PRE-FEASIBILITY REPORT

FOR

STONE QUARRY - 2.02 ha

VILLAGE - MOHADA, TALUKA – WANI DISTRICT – YAVATMAL

MR. DHARAMPRAKASH BHAWANISHANKAR PARASHAR

ENVIRO TECHNO CONSULT PVT.LTD. 68 , MAHAKALI NAGAR

MANEWADA YAVATMAL 440010

Page 2: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

PRE-FEASIBILITY REPORT EXECUTIVE SUMMARY

Mr. Dharamprakash Bhawanishankar Parashar proposes to extract stone metal from 2.02 ha from their Mohada site at Mohada village, Taluka – Wani of Yavatmal district. This lease is being worked for aggregate /stone – metal as building construction material.

There is a crusher unit over the lease area to ensure beneficiation of extracted stone for desired uses. Validity of lease is 5 years. Khasra nos. covering mineable deposits are 99, and are shown in Figure 1 .

Talathi Map

Mr. Dharamprakash Bhawanishankar Parashar is environmentally conscious and thus is aware of

latest rules & regulations of MOEF, New Delhi. Accordingly, it has started environmental monitoring in & around the lease area.

Page 3: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

CHAPTER 1

INTRODUCTION

This chapter contains brief information on the proposed project and its relevance to the region and the proponent.

The project:

Mr. Dharamprakash Bhawanishankar Parashar proposes to extract stone metal from an 2.02 ha lease area. Mining will be mechanical with drilling, blasting, loading and transportation within mine to the crushers equipped with screens, conveyors. Extracted basalt rocks will be properly beneficiated to products which will be aggregate of stones / stone metal ‘gitti’ of different sizes (12-20; 6-12 & 0-6 mm) and manufactured sand.

Proposed total production is 96 Brass/day which will need ROM @ 120 Brass/day (Inclusive of overburden & weathered rock).

Location: Lease is located at village boundary of Mohada in Wani taluka of Yavatmal district. This site has been selected and approved by Director Mining Geology, Maharashtra. This area is covered by Deccan traps and consists of basalt. Please see Plate 1.

Page 4: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

Figure -1: Location Map

Page 5: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

Justification of the project Demand for building material, road metal will be perpetual in Wani, around the selected site and for road. Site is located at 20 km distance from Wani and close to SH234 . Proposed project for production of material (sized stone metal) which is the basic raw material -input to road and building construction activities. Economics of these both activities depends on the lead to the user agency. Also, demand for ‘manufactured sand’ is growing as observed during market search. Extraction of basalt and its crushing will be compatible with ‘environmental setting’ and transportation of the ‘produce ‘from the site will be economical. This project ensures employment to almost 18 local persons. Many have been already employed and have adequate experience .In addition indirect in trades related to mining e.g. transportation, work shop will be available. Proponent: Name of Proponent Address Lease Details

(Village-S.No.) Lease Period

Production Brass/day

Mr. Dharamprakash Bhawanishankar Parashar

Mauze Mohada 99, 5 years 96 Brass/day

Page 6: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

CHAPTER 2

PROJECT DETAILS

It has been mentioned earlier that this project is for mining of stone metal from Khasra numbers 99,. These are parts of an 2.02 ha lease located near village Mohada in Wani taluka of Yavatmal district. This site is shown in Figure 1. Alternate sites Deposits in existing area were worked earlier by another agency. This area has been ear marked for quarrying stone metal. Mining has been permitted by Director, Geology & Mining. Lease is possession of proponent. There are no sensitive receptors around the lease. Proposed operations Dominant activities will be 1. Mechanical mining of ROM @ 120 Brass/day . 2. Production of marketable materials/ aggregate (0 -6, 6-12 & 12-20 mm) along with manufactured sand. 1. Mining: Mining will involve drilling, blasting, loading of mined materials into tippers, unloading the tipper into a jaw crusher, screening and segregation of materials of different sizes and transportation to destination. ROM will be @ 120 Brass/day . 2. The process It is estimated that about @96 Brass/day .ROM will yield about @ 120 Brass/day .of finished product- per month. Flow sheet of these operations is given below. Mine pit –transport on internal road –beneficiation plant-to sale Jaw crusher Vibratory feed secondary crusher 0-6mm 6-12mm 12-20mm

Mine pit Hopper Vibratory screen

Tertiary crusher

Vibratory screen

Page 7: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

Sr. No. Input to Sizes, mm 1. ROM to hopper 400-600 2. Secondary crusher 90-120 3. Vibratory screen 0-40 4. Tertiary crusher 40

FIGURE 4 Process is shown in Figure 4

Page 8: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

Probable environment –concerns during are schematically shown below:

All sources will be fugitive. These will be located over 2.02 ha area. Blasting & drilling will be below ground level.

MINING – Fugitive PM emissions

Controlled blasting as per DGMS norms’ Water sprinkling Macadamized roads

Material handling Hopper Crushers Vibratory screens Conveyors

Water sprinkling in hopper & crusher

Closed conveyor Closed vibratory screens

Drilling

Blasting

Page 9: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

CHAPTER 3 SITE ANALYSIS

3.0 The site is near village Mohada. It is about 20 km from Wani. It is connected by Velabai Purad Highway.

Name of Village Mohada Taluka , District And State Wani , Yavatmal , Maharastra Longitude N19°52’26.7″ Lattitude E78°57′32.7″ Altitude 242 m Any Forest, River, Water body etc 5 km

Page 10: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

CHAPTER 4 CONCLUSIONS

4.0 It has been stated that Mr. Dharamprakash Bhawanishankar Parashar are already operating a composite project involving basalt rock mining with opencast highly mechanized mine working. It has established a regular infrastructure with adequate capacity. 4.1 Present production cost is about Rs. 300 per/ MT on an average. Capital investment is Rs.55-60 lacs. It is expected that some additional investment may be necessary as per the requirement in near future. Present working is for single shift. 4.2 Mr. Dharamprakash Bhawanishankar Parashar project has provided employment to 18 persons at present. 4.3 It can thus be concluded that the project is environmentally compatible, financially viable and would be in the interest of construction industry thereby indirectly benefiting the masses. Moreover employment to local people will be an additional advantage.

Page 11: PFR Parashar 99 - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/... · Microsoft Word - PFR Parashar 99 Author: Hp Created Date: 10/22/2018 10:12:35

CHAPTER 5

Environmental impacts due to existing & proposed activities

5.0 Maharshtra State Environment Appraisal Committee has desired estimation of environmental impacts due to existing and also the proposed activities during a project. Main activity at the site at Mohada has been stone quarrying and crushing . This report includes information on impacts on land, ambient air, noise levels,water and partly socio-economic status. 5.1 Environmental setting : This lease area of 2.02 ha is part of rugged topography. Area is a part of Deccan traps.

Soil & murrum layer is 0.5-1.5m and are underlain by hard basalt up to 10-20m.

Tree cover is scanty and there are habitations within 0.5 km from the site. Sensitive ecosystems do not exist