phare aeronautical telecommunication network: patn

17
CENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron By Gérard Mittaux-Biron PATN Project Leader PATN Project Leader CENA CENA

Upload: brent

Post on 12-Jan-2016

33 views

Category:

Documents


1 download

DESCRIPTION

C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE. PHARE Aeronautical Telecommunication Network: PATN. By Gérard Mittaux-Biron PATN Project Leader CENA. What is PATN ?. PATN is an implementation of the ATN that supported data-link communications for the 3rd PHARE Demonstration - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PHARE Aeronautical Telecommunication Network: PATN

11

CENTRE D'ETUDESDE LA NAVIGATIONAERIENNE

PHARE Aeronautical Telecommunication Network:

PATN

PHARE Aeronautical Telecommunication Network:

PATN

By Gérard Mittaux-BironBy Gérard Mittaux-Biron

PATN Project LeaderPATN Project Leader

CENACENA

Page 2: PHARE Aeronautical Telecommunication Network: PATN

22

What is PATN ?What is PATN ?

PATN is an implementation of the ATN that PATN is an implementation of the ATN that supported data-link communications for the 3rd supported data-link communications for the 3rd PHARE DemonstrationPHARE Demonstration

PATN is a collaborative work, carried out by:PATN is a collaborative work, carried out by: CENA in France,CENA in France, DERA/NATS in the United Kingdom,DERA/NATS in the United Kingdom, DLR in Germany,DLR in Germany, EEC for Eurocontrol,EEC for Eurocontrol, NLR in the Netherlands.NLR in the Netherlands.

Page 3: PHARE Aeronautical Telecommunication Network: PATN

33

PATN Infrastructure: Inter-connection of ATN routersPATN Infrastructure: Inter-connection of ATN routers

SITA X.25 Network

Transpac X.25 Network

Page 4: PHARE Aeronautical Telecommunication Network: PATN

44

DERA/NATS

DERA/NATS

NLR

CENA ATH

CENA TLS

EEC

EEC

NLRSITA X.25 Network

Transpac X.25 Network

PATN Infrastructure: Inter-connection of ATN routersPATN Infrastructure: Inter-connection of ATN routers

Page 5: PHARE Aeronautical Telecommunication Network: PATN

55

PATN Infrastructure:PATN Infrastructure:

DERA/NATS

DERA/NATS

NLR

CENA ATH

CENA TLS

EEC

EEC

NLR

The end-systemsThe end-systems

SITA X.25 Network

Transpac X.25 Network

Page 6: PHARE Aeronautical Telecommunication Network: PATN

66

Data-Link Services supported by PATNData-Link Services supported by PATN

Downlinking of Aircraft Parameters (DAP)Downlinking of Aircraft Parameters (DAP) Frequency Change (FC)Frequency Change (FC) Position Reporting (PR)Position Reporting (PR) Trajectory Negotiation (TN)Trajectory Negotiation (TN)

Page 7: PHARE Aeronautical Telecommunication Network: PATN

77

Main Phases of the PATN ProjectMain Phases of the PATN Project

PATN in stand-by during the external development of PATN in stand-by during the external development of the ATN Router by the EURATN projectthe ATN Router by the EURATN project

Development of ATN Upper-LayersDevelopment of ATN Upper-Layers Development of PATN Application Service ElementsDevelopment of PATN Application Service Elements Deployment of the PATN infrastructure:Deployment of the PATN infrastructure:

RoutersRouters PATN end systemsPATN end systems

Integration in the air and ground platforms of the Integration in the air and ground platforms of the partnerspartners

Page 8: PHARE Aeronautical Telecommunication Network: PATN

88

Technical Choices for PATNTechnical Choices for PATN

Compliance with International Civil Aviation Compliance with International Civil Aviation Organisation (ICAO) standards for the Organisation (ICAO) standards for the Aeronautical Telecommunication Network Aeronautical Telecommunication Network whenever applicablewhenever applicable

Aeronautical Mobile Satellite Services (AMSS) Aeronautical Mobile Satellite Services (AMSS) retained as the mobile subnetwork for air-retained as the mobile subnetwork for air-ground communicationsground communications

Page 9: PHARE Aeronautical Telecommunication Network: PATN

99

PATN Approach to DevelopmentsPATN Approach to Developments

Use of the EURATN routerUse of the EURATN router Use of commercial off-the-shelf industrial productsUse of commercial off-the-shelf industrial products

ATN Upper-LayersATN Upper-Layers

ICAO Standard ATN application:ICAO Standard ATN application: Controller-Pilot Data-Link CommunicationsController-Pilot Data-Link Communications

PHARE-Specific applications:PHARE-Specific applications: Downlinking of Aircraft Parameters ; Position Reporting ; Downlinking of Aircraft Parameters ; Position Reporting ;

Trajectory NegotiationTrajectory Negotiation

Access to the mobile subnetwork:Access to the mobile subnetwork: Interface between AMSS avionics and PATN workstationsInterface between AMSS avionics and PATN workstations

Page 10: PHARE Aeronautical Telecommunication Network: PATN

1010

PATN Spin-OffsPATN Spin-Offs

ATN ValidationATN Validation AATMS project with the involvment of DERA AATMS project with the involvment of DERA

and NLRand NLR CHARME project for CENACHARME project for CENA

Page 11: PHARE Aeronautical Telecommunication Network: PATN

1111

ATN ValidationATN Validation

First prototype implementation of ATN upper-layers First prototype implementation of ATN upper-layers communication servicescommunication services

Agreement between PHARE and an industrial partner:Agreement between PHARE and an industrial partner: The PATN upper-layers were re-engineered as an industrial The PATN upper-layers were re-engineered as an industrial

productproduct PATN partners are entitled free source and binary licencesPATN partners are entitled free source and binary licences Free maintenance on the ATN upper-layers productFree maintenance on the ATN upper-layers product

First deployment of a full-stack ATN infrastructure with First deployment of a full-stack ATN infrastructure with air and ground componentsair and ground components

Kernel of an ATN infrastructure for the PATN partnersKernel of an ATN infrastructure for the PATN partners

Page 12: PHARE Aeronautical Telecommunication Network: PATN

1212

AATMS ProjectAATMS Project

Validation of advanced Flight Management SystemsValidation of advanced Flight Management Systems Implementation of a data-link infrastructure:Implementation of a data-link infrastructure:

Adapted ATN based on PATNAdapted ATN based on PATN Connection of:Connection of:

DERA BAC 1-11 experimental aircraftDERA BAC 1-11 experimental aircraft NLR Cessna Citation experimental aircraftNLR Cessna Citation experimental aircraft AATMS ground infrastructureAATMS ground infrastructure

Transparently « switchable » access to:Transparently « switchable » access to: Aeronautical Mobile Satellite Services (AMSS)Aeronautical Mobile Satellite Services (AMSS) VHF Digital Link (VDL) mode 2VHF Digital Link (VDL) mode 2

Page 13: PHARE Aeronautical Telecommunication Network: PATN

1313

CHARME ProjectCHARME Project

Experimental ATN platform of the French DGACExperimental ATN platform of the French DGAC Support of data-link experimentations, such as:Support of data-link experimentations, such as:

EOLIA (European pre-operational data-link application)EOLIA (European pre-operational data-link application) COCLICO (internal CENA project on the co-operation of COCLICO (internal CENA project on the co-operation of

collaborative tools and data-link for the control)collaborative tools and data-link for the control)

Contribution to the validation of the ICAO standards for Contribution to the validation of the ICAO standards for the ATN:the ATN: Future data-link applicationsFuture data-link applications ATN Security & System ManagementATN Security & System Management Connectionless ATN servicesConnectionless ATN services

Page 14: PHARE Aeronautical Telecommunication Network: PATN

1414

Existing PATN EnhancementsExisting PATN Enhancements

For AATMS:For AATMS: access to VDL mode 2access to VDL mode 2 Automatic Dependent Surveillance (ADS) Automatic Dependent Surveillance (ADS)

applicationapplication For CHARME:For CHARME:

Automatic Dependent Surveillance (ADS) Automatic Dependent Surveillance (ADS) application and ADS Report Forwardingapplication and ADS Report Forwarding

Flight Information Services (FIS) applicationFlight Information Services (FIS) application Context Management applicationContext Management application

Page 15: PHARE Aeronautical Telecommunication Network: PATN

1515

Experimental ResultsExperimental Results

Requirements per aircraft for the PD/3 scenario:Requirements per aircraft for the PD/3 scenario: 100 bytes every 10 seconds for Position Reporting100 bytes every 10 seconds for Position Reporting up to 3000 bytes for a Trajectory Negotiationup to 3000 bytes for a Trajectory Negotiation around 100 bytes per clearance Good behaviour of loopback around 100 bytes per clearance Good behaviour of loopback

configurations of upper-layers used for the simulated air-trafficconfigurations of upper-layers used for the simulated air-traffic

Good behaviour of loopback configurations of ATN upper-layers Good behaviour of loopback configurations of ATN upper-layers used for the simulated air-trafficused for the simulated air-traffic

Problems with the reliability of the AMSS for data-link Problems with the reliability of the AMSS for data-link communications with the actual aircraftcommunications with the actual aircraft

Better performances were stated by AATMS with VDL mode 2Better performances were stated by AATMS with VDL mode 2

Page 16: PHARE Aeronautical Telecommunication Network: PATN

1616

ConclusionConclusion

PATN provided the realistic data-link infrastructure PATN provided the realistic data-link infrastructure required for PD/3required for PD/3

PATN contributed to the validation of the ATN protocol PATN contributed to the validation of the ATN protocol suitesuite

The quality of service provided by the mobile The quality of service provided by the mobile subnetwork is critical for the perceived quality of ATN subnetwork is critical for the perceived quality of ATN services: AMSS did not perform as expected at the time services: AMSS did not perform as expected at the time of PD/3of PD/3

The PATN components and infrastructure can be The PATN components and infrastructure can be successfully built-upon by the partnerssuccessfully built-upon by the partners

Page 17: PHARE Aeronautical Telecommunication Network: PATN

1717

CENTRE D'ETUDESDE LA NAVIGATIONAERIENNE

PHARE Aeronautical Telecommunication Network:

PATN

PHARE Aeronautical Telecommunication Network:

PATN

By Gérard Mittaux-BironBy Gérard Mittaux-Biron

PATN Project LeaderPATN Project Leader

CENACENAnextnext