PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review Mar Capeans CERN PH-DT, May 22 nd 2013

Upload: gad

Post on 07-Jan-2016

18 views

Category:

Documents


0 download

DESCRIPTION

PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review. Mar Capeans CERN PH- DT, May 22 nd 2013. DT FSU A.Kerhli , M.Carrichon , J.Dumollard , G.Lacroix , B.Marichy , A.Laassiri , G.Crepet , H.Sabba , H.Martinati. PH-DT/DI Section Focus. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

PH-DT Detector InfrastructureInstrumentation and Controls

MSS2 electronics review

Mar CapeansCERN PH-DT, May 22nd 2013

Page 2: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

2

DT FSUA.Kerhli, M.Carrichon, J.Dumollard,

G.Lacroix, B.Marichy, A.Laassiri, G.Crepet, H.Sabba, H.Martinati

Page 3: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

PH-DT/DI Section Focus• Construction of detector and experiment infrastructures and dedicated M&O services

(e.g. on-call)

• Development to ensure that infrastructures perform and are technologically up to date

• Contribution to shorter term projects (pilot projects to validate larger developments)

Gas systems

LHC M&O~25 Gas systems

CLOUDNA62

Beam Test AreasLinac4…

Cooling systems

LHC M&O

CO2 plants (ATLAS IBL and CMS Pix)

ATLAS IBL SR1 and UNIGECMS Lab

LHCb beam test …

Instrumentation and Controls

LHC M&O (MCP)

ATLAS ALFA, TOTEM, NA62, ArDM, AEGIS…B-field measurements

Page 4: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

Magnet Related Activities in PH-DT

• The Magnet Control Project (MCP) was initiated in 1998 with the goal of producing an integrated system for controlling, protecting and analyzing data for the large magnets in the LHC experiments. Common hardware and software have been designed to facilitate the maintenance and operation.

– Today’s Mandate: Preventive and corrective maintenance of MCP systems, On-Call interventions, planning of maintenance tasks during shutdowns. Maintenance of the control software and implementation of PVSS modifications as requested by main users.

• The B-field measurements service provides technical support for magnetic field measurements and calculations, and develops new sensors, readout applications and data analysis techniques for this activity.

• The group has a considerable level of technical expertise in constructing magnets, however due to retirements and transfer of staff it has lost the design and engineering capabilities.

Page 5: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

MCP Team

• Currently the MCP team is composed of a project leader and fractions of DT technical staff, who contribute to other projects in DT

– 80% Project leader– 50% Tech as CMS and LHCb expert, and responsible of MCP On-Call Service– 50% Tech as ALICE expert– 80% Tech as ATLAS expert– 50% Controls engineer

• The team runs an On-Call service 24/7, assisted by DSS and magnet experts from the LHC experiments.

• 4 FTE from the PH-02 Field Support Unit are dedicated in average to the project

Page 6: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

MSS2Hands-on electronics review

• MCP is run by a small team in charge the maintenance and operation of the control and safety systems of the experimental magnets installed in 4 LHC experiments

• These control and safety systems were developed by the team more than a decade ago; they are based in standard and industrial controls and instrumentation, like PLC logic for the control and FPGA for safety. These systems include some electronic development, mainly related to the magnet safety system for superconducting magnet quench detection.

• The current systems has been working fine during the LHC operation, however they start to be rather old, some electronic components are obsolete, and new control & instrumentation technologies offer more possibilities.

• An upgraded system is now being developed in PH-DT, which includes the electronic interface for the quench detection and temperature measurements. A prototype is currently in production, based on team’s experience and also technology transfer between CERN experts.

• Small magnets (M1 and Compass) will be equipped with the upgraded safety systems in 2013. Based on the operational experience in these 2 projects, the new system will be proposed to the LHC experiments (if possible, still during LS1)

• The aim of this review is to get a second opinion on the electronics aspects of the new MSS2 system from 'outside' electronic experts in order to validate the prototype system and to be able move to the next project phase (construction of systems for LHC).

Page 7: PH-DT Detector Infrastructure Instrumentation and Controls MSS2 electronics review

to all the MCP team,and the reviewer(s)!