PFR For Proposed Expansion
Slum Rehabilitation Scheme of
“Shree Saibaba Nagar SRA Co-
Op. Hsg. Soc. (Prop.)” at
Dhobighat, Satrasta, Mumbai” By
M/s. Omkar Realtors Projects Pvt.
Ltd.
9th November ,
2017
Proposed SRA Scheme
By M/s. Omkar Realtors Projects Pvt.Ltd
Pre-
Feasibility
Report
(PFR)
Submitted to
Expert Appraisal Committee (EAC), MoEF& CC, Delhi
Environmental Consultant
Building Environment (India) Pvt. Ltd
Dakshina Building, Office No-401,4th Floor,
Beside Raigard Bhavan, Sakal Bhavan Rd,
Sector 11, CBD Belapur,
Navi Mumbai, Maharashtra 400614
Telefax: 022 4123 7073/2757 8554
Web: www.beipl.co.in
Submitted by
Omkar Realtors Projects Pvt.Ltd.
Omkar House, Off Eastern Express
Highway, Opp. Sion-Chunabhatti Signal,
Sion (E). Mumbai 400 022
B- +91 22 66254100
F- +91 22 24034066
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
1
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY 3
i. Power Requirement: 5
ii. Water Requirement: 5
iii. Manpower Requirement: 6
iv. Wastewater Management: 6
v. Solid Waste Management 6
vi. Noise 6
a. Environmental Attributes 7
b. Air Dispersion Modeling 7
2. INTRODUCTION 8
3. PROJECT DESCRIPTION 9
i. Location Details 9
ii. Connectivity: 10
iii. Details of Alternative Site Considered 10
iv. Project Area Details 10
v. Process Details 10
vi. Flow Chart Showing Project Layout 10
vii. Power: 10
viii. Water: 11
ix. Manpower: 11
x. Raw Material Requirement 11
xi. Waste Management/ Disposal 11
4. SITE ANALYSIS 12
i. Connectivity 12
ii. Land form and Land Use 12
iii. Land Ownership 12
iv. Existing Land Use Pattern 12
v. Existing Infrastructure 12
vi. Soil Classification 12
vii. Climate data secondary source 12
viii. Social Infrastructure Available 12
5. PLANNING BRIEF 13
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
2
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
i. Planning Concept - SRA Project 13
ii. Population Projection - On completion of the project, total population is expected to be
16417 Nos. 13
iii. Land use planning - As per the DP Plan the site is under commercial and residential
zone. 13
iv. Amenities or facilities 13
6. PROPOSED INFRASTRUCTURE 14
i. Residential area – 14
ii. Commercial area – 14
iii. Green belt – 14
iv. Drinking water Management 14
v. Sewerage System 14
vi. Industrial Waste Management 14
vii. Solid Waste Management 14
viii. Power Requirement and Supply 15
7. REHABILITATION AND RESETTLEMENT PLAN 16
8. PROJECT SCHEDULE AND COST ESTIMATES 17
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
3
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
1. EXECUTIVE SUMMARY
M/s. Omkar Realtors Projects Pvt.Ltd. has proposed an expansion of SRA Scheme on plot
bearing C.S.No. 1(pt) , 2(pt) and 3(pt) of Lower Parel Division in G/South Ward at G.B. Sakpal
Marg and Babu Kamlakant Singh Marg, Dhobighat, Satrasta, Mumbai-400011 for Shree
Saibaba Nagar CHS ( Prop.) & other 7 Societies. The project location on Google is shown
below in Figure 1.1 and Layout in Figure 1.2.
Figure 1.1: Project Location
Figure 1.2: Project Layout
The total cost of the project estimated is 1000 Cr. The project site comes under Municipal
Corporation of Greater Mumbai (M.C.G.M). As per the Draft GDCR 2034, the development
allowed on this plot as per regulation No.13.2 & 13.3 is C-R i.e. Commercial & Residential.
The DP plan is shown below in Figure 1.3.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
4
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
Figure 1.3: DP plan
The project will be developed on total plot area of 42,542.79 sq.mt. After deducting
reservations, the effective net plot area comes about 27,696.68 sq.mt.The total Built-up area
planned on the site is 4, 17,835.01 sq. mt. The project involves construction of rehab & sale
buildings. Their details are given Table 1.1
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
5
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
Table 1.1: Project Description
Details Description
Total Plot area 42542.79 sq.mt.
Deductions 14846.11 sq.mt.
Net Plot area 27696.68 sq.mt.
Total Plot area 42542.79 sq.mt.
Permissible FSI 4
FSI consumed 162790.64 sq. mt.
Non FSI 255044.37 sq. mt.
Total Construction B.U.A 4,17,835.01 sq. mt.
Rehab Bldgs.
Rehab Bldg. No. 1 Gr. + 42nd Upper Floor
Rehab Bldg. No. 2 GR + 28th (Pt.) Floors.
Sale Building No. 1 (Tower 1, Tower 2 & Tower 3)
Tower 1 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor +10th to 79th
Upper Floor
Tower 2 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor + 10th to 40th
Upper Floor
Tower 3 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor +10th to 40th
Upper Floor
Project Infrastructures
i. Power Requirement:
Electricity will be sourced from Local Authority.
ii. Water Requirement:
Construction Phase
Total water requirement estimated is 150 KLD. The water demand will be met by local
authority and water tankers.
Operation Phase
Rehab:
Source: MCGM /Recycled water / RWH / tanker
Total Water Demand: 1939.00 KLD
Domestic: 1284.00 KLD
Flushing: 642.00 KLD
Gardening: 8.00 KLD
Car Washing: 5.00 KLD
Sale:
Source: MCGM /Recycled water / RWH / tanker
Total Water Demand : 529.00 KLD
Domestic: 342.00 KLD
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
6
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
Flushing: 171.00 KLD
Gardening: 8.00 KLD
Car Washing: 8.00 KLD
iii. Manpower Requirement:
Construction Phase
During the construction phase about 500 persons will be deployed on the site from nearby
places. Influx of these people was temporary in nature.
Operation Phase
On completion of the project, residents will occupy their property. Total population is expected
to be 16417.
iv. Wastewater Management:
Rehab Buildings: Total 1733.00 KLD of wastewater will be generated from the project site.
After recycling treated sewage will be used for flushing, gardening & car washing.
Sale Buildings: Total 461.00 KLD of wastewater will be generated from the project site. After
recycling treated sewage will be used for flushing, gardening & car washing.
v. Solid Waste Management
Construction Phase
During the construction phase, soak pits and septic tanks will be provided for disposal of waste
water. Temporary sanitary toilets will also be provided during peak labor force.
Operation Phase
Solid waste generated from the project will be segregated at source.
Rehab:
The total quantities of solid waste that will be generated in the project will be 6159 Kg/day.
Out of which 2529 Kg/day will be non-biodegradable and 3631 Kg/day will be biodegradable.
Sale:
The total quantities of solid waste that will be generated in the project will be 1639 Kg/day.
Out of which 673 Kg/day will be non-biodegradable and 966 Kg/day will be biodegradable.
Biodegradable waste will be treated in OWC. Non Bio-degradable waste will be handed over
to authorized local vendor for recycling.
vi. Noise
The construction noise localized, intermittent in nature. This has subsided with the completion
of the foundation work. The resultant ambient air noise levels will be within the tolerable levels.
The operation will be restricted to day time. Adequate measures taken to keep noise and
vibrations under control. No heat or light emission.
Background Study
Environmental Monitoring is planned for better understanding the baseline conditions and
pollution levels so that impacts can be assessed and addressed in environment management
plan. The detailed report will be furnished in EIA.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
7
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
a. Environmental Attributes
The baseline data collection will be carried out as per EIA notification 2006, CPCB guidelines
and EIA Guidelines Manuals 2010. Results will be depicted in EIA report.
b. Air Dispersion Modeling
Air Modeling will be carried out for dispersion assessment of pollutants from stack emissions.
Results will be depicted in the EIA report.
Safety
Employee’s safety is well maintained by good working practices. PPE will be provided to
workers during construction phase. A well-planned Security Service will be hired. The general
safety rules to be followed by all staff and workers will be documented and made aware to all
personnel by the Safety Officer.
Training will be given at a regular interval to the employees & workers in First Aid, Fire-
fighting, and for action during the emergencies. The records of all accidents will be maintained
and cause of the accident will be investigated and preventive measures will be taken to prevent
reoccurrences.
Portable Fire Extinguishers will be provided at prominent places. Signs indicators for all fire
safety, safe evacuation plan will be provided. Under ground water storage tank of adequate
capacity will be provided exclusively for Fire Fighting. On-site emergency plan will be in
place. Accordingly, Personal protection equipment will be given and use will be insisted.
Consulting Physician will be retained to attain the site. Safety measures will be considered in
storage and in transportation of construction materials as well.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
8
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
2. INTRODUCTION
The proposed project is SRA redevelopment by Omkar Realtors Projects Pvt.Ltd. The project
site is located on plot bearing C.S.No. 1(pt) , 2(pt) and 3(pt) of Lower Parel Division in
G/South Ward at G.B. Sakpal Marg and Babu Kamlakant Singh Marg, Dhobighat, Satrasta,
Mumbai-400011 for Shree Saibaba Nagar CHS ( Prop.) & other 7 Societies.
As per the Environment Impact Assessment (EIA) Notification dated 14th September 2006 as
amended, the proposed project falls under 'Category B1' with activity number '8'. The project
already received Environmental Clearance on 9th August, 2017 from SEIAA Maharashtra.
In the meantime the project got approval from SRA for additional land parcel to develop
wherein FSI of the subject project land was increased from 3.0 from 4.0. Due to increase in
FSI, there are certain changes or amendments in the project.Hence Construction B.U.A of the
project get increased from 1, 86,541.08 sq. mt. to 4, 17,835.01 sq. mt.
As per amendment in EIA Notification 2006 & its subsequent amendment dated 9th December,
2016, as the Total Construction Built-up area is ≥ 3, 00,000 sq.mt, the project will be treated
as Category “A” project of “Townships and Area Development projects” & requires
Environmental Clearance from the Expert Appraisal Committee (EAC), MoEF&CC, Delhi.
The EIA Report will be prepared based on the model Terms of References (ToR) given in
Environmental Impact Assessment Guidance Manual for building construction, townships and
area development projects by Ministry of Environment & Forests (MoEF & CC).
The baseline study was carried out for a study period of March 2016 – May 2016 for the earlier
EIA for which the project got Environmental Clearance on 9th August, 2017. For conduction
the EIA for proposed expansion the baseline study is still valid as per OM dated 29th August,
2017 issued by MoEF&CC.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
9
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
3. PROJECT DESCRIPTION
Omkar Realtors Projects Pvt.Ltd. is coming up with an expansion of SRA Scheme on plot
bearing C.S.No. 1(pt) , 2(pt) and 3(pt) of Lower Parel Division in G/South Ward at G.B. Sakpal
Marg and Babu Kamlakant Singh Marg, Dhobighat, Satrasta, Mumbai-400011 for Shree
Saibaba Nagar CHS ( Prop.) & other 7 Societies.The project site comes under Municipal
Corporation of Greater Mumbai (M.C.G.M). As per the Draft GDCR 2034, the development
allowed on this plot as per regulation No.13.2 & 13.3 is C-R i.e. Commercial & Residential.
The total cost of the project estimated is 1000 Cr.
The project will be developed on total plot area of 42,542.79 sq.mt. After deducting
reservations, the effective net plot area comes about 27,696.68 sq.mt.The total Built-up area
planned on the site is 4, 17,835.01 sq. mt. The project involves construction of rehab & sale
buildings. Their details are given Table 3.1 Table 1.1
Table 3.1: Project Description
Details Description
Total Plot area 42542.79 sq.mt.
Deductions 14846.11 sq.mt.
Net Plot area 27696.68 sq.mt.
Total Plot area 42542.79 sq.mt.
Permissible FSI 4
FSI consumed 162790.64 sq. mt.
Non FSI 255044.37 sq. mt.
Total Construction B.U.A 4,17,835.01 sq. mt.
Rehab Bldgs.
Rehab Bldg. No. 1 Gr. + 42nd Upper Floor
Rehab Bldg. No. 2 GR + 28th (Pt.) Floors.
Sale Building No. 1 (Tower 1, Tower 2 & Tower 3)
Tower 1 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor +10th to 79th
Upper Floor
Tower 2 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor + 10th to 40th
Upper Floor
Tower 3 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor +10th to 40th
Upper Floor
i. Location Details
Plot bearing C.S.No. 1(pt) , 2(pt) and 3(pt) of Lower Parel Division in G/South Ward at G.B.
Sakpal Marg and Babu Kamlakant Singh Marg, Dhobighat, Satrasta, Mumbai-400011 for
Shree Saibaba Nagar CHS ( Prop.) & other 7 Societies.
The geographical coordinates of the site are given below:
Latitude: 18058’56.13” N
Longitude: 72049’31.81” E
The project location on Google is shown Figure 3.1.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
10
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
Figure 3.1: Project Location
ii. Connectivity:
Project Connectivity is shown in Table 3.2.
Table 3.2: Project Connectivity
Places Aerial Distance
Mahalaxmi Railway Station 0.17 km
Chhatrapati Shivaji Int’l Airport 12.5 km
Kasturba Hospital 0.52 kms
Kenia & Anchor English School 1.10 kms
Tulsiwadi Police Station 0.20 kms
Byculla Fire Station 1.30 kms
(These are aerial distances as measured on Google Earth)
iii. Details of Alternative Site Considered
No alternative site is been considered for project development as it is an expansion
project.
iv. Project Area Details
Total Plot area 42542.79 sq.mt.
Deductions 14846.11 sq.mt.
Net Plot area 27696.68 sq.mt.
Total Plot area 42542.79 sq.mt.
v. Process Details
Not Applicable
vi. Flow Chart Showing Project Layout
Not Applicable.
vii. Power:
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
11
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
viii. Water:
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
ix. Manpower:
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
x. Raw Material Requirement
Not Applicable.
xi. Waste Management/ Disposal
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
Environmental Impact Assessment (EIA) is a well-planned process to predict the
environmental consequences of any kind of development, which is a result of human activities
and to suggest appropriate measures in order to reduce adverse effects and also to augment
positive effects. The EIA procures a rational and ethical approach for sustainable development.
However, it is more scientific process because it not only tells the past, present and the future
consequences of going on development, but also predicts the future events which likely to
change due to some reasons, In terms of the EIA notification of the MoEF dated 14th
September 2006, the generic structure of EIA documents shall be as under:-
Introduction
Project Description
Description of the Environment on the basis of Baseline data
Analysis of Alternatives (Technology & Site)
Anticipated Environmental Impact & mitigation Measures
Environmental Monitoring Program
Additional studies
Project benefits
Environmental Cost benefits Analysis
EMP
Summary & Conclusion
Disclosure of Consultant Engaged
CSR Activity
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
12
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
4. SITE ANALYSIS
i. Connectivity
Please refer for the details which are already given in Chapter 3 ‘Project Description’.
ii. Land form and Land Use
As per the DP Plan the site is under commercial and residential zone. The proposed project will
be residential & commercial in nature
iii. Land Ownership
Land ownership is with Omkar Realtors Projects Pvt. Ltd.
iv. Existing Land Use Pattern
As per the DP Plan the site is under commercial and residential zone. Presently slums exist on
the site.
v. Existing Infrastructure
The site surroundings are quite developed. The site has excellent connectivity in terms of Rail
and Road transport.
vi. Soil Classification
Not Available
vii. Climate data secondary source
The climate is tropical wet and dry climate. Most months of the rainy season are marked by
significant rainfall. Mumbai's climate can be best described as moderately hot with high level
of humidity. Its coastal nature and tropical location ensures temperatures won't fluctuate much
throughout the year. The mean maximum average temperatures in about 32 °C (90 °F) in
summer and 30 °C (86 °F) in winter, while the average minimums are 25 °C (77 °F) in summer
and 20.5 °C (68.9 °F) in winter. Mumbai experiences four distinct seasons: Winter (December–
Feb); Summer (March–May); Monsoon (June–Sep); and Post-Monsoon (Oct–Dec)
viii. Social Infrastructure Available
The social infrastructure surrounding project site is quite developed.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
13
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
5. PLANNING BRIEF
i. Planning Concept - SRA Project
ii. Population Projection - On completion of the project, total population is
expected to be 16417 Nos.
iii. Land use planning - As per the DP Plan the site is under commercial and
residential zone.
iv. Amenities or facilities
- Improved Residential Housing
- Improved Internal Roads
- Improved hygenic & sanitation conditions
- Balwadi, Welfare Centres & shops
- Onsite Solidwaste and wastewater treatment facility
- Installation of Rain Water Harvesting System
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
14
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
6. PROPOSED INFRASTRUCTURE
The proposed project is under SRA scheme. It provides a well-designed residential housing
and improved hygienic and sanitation conditions. Also, supporting development will take place
at the site. The project will also have better internal roads, provision of Rainwater Harvesting
system and onsite Sewage Treatment and solid waste treatment facility.
i. Residential area –
The project involves construction of rehab & sale buildings.
Rehab Bldgs.
Rehab Bldg. No. 1 Gr. + 42nd Upper Floor
Rehab Bldg. No. 2 GR + 28th (Pt.) Floors.
Sale Building No. 1 (Tower 1, Tower 2 & Tower 3)
Tower 1 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor +10th to 79th
Upper Floor
Tower 2 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor + 10th to 40th
Upper Floor
Tower 3 Basement + Gr.+ 1st to 6th Podium + 7th & 8th
Amenity Floor + 9th Service Floor +10th to 40th
Upper Floor
ii. Commercial area –
The commercial area will have Balwadi & welfare centers.
iii. Green belt –
RG area provided on ground is 2338.78 sq.mt.
iv. Drinking water Management
The water demand will be met by MCGM water supply.
v. Sewerage System
Sewage shall be send to the STP and treated sewage would be used for gardening and non-
potable purposes. STPs with suitable capacity with appropriate technology will be installed
depending on the site conditions and requirement.
vi. Industrial Waste Management
Not Applicable
vii. Solid Waste Management
Construction Waste: Please refer for the details which are already given in Chapter 1
‘Executive Summary’.
Waste Generated during Operation Phase: Please refer for the details which are already
given in Chapter 1 ‘Executive Summary’.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
15
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
viii. Power Requirement and Supply
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
16
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
7. REHABILITATION AND RESETTLEMENT PLAN
R & R activity will be carried out as per SRA Norms.
PFR For Proposed Expansion Slum Rehabilitation Scheme of “Shree Saibaba Nagar SRA Co-Op.
Hsg. Soc. (Prop.)” at Dhobighat, Satrasta, Mumbai” By M/s. Omkar Realtors Projects Pvt. Ltd. 2017
17
BE/ToR-Omkar_Expn.Dhobighat /017/003 Rev.00
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Project Schedule The project will be built over a period of approx. 10 years.
ii. Project cost estimates - Rs. 1000 Crores