan (ESP) –
o Contracts – Contracts in process will continue as negotiated and will be modified as
needed as ESPs specifics are defined.
• Environmental contracts are in place for Yuma and El Paso Sectors out of FWUSACE District. The verbal NTPs have been issued to the environmental
contractors to move forward with CV 1a/1b. Verbal NTPs for JV 1a/1b/2/3are inprocess. The task orders will be issued soon.
o Schedule of ESPs – requested to move all of the ESP completion dates as soon aspossible.
• Updates are incorporated in the VF 300 timeline revision which is attached at theend of the meeting minutes.
• Need to start filling in timeline for environmental tasks – Project Managers
•
Need to look at staggering the schedule of ESP deliverables to reduce theimpact on the reviewers and to enable meeting reviewing deadlines.
• Review current schedules this week, and determine possible dates for anintegrated team meeting to finalize the ESP deliverable schedule. It may
be possible to coordinate this with the monthly VF meeting on 18 June.
• Need to define review and comment process for ESPs.
003952
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 7/18
o VF300 Sector level Coordination Letters need to go out. will submit the draft
Yuma and El Paso letters for review by the end of the week.
o will coordinate with to ensure all final letters are distributed to
project teams for incorporation into ESPs.
o Separate letters need to be drafted for the Cocopah and Tohono O’odham Nationsdetailing the projects applicable to their territory.
o Meetings will be coordinated with Native American Nations upon their request only.
o Fence coordinates will not be included in coordination letters.
o Project specific coordination letters for the SHPO are almost complete.
• Public Outreach –
o 15 Day Public Review of GPD –
• The GPD for Public Meetings will be same as the GPD set out on web for 15 daypublic review.
• The public review period is scheduled to start sometime in the first week of Juneand the notices of availability will appear in local newspapers where it will direct
people to the website for comments. The notices of availability will be referred to
as “Public Announcements.” is working on final language.
o Public Meeting –
• TON meeting is scheduled for 3 June 2008.
• Biological Resource Plans –
o The Yuma Sector BRP will not include any information on the Cocopah project. The
Cocopah will have a separate BRP and ESP.
o Need to start planning the project level BRPs.
• BMPs for VF300 –
o The following considerations need to be addressed:
•
Possible changes due to VF to PF full summaries.• Effects on the milestone dates due to changed scope.
• Many sensitive plants (saguaro and barrel cactus) have been found in the
construction corridors. Determine if BMPs should be for “remove, replenish, andreplace,” “to salvage,” or “to avoid” as described in the EA. Confirm that the
Sector agreed “to avoid.”
• Kick-off Meetings – Sector Level
o The VF 300 meetings are complete.
• Other Issues/Concerns –o Note that Public Lands are exempt from EDDAs.
o Contingency Miles (DV-6/7/8) Planning – waiting for the response to the RFP.
B) Programmatic Action Items
• Environmental Contracts have been verbally given to proceed and the TOs will be issued for the
003953
(b) (6)
(b) (6) (b) (6)
(b) (6)
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 8/18
• Public Lands ESP –
• Cocopah Land ESP –
• Cabeza Prieta ESP –
• Tucson Sector –• Sierra De La Nariz ESP –
• Tohono Nation EA –
• Pozo Verde Mountains ESP –
• Sonoita ESP –
• Douglas ESP –
• El Paso Sector –
• Lordsburg ESP –
• Lordsburg Antelope Wells ESP –
• Santa Teresa ESP –
• Deming EA –
D) VF300 ESP Documents
USBP Sector ESP Document Fence Section(s) Distance(miles)
Environmental Lead
El Centro El Centro PF225 EA
(Completed)BV-1 (former PF TI) 6.41 e²M
Yuma Public Lands ESP CV-1a 5.0 GSRC
Cocopah Land ESP CV-1b 8.3 GSRC
Cabeza Prieta ESP CV-2 10.62 e²M
-- (Under Construction) CV-3 22.48 N/A
Tucson -- (Under Construction) DV-1 12.99 N/ASierra De La Nariz ESP DV-2, DV-3b, DV-4c 3.01 GSRC
Tohono Nation EA
(Completed)DV3a, DV-4a,DV-4b 45.86 GSRC
Pozo Verde Mountains
ESPDV-5 1.82 GSRC
Tucson Contingency DV-6/7/8 13.286 ?????
Sonoita ESP EV-1a/1b 13.88 GSRC
Douglas ESP FV-1b 16.264 e²MEl Paso Lordsburg ESP HV-1, HV-2, HV-3 16.24 GSRC
Lordsburg (AntelopeWells ESP
HV-4 5.98 GSRC
Santa Teresa ESP JV-1a/1b, JV-2, JV-3 39.92 GSRC
Deming EA (Completed) IV-2, IV-4a/b 18.48 GSRC
IBWC MOU J
003954
(b) (6)
(b) (6)
(b) (6)
(b) (6)(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 9/18
Other/Key Issues –
A section of the proposed pedestrian fence has been changed to vehicle fence. No additional
environmental documentation is anticipated.
Action Items –
B) Yuma Sector – Public Lands ESP (CV-1a)
Agency Coordination –
ESP Status – Not Started
Critical Concerns –
Best Management Practices – BMPs will be implemented as appropriate.
Other/Key Issues – ROE for access roads on Private Lands is currently being worked.
Brush clearing - will not be included as part of this ESP. Will need separate EA.Action Items –
Determine new name for ESP.
Yuma Sector Public Lands ESP (CV-1a) - Schedule
Milestones Start Date End Date StatusEnvironmental Contract Awarded TBD
Project Kick-off Meeting N/A 5/22/2008
Chapter 2 (Project Description)
Bio and Cultural Surveys 6/11/2008Biological Resources Report
Cultural Resources Survey Report
BMP Development
Draft ESP Project Review
95% Draft ESP for HQ DHS/CBP Review
Final ESP/Environmental Clearance
Public Outreach Summary Report
95% RFP for Construction N/A 07/29/2008
Issue RFP for Construction N/A 08/19/2008
Construction 10/07/2008 12/06/2008
C) Yuma Sector – Cocopah Land ESP (CV-1b)
Agency Coordination – Cocopah Nation
ESP Status – Not Started
Critical Concerns –
Best Management Practices - BMPs will be implemented as appropriate.
Other/Key Issues – None Action Items –
Yuma Sector Cocopah Land ESP (CV-1b) - Schedule
Milestones Start Date End Date Status
Environmental Contract Awarded TBD
P j t Ki k ff M ti TBD TBD
003955
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 10/18
Milestones Start Date End Date Status
Issue RFP for Construction N/A 08/19/2008
Construction 10/07/2008 12/21/2008
D) Yuma Sector – Cabeza Prieta ESP (CV-2)Agency Coordination –
ESP Status – Not Started
Critical Concerns –
Best Management Practices – BMPs will be implemented as appropriate.
Other/Key Issues – Contract for ESP has been awarded.
Action Items –
Yuma Sector Cabeza Prieta ESP (CV-2) – ScheduleMilestones Start Date End Date Status
Environmental Contract Awarded 04/21/2008
Project Kick-off Meeting N/A 5/22/2008
Chapter 2 (Project Description) 5/1/08 5/19/08 Fact sheet is done;
chapter 2 is
underway
Bio and Cultural Surveys 5/28/08
6/3/08
Scheduled to start
the second week
of JuneBiological Resources Report 6/4/08 6/13/08 Wetlands will
occur ASAP
Cultural Resources Survey Report 6/4/08 6/13/08
BMP Development 5/22/08
Draft ESP Project Review 6/13/06 7/07/08
95% Draft ESP for HQ DHS/CBP Review 7/21/08 7/28/08
Final ESP/Environmental Clearance 8/11/08
Public Outreach Summary Report
95% RFP for Construction N/A 07/29/2008Issue RFP for Construction N/A 08/19/2008
Construction 10/07/2008 12/20/2008
E) Tucson Sector – Sierra De La Nariz ESP (DV-2/DV-3b/DV-4c)
Agency Coordination – Tohono O’odham Nation
ESP Status – Not started
Critical Concerns – Note that there were no eligible archeological sites found in the CR survey.
Best Management Practices – BMPs will be implemented as appropriate.Other/Key Issues – TON land is used to access this site. The issue is still being worked.
Action Items – Determine new name for ESP.
Tucson Sector Sierra De La Nariz ESP (DV-2/3b/4c) - Schedule
Milestones Start Date End Date Status
Environmental Contract Awarded 04/30/2008
003956
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 11/18
Milestones Start Date End Date Status
Public Outreach Summary Report
95% RFP for Construction* 07/01/2008 07/02/2008
Issue RFP for Construction* 07/15/2008 07/16/2008
Construction* 09/12/2008 11/27/2008*Reflects earliest start date and latest end date for multiple segments
F) Tucson Sector – Pozo Verde Mountains ESP (DV-5)
Agency Coordination – ESP Status – Not Started
Critical Concerns –
Best Management Practices – BMPs will be implemented as appropriate.
Other/Key Issues – Action Items –
Tucson Sector Pozo Verde Mountains ESP (DV-5) - Schedule
Milestones Start Date End Date Status
Environmental Contract Awarded 04/30/2008
Project Kick-off Meeting 5/22/2008
Chapter 2 (Project Description)
Bio and Cultural Surveys
6/15/08 On track for
scheduled start
date.
Biological Resources Report
Cultural Resources Survey Report
BMP Development
Draft ESP Project Review
95% Draft ESP for HQ DHS/CBP Review
Final ESP/Environmental Clearance
Public Outreach Summary Report
95% RFP for Construction N/A 07/02/2008Issue RFP for Construction N/A 07/16/2008
Construction 10/10/2008 12/28/2008
G) Tucson Sector – Tucson Contingency ESP (DV-6/7/8)
Agency Coordination – ESP Status – Not Started
Critical Concerns –
Best Management Practices – BMPs will be implemented as appropriate. Other/Key Issues –
Action Items – Contract needs to be awarded.
Tucson Sector Tucson Contingency ESP (DV-6/7/8) - Schedule
Milestones Start Date End Date StatusEnvironmental Contract Awarded TBD
003957
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 12/18
Milestones Start Date End Date Status
95% RFP for Construction N/A 6/03/2008
Issue RFP for Construction N/A 6/16/2008
Construction 10/14/2008 12/18/2008
H) Tucson Sector – Sonoita ESP (EV-1a/1b)
Agency Coordination –
ESP Status – Started last week
Critical Concerns – Note that there were no eligible archeological sites found in the CR survey.
Best Management Practices – BMPs will be implemented as appropriate.
Other/Key Issues –
Action Items –
Tucson Sector Sonoita ESP (EV-1a/1b) - Schedule
Milestones Start Date End Date Status
Environmental Contract Awarded 04/30/2008
Project Kick-off Meeting N/A 5/22/2008
Chapter 2 (Project Description)
Bio and Cultural Surveys Complete
Biological Resources Report
Cultural Resources Survey Report
BMP DevelopmentDraft ESP Project Review
95% Draft ESP for HQ DHS/CBP Review
Final ESP/Environmental Clearance
Public Outreach Summary Report
95% RFP for Construction N/A 06/24/2008
Issue RFP for Construction N/A 07/08/2008
Construction 09/05/2008 11/22/2008
I) Tucson Sector – Douglas ESP (FV-1b)
Agency Coordination –
ESP Status – Not Started
Critical Concerns – T&E Species and Habitat, 3 eligible archeological sites found, and 2 possibly
eligible sites found.
Best Management Practices – BMPs will be implemented as appropriate.
Other/Key Issues –
Action Items – Resolve any ROE issues, and determine the status of the 2 possibly eligiblearcheological sites
Tucson Sector Douglas ESP (FV-1b) - Schedule
Milestones Start Date End Date StatusEnvironmental Contract Awarded 04/21/2008
Project Kick-off Meeting N/A 5/22/2008
003958
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 13/18
Milestones Start Date End Date Status
USFWS
Draft ESP Project Review 7/11/08 7/16/08
95% Draft ESP for HQ DHS/CBP Review N/A 7/25/08
Final ESP/Environmental Clearance 8/22/08Public Outreach Summary Report
95% RFP for Construction N/A 07/15/2008
Issue RFP for Construction N/A 07/29/2008
Construction 09/27/2008 12/24/2008
J) El Paso Sector – Lordsburg ESP (HV-1, HV-2, HV-3)
Agency Coordination –
ESP Status – Contracted awarded – Nov 2007 Critical Concerns – Cultural Sites
Best Management Practices – BMPs will be implemented as appropriate. Other/Key Issues – Contract needs modification for ESP.
Action Items –
El Paso SECTOR - Lordsburg ESP (HV-1/2/3) - Schedule
Milestones Start Date End Date Status
Environmental Contract Awarded 10/24/2007
Project Kick-off Meeting N/A 05/29/2008 CompleteChapter 2 (Project Description) 5/8/2008 Complete
Bio and Cultural Surveys
3/20/2008 Late June
Fieldwork in
progress
Biological Resources Report 5/31/2008 6/14/2008
Cultural Resources Survey Report 6/2/2008 7/31/2008
BMP Development On Hold
Draft ESP Project Review 8/1/2008 8/7/2008
95% Draft ESP for HQ DHS/CBP Review 8/19/2008 8/21/2008
Final ESP/Environmental Clearance 8/29/2008 9/5/2008Public Outreach Summary Report 6/10/2008 6/16/2008
95% RFP for Construction* 7/18/2008- HV-1
7/15/2008 – HV-2
7/22/2008 – HV-3
Issue RFP for Construction* 8/07/2008-HV-1
8/4/2008 – HV-2
8/11/2008 –HV-3
Construction* 9/16/2008 – HV-1
& HV29/18/2008 – HV-3
11/29/2008 – HV-1
12/6/2008 – HV-2and HV-3
*Reflects earliest start date and latest end date for multiple segments
K) El Paso Sector – Lordsburg (Antelope Wells) ESP (HV-4)
Agency Coordination – ESP S C d d d N 2007
003959
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 14/18
El Paso SECTOR - Lordsburg (Antelope Wells) ESP (HV-4) - Schedule
Milestones Start Date End Date StatusEnvironmental Contract Awarded 10/24/2007
Project Kick-off Meeting N/A 05/29/2008 Complete
Chapter 2 (Project Description) 5/8/2008 CompleteBio and Cultural Surveys 3/20/2008 3/31/2008 Complete
Biological Resources Report 4/18/2008 6/2/2008 Will we meet this
deadline?
Cultural Resources Survey Report 4/10/2008 6/23/2008
BMP Development
Draft ESP Project Review 6/25/2008 7/1/2008 Issue for review
on 6/2/08
95% Draft ESP for HQ DHS/CBP Review 7/14/2008 7/16/2008
Final ESP/Environmental Clearance 7/24/2008 7/29/2008Public Outreach Summary Report 6/10/2008 6/16/2008
95% RFP for Construction N/A 6/25/2008
Issue RFP for Construction N/A 7/16/2008
Construction 8/25/2008 12/1/2008
L) El Paso Sector – Deming Station (IV-2, IV-4)
Agency Coordination –
EA Status – Complete Critical Concerns –
Best Management Practices – BMPs under development and will be implemented as appropriate inconstruction RFP.
Other/Key Issues – The additional access road for IV-4B will be included in the PF225 ESP.
Action Items – None
M) El Paso Sector – Santa Teresa ESP (JV-1a/1b, JV-2 JV-3)
Agency Coordination –ESP Status – Not started – waiting for the verbal request paper work for the project and the award of
the task order to GSRC
Critical Concerns –
Best Management Practices – BMPs will be implemented as appropriate.
Other/Key Issues – None
Action Items – Need contract for ESP awarded as soon as possible.
El Paso Sector Santa Teresa ESP (JV-1a/1b, JV-2, JV-3) - Schedule
Milestones Start Date End Date StatusEnvironmental Contract Awarded 5/29/2008 A Verbal to proceed
received.
Project Kick-off Meeting N/A 05/29/2008 Complete
Chapter 2 (Project Description) for Public Outreach 5/8/2008
Bio and Cultural Surveys 5/30/2008 6/20/2008 On the ground 0n
003960
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 15/18
Milestones Start Date End Date Status
95% RFP for Construction* 7/11/2008 –JV-1a/1b
7/3/2008 – JV-2
7/16/2008 – JV-3
Issue RFP for Construction* 7/31/20087/24/2008 – JV-2
8/5/2008 – JV3
Construction* 9/6/2008 – JV-1a/b
08/30/2008- JV-2
9/12/2008 – JV-3
11/24/2008 – JV-1a/JV-1b
11/28/2008 – JV-2
11/30/2008 – JV-3*Reflects earliest start date and latest end date for multiple segments
Biological Resources Plans
Project
Biological Survey
Complete (Target
Date)
Sector BRP Complete
(Target Date) BRP Lead Status
Public Lands ESP
Mid July e2MPlanning Stage for
Sector Level BRPCocopah Land ESP
Cabeza Prieta ESP
Sierra De La Nariz ESP
Late July to early
AugustGSRC
Planning Stage for
Sector Level BRP
Pozo Verde Mountains
ESP
Tucson Contingency ESP
Sonoita ESP
Douglas ESP
Lordsburg ESP
Mid August GSRC
Planning Stage for
Sector Level BRPLordsburg (Antelope
Wells) ESP
Santa Teresa ESP
003961
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 16/18
Cultural Resources Survey Reports
ProjectCOE
DistrictAccomplishments Current Status Looking Ahead
Public Lands ESP
FT Worth
AZ State SHPO/Tribe’s
Waiver Letter Sent30 April 08
Survey Scheduled for 11
June 2008 Complete Survey Mid June
Cocopah Land ESPFT Worth
AZ State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey Scheduled for 11
June 2008Complete Survey Mid June
Cabeza Prieta ESPLas Angeles
AZ State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Pre-field tasks underway Complete Survey Mid June
Sierra De La Nariz ESPLas Angeles
AZ State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey Complete Complete Survey Report
Mid June
Pozo Verde Mountains
ESP Las Angeles
AZ State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Pre-field tasks underway Complete Survey Late June
Tucson Contingency
ESP???? Survey not started Complete Survey Late July
Sonoita ESPLas Angeles
AZ State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey CompleteComplete Survey Report
Mid June
Douglas ESPLas Angeles
AZ State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey Complete Complete Survey Report
Mid June
Lordsburg ESPFT Worth
NM State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey CompleteNeed to complete survey for
HV-3 access roads
Lordsburg (Antelope
Wells) ESP FT Worth
NM State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey CompleteComplete Resources Survey
Report mid June
Deming EA FT Worth
NM State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Survey for New Access
Road Complete
Complete Resources Survey
Report Mid June
Santa Teresa ESP FT Worth
NM State SHPO/Tribe’s
Waiver Letter Sent
30 April 08
Pre-field tasks underway Complete Survey Mid June
Surface Waters and Wetlands Reports
Project COEDistrict
Accomplishments Current Status Looking Ahead
Public Lands ESP
Cocopah Land ESP
Cabeza Prieta ESP
Sierra De La Nariz ESP
003962
8/8/2019 PF225-VF300 Environmental IPT Final Meeting Minutes (6!2!2008) Final 18
http://slidepdf.com/reader/full/pf225-vf300-environmental-ipt-final-meeting-minutes-622008-final-18 17/18
Public Meetings
ProjectCity/Location of Public
Meeting
Date/Time of Public
MeetingCongressional District/Sector
Public Lands ESP Shilo Inn Yuma, AZ 15 May 08 (4:30 – 8:00 PM) AZ Congressional District #7 /Yuma
Cocopah Land ESP TBD TBDAZ Congressional District #7
/Yuma
Cabeza Prieta ESP Shilo Inn Yuma, AZ 15 May 08 (4:30 – 8:00 PM)AZ Congressional District #7
Yuma
Sierra De La Nariz ESP TON Sells, AZ3 June 08 (10:00AM –
12:00PM)
AZ Congressional District #7
/TON/Tucson
Sierra De La Nariz ESP
Part of DV-5 not on TON
Windmere Hotel Sierra Vista, AZ13 May 08 (4:30 – 8:00 PM)
AZ Congressional District #7
/Tucson
Pozo Verde Mountains
ESP
Windmere Hotel Sierra Vista, AZ
13 May 08 (4:30 – 8:00 PM)AZ Congressional District #7
/Tucson
Tucson Contingency ESP Windmere Hotel Sierra Vista, AZ
13 May 08 (4:30 – 8:00 PM)AZ Congressional District #8
/Tucson
Sonoita ESP Windmere Hotel Sierra Vista, AZ
13 May 08 (4:30 – 8:00 PM)AZ Congressional District #8
/Tucson
Douglas ESP Windmere Hotel Sierra Vista, AZ
13 May 08 (4:30 – 8:00 PM) AZ Congressional District #8
/Tucson Lordsburg ESP Mimbres Valley Learning
Center Deming, NM19 May 08 (4:30 – 8:00 PM)
NM Congressional District #2
/El Paso
Lordsburg (Antelope
Wells) ESP
Mimbres Valley Learning
Center Deming, NM19 May 08 (4:30 – 8:00 PM)
NM Congressional District #2
/El Paso
Deming EA Mimbres Valley Learning
Center Deming, NM19 May 08 (4:30 – 8:00 PM)
NM Congressional District #2
/El Paso
Santa Teresa ESP Mimbres Valley Learning
Center Deming, NM19 May 08 (4:30 – 8:00 PM)
NM Congressional District #2
/El Paso
003963