  • 7/22/2019 Phantom Load Manual

    1/52

    INSTRUCTION MANUAL

    FOR

    PHANTOM LOAD

    MODEL PA-2505 & PA-2505K

    It is essential that this instruction book be read thoroughly before putting the equipment in service

    4271 Bronze Way Dallas Texas 75237-1088 USA Phone (214) 330 3201

  • 7/22/2019 Phantom Load Manual

    2/52

    Revision History

    Revision ECN Number Date

    0 Initial Release1 28917 2-7-012 30834 1-30-08

    IMPORTANT

    The information and data contained within this instruction manual are the proprietary with Megger. The equipment described herein maybe protected by one or more US letters patent. Megger specifically reserves to itself all rights to such proprietary information as well as all

    rights under any such patent, none of which is waved by submission of this instruction manual to anyone.

    The recipient, if a Government agency acknowledges that this instruction book and the equipment described were procured with LimitedRights to technical data as described to ASPR 0-203 (b).

    Copyright Megger , 2008.

    P/N 12459ii

  • 7/22/2019 Phantom Load Manual

    3/52

    ContentsINTRODUCTION TO TESTING WATTHOUR METERS....................................................................... I

    INTRODUCTION TO TESTING WATTHOUR METERS II ...............................................................IICHARTS / TABLES .................................................................................................................................. 1SAFETY PRECAUTIONS......................................................................................................................... 6THEORY OF OPERATION....................................................................................................................... 7INSTALLATION INSTRUCTIONS.......................................................................................................... 9OPERATING INSTRUCTIONS.............................................................................................................. 10SERVICE AND REPAIR DATA............................................................................................................. 13SCHEMATIC DIAGRAM ....................................................................................................................... 15

    P/N 12459iii

  • 7/22/2019 Phantom Load Manual

    4/52

    CHARTS/TABLESCONSTANT TABLE FOR REFERENCE STANDARDS

    WITHBASIC Kh OF 6/10

    Constant For Potential Coil Of:

    Current CoilAmperes

    120 Volts 240 Volts 480 Volts

    1 0.12 0.24 0.48

    1.5 0.18 0.36 0.95 0.6 1.2 2.4

    12.5 1.5 3.0 6.0

    15 1.8 3.6 7.250 6.0 12.0 24.0

    CONSTANT TABLE FOR REFERENCE STANDARDS

    WITHBASIC Kh OF 1/3

    Constant For Potential Coil Of:

    Current Coil

    Amperes

    120 Volts 240 Volts 480 Volts

    1 1/15 2/15 4/15

    1.5 1/10 1/5 2/5

    5 1/3 2/3 1-1/3

    12.5 5/6 1-2/3 3-1/315 1 2 4

    50 3-1/3 6-2/3 13-1/3

    P/N 124591

  • 7/22/2019 Phantom Load Manual

    5/52

    Reference Standard

    Reference Standard Kh = 0.6 on 120 Volt, 5 Amp Coils

    Meter Under Test Full Load (100%) Light Load (10%)

    KhRated

    or

    TestAmps

    Number

    of

    Stators120V 240V

    Std.

    current

    Coil

    Rev.

    Mtr.

    Rev.

    Std.

    Std.

    Current

    Coil

    Rev.

    Mtr.

    Rev.

    Std.

    2.5 1 0.3 0.6 5.0 20 10.00 1 1 2.50

    5.0 1 0.6 1.2 5.0 20 20.00 1 1 5.0015.0 1 1.8

    3.0

    3.6

    6.0

    12.515.0

    12.5

    15.0

    2020

    10

    10

    24.0020.00

    20.00

    16.67

    1

    1

    1

    1

    15.00

    25.00

    30.0

    (or

    50)

    1 ---

    6.0

    7.2

    12.0

    14.4

    50.0

    50.0

    50.0

    20

    20

    20

    12.00

    20.0024.00

    5

    55

    1

    11

    6.00

    10.0012.00

    2.5 2 1.2 2.4 5.0 20 20.00 1 1 5.00

    5.0 2 2.4 4.8 5.0 10 20.00 1 1 10.00

    15.0 2 7.2 14.4 12.515.0

    1010

    24.0020.00 1 1 30.00

    30.0 2 14.4 28.8 50.0 10 12.00

    2.5 3 1.8 3.6 5.0 20 20.00 1 1 5.00

    5.0 3 3.6 7.2 5.0 10 20.00 1 1 10.00

    15.0 3 10.8 21.6 12.515.0

    1010

    24.0020.00 1 1 30.00

    30.0 3 21.6 43.2 50.0 10 12.00 5 1 12.00

    2.5 4 1.8 3.6 5.0 20 15.00 1 1 3.75

    5.0 4 3.6 7.2 5.0 10 15.00 1 1 7.50

    15.0 4 10.8 21.6 12.515.0

    1010

    18.0015.00 1 1 22.50

    30.0 4 21.6 43.2 50.0 10 9.00 5 1 9.00

    The above data are based on single-phase test, series connection.

    P/N 124592

  • 7/22/2019 Phantom Load Manual

    6/52

    Reference Standard Kh = 1/3 on 120 Volt, 5 Amp Coils

    Meter Under Test Full Load (100%) Light Load (10%)

    KhRatedor

    Test

    Amps

    Numberof

    Stators120V 240V

    Std.current

    Coil

    Rev.Mtr.

    Rev.Std.

    Std.Current

    Coil

    Rev.Mtr.

    Rev.Std.

    2.5 1 0.3 0.6 5.0 20 18.00 1 1 4.50

    5.0 1 0.6 1.2 5.0 20 36.00 1 1 9.00

    15.0 1 1.8

    3.0

    3.6

    6.0

    12.515.012.5

    15.0

    202010

    10

    43.2036.0036.00

    30.00

    1

    1

    1

    1

    27.00

    45.00

    30.0

    (or

    50)

    1 ---

    6.0

    7.2

    12.0

    14.4

    50.0

    50.0

    50.0

    20

    20

    20

    21.60

    36.00

    43.20

    5

    5

    5

    1

    1

    1

    10.80

    18.00

    21.60

    2.5 2 1.2 2.4 5.0 20 36.00 1 1 9.00

    5.0 2 2.4 4.8 5.0 10 36.00 1 1 18.0015.0 2 7.2 14.4 12.5

    15.01010

    43.2036.00 1 1 54.00

    30.0 2 14.4 28.8 50.0 10 21.60

    2.5 3 1.8 3.6 5.0 20 36.00 1 1 9.00

    5.0 3 3.6 7.2 5.0 10 36.00 1 1 18.00

    15.0 3 10.8 21.6 12.5

    15.0

    10

    10

    43.20

    36.00 1 1 54.00

    30.0 3 21.6 43.2 50.0 10 21.60 5 1 21.60

    2.5 4 1.8 3.6 5.0 20 27.00 1 1 6.75

    5.0 4 3.6 7.2 5.0 10 27.00 1 1 13.50

    15.0 4 10.8 21.6 12.5

    15.0

    10

    10

    32.40

    27.00 1 1 40.50

    30.0 4 21.6 43.2 50.0 10 16.20 5 1 16.20

    The above data are based on single-phase test, series connection.

    P/N 124593

  • 7/22/2019 Phantom Load Manual

    7/52

    WATTHOUR METER ACCURACY CALCULATOR

    When using a rotating standard, the accuracy of the meter under test can be evaluated using the formula

    100R

    R1A

    =

    R1 = calculated number of revolutions of rotating standard for 100% accuracy

    R = actual number of revolutions of rotating standard during the test

    The following scales give the percent accuracy (A, lower level) for various actual number of revolutions

    (R, upper scale). Calculated numbers of revolutions (R1) are listed to the left of each scale.

    P/N 124594

  • 7/22/2019 Phantom Load Manual

    8/52

    P/N 124595

  • 7/22/2019 Phantom Load Manual

    9/52

  • 7/22/2019 Phantom Load Manual

    10/52

    THEORYOFOPERATIONDISCRIPTION OF CONTROLS

    3A FUSE Provides overload and short circuit protection for the test set.

    3/4A FUSE Located internally, this fuse provides additional overload and short

    circuit protection to the 480 volt input circuit of the phantom load.

    TEST CURRENT SWITCH Selects the desired range of full load or light load test current that

    will be applied to the meter under test and to the current coils of

    the reference standard. Selections are arranged so that full loadsand corresponding light load values (10% of full load) are side by

    side to minimize switching.

    OUTPUT ON/OFF SWITCH Allows the output current to be switched off without disturbing anysettings.

    CURRENT CONTROL Adjusts the output current of the Phantom Load from Zero to the

    maximum value as selected by the TEST CURRENT SWITCH.

    BURDEN SWITCH Used to compensate for variations of load impedance in the testing

    circuit. Normally used in the low position, this switch would be

    changed to high whenever the desired test current could not beobtained with the CURRENT CONTROL in the full clockwise

    position.

    POWER FACTOR SWITCH Determines whether the full load tests current is at either unity

    (1.0) or 50% (0.5) power factor.

    AMMETER Measures the value of output current. Appropriate full scale range

    is simultaneously selected by the TEST CURRENT SWITCH.

    The meter scale of the phantom load reads from "0 to 1.0'' so that

    the actual measured current is equal to the reading of the meter

    times the setting of the 'TEST CURRENT SWITCH. For example:

    If the TEST CURRENT. SWITCH is in the 50 amp position andthe meter reads 0.6, the actual output current is 30 amperes (50 X

    0.6 = 30).

    P/N 124597

  • 7/22/2019 Phantom Load Manual

    11/52

    CURRENT TERMINALS Five output CURRENT TERMINALS (, 50, 15, 5 and 2.5 amp)eliminate lead changing when used in conjunction with a reference

    standard having multiple current coil terminals (such as the

    General Electric type IB-10, Sangamo type J-44 or States typeSSS-50 solid-state standard).

    POTENTIAL TERMINALS The test set can operate from any of the five rated input and the

    common () POTENTIAL TERMINALS. Connect the input tothe common () terminal and the line voltage being used to the

    properly rated terminal.

    P/N 124598

  • 7/22/2019 Phantom Load Manual

    12/52

    INSTALLATIONINSTRUCTIONSREFERENCE STANDARD AND PHANTOM LOAD

    Set a reference standard near the phantom load. Connect the current and potential leads to the referencestandard as illustrated in the CONNECTION DIAGRAMS and as outlined below:

    CURRENT CIRCUIT

    1. Connect the long, red, heavy lead to the terminal on the phantom load and the long, black,heavy kid to the or 0 terminal of the standard.

    2. Connect the short, heavy lead from the 50 ampere terminal of the phantom load to theappropriate current coil of the reference standard.

    3. Connect the short, light leads from the remaining CURRENT TERMINALS of the phantom loadto the matching current terminals of the reference standard.

    POTENTIAL CIRCUIT

    Connect the combination input power / potential click switch leads to the potential terminals of the

    reference standard and the POTENTIAL TERMINALS located along the left edge of the phantom load.Be sure to observe polarity and to use the properly rated terminal of the phantom load for the line

    voltage being utilized.

    If the reference standard being used is the solid state type, connect the auxiliary power leads as shownon the connection diagram.

    During testing it will be necessary to set the voltage selector switch of the reference standard to theappropriate test potential being used.

    LINE CIRCUIT

    Connect the potential (input) leads from the phantom load to the line as illustrated on the connectiondiagram. Be certain the potential select switch of the reference standard matches the line voltage.

    P/N 124599

  • 7/22/2019 Phantom Load Manual

    13/52

    OPERATINGINSTRUCTIONS1. INITIAL SETUP

    CONTROL POSITION

    TEST CURRENT SWITCH OFF

    OUTPUT SWITCH ONCURRENT CONTROL 0 (FULL CCW)

    POWER FACTOR SWITCH 1.0

    BURDEN SWITCH LOW

    2. Connect the meter to be tested and the reference standard as shown on the appropriateconnection diagram and as described under INSTALLATION INSTRUCTIONS in this manual.

    Note: Be sure to use the proper primary terminal of the phantom load for the line voltage beingused.

    3. Set the voltage selector switch of the reference standard to the appropriate value for the testpotential being used.

    FULL LOAD TEST

    4. Set the TEST CURRENT SWITCH to the appropriate range to obtain the desired full load testcurrent.Note: Always use the lowest range capable of providing the desired test current.

    5. Rotate the CURRENT CONTROL clockwise until the desired test current is reached.NOTES:

    a. The meter scale of the phantom load reads from "0 to 1.0" so that the actualmeasured current is equal to the reading of the meter times the setting of theTEST CURRENT SWITCH. For example: If the TEST CURRENT SWITCH is

    in the 5 ampere position and the meter reads 0.6, the actual output current is 3

    amperes (5 X 0.6 = 3).

    b. If the desired test current is not reached at full clockwise rotation of theCURRENT CONTROL, return the CURRENT CONTROL to "0" (full

    counterclockwise position), move the BURDEN SWITCH to the high position

    and repeat Step 5.

    6. Reset the reference standard to zero.

    P/N 1245910

  • 7/22/2019 Phantom Load Manual

    14/52

    7. Initiate the FULL LOAD TEST by turning the potential click switch on when the black mark onthe edge of the meter disk passes a stationary reference point. This starts the reference standard

    by energizing its potential coil.

    If the meter under test or the reference standard runs backwards, reverse either thepotential or current connections to the backwards unit. Note that a solid state standard

    will not count if the polarity to one of its coils is reversed.

    8. Count the number of disk rotations by watching the black mark pass the reference point.9. Stop the test when, the desired number of revolutions have been made by turning the potential

    click switch off. This stops the reference standard by de-energizing its potential coil.

    10.Using the WATTHOUR METER TEST FORMULAS in this manual calculate % accuracy of themeter.

    POWER FACTOR TEST

    11.Same as steps 1 - 10, except, set the POWER FACTOR SWITCH to "0.5".

    LIGHT LOAD TEST

    12.Same as steps 1 - 10, except:Step 4: Set the TEST CURRENT SWITCH to the required appropriate range to obtain

    the desired light load current.

    WATTHOUR METER TEST FORMULAS

    The following formula should be used to calculate the reference standard revolutions (R).

    ( )

    ( )

    =

    elementsmeter5

    coilcurrentstd.120

    coilpot.std.0.6

    Khmeterunder testmeterofsRevolutionR

    To find the accuracy of any meter, the following formula is used:

    100

    standardofsrevolutionactual

    standardofsrevolutioncalculatedmetertheofaccuracy%

    =

    DEMAND METER TEST

    When testing mechanical demand registers the following formula is used. The reference standard KW isused to compare against the register's KW in order to determine register accuracy.

    P/N 1245911

  • 7/22/2019 Phantom Load Manual

    15/52

    =

    1000

    srevolutionstandardelementsmeter5

    coilcurrentstd.

    120

    coilpot.std.0.6TI

    KW

    The following formula will give the demand register's KW when counting the disk revolution of the

    meter under test. This method uses the watt-hour meter revolutions to control the test duration and the

    demand register KW will be as calculated,

    = 1000

    srevolutionmeterTIKhmeterKW

    =

    intervalimeregister t

    minutes60)Increments(TimeTI

    P/N 1245912

  • 7/22/2019 Phantom Load Manual

    16/52

  • 7/22/2019 Phantom Load Manual

    17/52

    Warranty

    Megger warrants to the original purchaser that the product is free from defects in material andworkmanship for a period of one (1) year from date of shipment. This warranty is limited and shall not

    apply to equipment which has damage, or cause of defect, due to accident, negligence, improper

    operation, faulty installation by purchaser, or improper service or repair by any person, company orcorporation not authorized by the Megger.

    Megger will, at its option, either repairs or replaces those parts and/or materials that it deems to bedefective. Any costs incurred by the purchaser for the repair or replacement of such parts and / or

    materials shall be the sole responsibility of the original purchaser.

    THE ABOVE WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EITHER

    EXPRESSED OR IMPLIED ON THE PART OF THE MEGGER, AND IN NO EVENT SHALL

    MEGGER BE LIABLE FOR THE CONSEQUENTIAL DAMAGES DUE TO THE BREACH

    THEREOF.

    P/N 1245914

  • 7/22/2019 Phantom Load Manual

    18/52

    SCHEMATIC DIAGRAM

    P/N 1245915

  • 7/22/2019 Phantom Load Manual

    19/52

    P/N 1245916

  • 7/22/2019 Phantom Load Manual

    20/52

    P/N 1245917

  • 7/22/2019 Phantom Load Manual

    21/52

    P/N 1245918

  • 7/22/2019 Phantom Load Manual

    22/52

  • 7/22/2019 Phantom Load Manual

    23/52

    P/N 1245920

  • 7/22/2019 Phantom Load Manual

    24/52

    P/N 1245921

  • 7/22/2019 Phantom Load Manual

    25/52

    P/N 1245922

  • 7/22/2019 Phantom Load Manual

    26/52

    P/N 1245923

  • 7/22/2019 Phantom Load Manual

    27/52

    P/N 1245924

  • 7/22/2019 Phantom Load Manual

    28/52

    P/N 1245925

  • 7/22/2019 Phantom Load Manual

    29/52

    P/N 1245926

  • 7/22/2019 Phantom Load Manual

    30/52

    P/N 1245927

  • 7/22/2019 Phantom Load Manual

    31/52

    P/N 1245928

  • 7/22/2019 Phantom Load Manual

    32/52

    P/N 1245929

  • 7/22/2019 Phantom Load Manual

    33/52

    P/N 1245930

  • 7/22/2019 Phantom Load Manual

    34/52

    P/N 1245931

  • 7/22/2019 Phantom Load Manual

    35/52

    P/N 1245932

  • 7/22/2019 Phantom Load Manual

    36/52

    P/N 1245933

  • 7/22/2019 Phantom Load Manual

    37/52

    P/N 1245934

  • 7/22/2019 Phantom Load Manual

    38/52

    P/N 1245935

  • 7/22/2019 Phantom Load Manual

    39/52

    P/N 1245936

  • 7/22/2019 Phantom Load Manual

    40/52

    P/N 1245937

  • 7/22/2019 Phantom Load Manual

    41/52

    P/N 1245938

  • 7/22/2019 Phantom Load Manual

    42/52

    P/N 1245939

  • 7/22/2019 Phantom Load Manual

    43/52

    P/N 1245940

  • 7/22/2019 Phantom Load Manual

    44/52

    INDEX

    Ammeter 7

    Burden Switch ... 7, 10

    CHARTS 1

    Controls 7

    Ammeter 7

    Burden Switch .. 7

    Cuurent Control .. 7

    Current Terminals .. 8Fuse .. 7

    ON/OFF Switch ... 7

    Potential Terminals . 8

    Power Factor Switch 7

    Test Current Switch 7

    Current Control 7, 10

    Current Terminals 8, 9

    DEMAND METER TEST 11

    DESCRIPTION OF CONTROLS 7

    FULL LOAD TEST .. 10

    Fuse .. 7

    Introduction to Testing Watt-hour Meters .. I, II

    LIGHT LOAD TEST .. 11

    ON/OFF Switch 7,10

    Operating .. 10

    Burden Switch .. 10

    Current Control ... 10

    ON/OFF Switch 10

    Power Factor Switch . 10,11

    Test Current Switch .. 10,11

    Potential Terminals ... 8,9

    Power Factor Switch . 7,10,11

    POWER FACTOR TEST . 11Reference Standard 7,11

    SCHEMATIC DIAGRAM 15

    Service and Repair Order Instructions 13

    Servicing .. 13

    TABLES .. 1

    Test Current Switch 7,10,11

    Warranty Statement ... 14

    WATTHOUR METER TEST FORMULAS 11

    P/N 1245941

  • 7/22/2019 Phantom Load Manual

    45/52

  • 7/22/2019 Phantom Load Manual

    46/52

  • 7/22/2019 Phantom Load Manual

    47/52

  • 7/22/2019 Phantom Load Manual

    48/52

  • 7/22/2019 Phantom Load Manual

    49/52

  • 7/22/2019 Phantom Load Manual

    50/52

  • 7/22/2019 Phantom Load Manual

    51/52

  • 7/22/2019 Phantom Load Manual

    52/52