Phoenix Convention Center • Phoenix, Arizona
ESPC ENABLE Program Overview
Solutions Showcase
Successful Small Projects using ESPC ENABLE
Mike Holda & Bob SlatteryLBNL & ORNL
August 13, 2015
Energy Exchange: Federal Sustainability for the Next Decade2
Session Agenda
DOE FEMP• ESPC ENABLE Overview• ESPC ENABLE Process• ENABLE Program Status
Forest Service Project Experience• SoCal Regional• California – 11 National Forests • Deschutes-Ochoco NF
ABM Project Experience• Laughlin AFB• US Embassy Belize• US Embassy Cyprus
Energy Exchange: Federal Sustainability for the Next Decade
Contracts that allow agencies to do energy projects with minimal up-front capital cost and no special appropriations from Congress.
• Arranges project financing• Guarantees cost savings sufficient to cover
project costs
Energy Services
Company (ESCO)
• Pays ESCO over term of contract from guaranteed cost savingsAgency
ESPC Review: What are they?
Energy Exchange: Federal Sustainability for the Next Decade4
ESPC Review: Budget Neutral
$for
Energy + Related
Operations &Maintenance
$for
Energy + O&M
$for
Energy + O&M
Savings
Excess Savings
Payments to ESCO
BeforeESPC
PerformancePeriod
AfterESPC Term
Reallocate the Government’s Utility Bill Stop paying for waste and pollution Start paying for efficiency
Energy Exchange: Federal Sustainability for the Next Decade5
ESPC ENABLE: Program Review
• Guaranteed savings and no up-front costs for smaller facilities or projects
• Standardized and streamlined process to quickly award projects and realize savings using GSA Schedule 84, SIN 246-53
• Targets straight-forward ECMs including lighting upgrades, water conservation, basic HVAC controls, HVAC equipment, and solar PV.
• FEMP-provided tools and templates assist agencies and ESCOs with project development and contracting tasks.
• Prescribed basic measurement and verification (M&V) for each ECM.
Energy Exchange: Federal Sustainability for the Next Decade6
ESPC ENABLE: ECM Summary
ECM Included Not IncludedLighting Lamps, Ballasts, Fixtures
Controls: Occupancy, Day lighting (on/off, dimming) Solar Lighting (off-grid installations allowed)
Water Sanitary plumbing fixtures: sinks, toilets, urinals, showers Irrigation Leak repair Domestic/commercial hot water heaters Water based appliances: dishwasher, ice machine, clothes
washer, etc.
Heating/Cooling system improvements (cooling towers, once through cooling, condensate reclaim)
HVAC Controls
Whole building control strategies including: Time/Temperature Set-back Demand/Night Ventilation
Advanced Controls 1: Energy Management Control Systems (EMCS) / Building Automation Systems (BAS)
HVAC Equipment
Basic whole building/system one-for-one replacement 2 of: Window AC units / Electric Baseboard heat Split AC/Furnace Heat Pumps Packaged Terminal Air Conditioner (PTAC) Packaged Single Zone Air Conditioner (PSZ) Roof Top Units (RTU)
Single building Boiler/Chiller Central Boiler/Chiller Plants Retro-commissioning based activities Non-building related
heating/cooling/ventilation
Solar PV Ground, Roof, Parking Canopy mount Fixed and Tracking Arrays Grid Tied and Off-grid
Solar Thermal (Hot Water) Hybrid PV/Hot water systems
Energy Exchange: Federal Sustainability for the Next Decade7
Quick Comparison of Project Funding Options
DOE ESPCs ESPC ENABLE UESCsContract type TOs under DOE IDIQ GSA Schedule 84
(SIN246-53)GSA Area-wide contracts; Basic ordering agreements
Private-sector partner
ESCO ESCOs on GSA Schedule 84 (SIN246-53)
Serving utility company
Eligible facilities Federally owned worldwide
Federally owned facilities Where government pays utility bill; where offered/authorized
Project size $2 million or larger < $2M; bldgs <200K sq ft and site bundling are anticipated
Any
ECMs Unlimited Lighting, water, basic HVAC controls, HVAC equipment, and solar PV
Unlimited
Savings guarantees and M&V
Required Required;simplified M&V
Negotiable; performance assurance required for annual scoring
O & M ESCO responsible; tasking negotiable
Government is responsible; ESCO provides training
Negotiable
Energy Exchange: Federal Sustainability for the Next Decade8
ESPC ENABLE: Process Cycle
Phase 1Acquisition Planning
(1-2 weeks)
Phase 2ESCO Selection
(3 weeks)
Phase 3 Investment Grade Audit
and Award (5 weeks)
Phase 4 Installation (8 weeks)
Phase 5Performance
Period (<10 years)
Projects awarded in 12-16 weeks. Energy/cost savings in 6-8 months.
Energy Exchange: Federal Sustainability for the Next Decade9
ESPC ENABLE Process, Acquisition Planning
Activities: Estimated timeline - 1-2 Weeks Essential members of the
acquisition team are identified Agency hosts kickoff meeting
with acquisition team members Agency develops an Acquisition Plan* Agency develops the
Request for Quotation/Notice of Opportunity*
Agency develops Source Selection Plan prior to receipt of Expression of Interest
*Indicates FEMP-provided template
Acquisition Planning
Energy Exchange: Federal Sustainability for the Next Decade10
ESPC ENABLE Process, ESCO Selection
Activities: Estimated timeline - 3 Weeks Request for Quotation/Notice of Opportunity
is released Agency prepares Scope of Work (SOW)* ESCOs express interest* Agency evaluates responses based on best
value criteria outlined in the RFQ/NOO* Agency notifies unsuccessful offerors* and
issues the notice of intent to award (NOITA)*
*Indicates FEMP-provided/required template
ESCO Selection
Energy Exchange: Federal Sustainability for the Next Decade11
ESPC ENABLE Process, Investment Grade Audit to Award
Activities: Estimated timeline - 5 Weeks Agency hosts Investment Grade Audit (IGA)
kickoff meeting ESCO performs IGA using FEMP-provided
survey tools* ESCO submits final proposal*,
final negotiations occur Agency awards task order
*Indicates FEMP-provided template
IGA and Award
Energy Exchange: Federal Sustainability for the Next Decade12
ENABLE IGA TOOL
ENABLE IGA Tool Overview
Tech Cat. ECM No.
(a) ECM Energy
Baseline (MMBTU/yr)
(b1)Electric Energy Savings(kWh/yr)
(b2)Electric energy Savings
($/yr)
(c1)Electric Demand Savings(kW/yr)
(c2)Electric Demand Savings
($/yr)
(d1)Natural Gas
Savings(MMBTU/yr)
(d2)Natural Gas
Savings($/yr)
(f)=0.003413*b1+d1+e1
Total Energy Savings
(MMBTU/yr)
(g)=b2+c2+d2 +e2
Total Energy Cost Savings
($/yr)
(i)Water
Savings (1000
gal/yr)
(j)Water
savings ($/yr)
(k) = (g)+(h)+(j)Estimated
Annual Cost Savings
($/yr)
(l)Implementation
Price($)
(m)= (l) / (k)Simple
Payback(yrs.)
5 Lighting 487 88,679 $8,425 158 $1,465 0 $0 303 9,890$ 9,890$ 60,000$ 6.113 Water 44 0 $0 0 $0 12 $117 12 117$ 1,732 $5,889 6,006$ 40,000$ 6.73 HVAC Cntrl 4,276 0 $26,683 0 $0 128 $1,922 128 28,605$ 28,605$ 10,000$ 0.3
TOTAL 4,808 88,679 $35,107 158 $1,465 140 $2,039 443 $38,612 1,732 5,889 $44,501 $110,000 2.5
SCHEDULE TO-4Task Order Performance First Year Estimated Annual Cost Savings, by Energy Conservation Measure and Technology Category
Project Site: Delivery Order No: Contractor Name: Project Square Footage (KSF):
EnergyPlusBuilding SimulationSoftware
PVWattsNREL web service
WaterLighting
HVACSolar PV
HVAC
Solar
add ESCO logo here
Agency:Project Name: 4,140 kWh savings/yr.
8,965 gallons of water savings/yr.ESCO: 510 Therms of Natural Gas savings/yr.
IGA Date(s): 2.0 Years Estimated Simple Payback (prior to final financing)Report Date:
Total Direct Costs
Estimated Implementation
Price
Estimated Utility
Incentive
Price Less Incentive
Year 1 Estimated
Savings
Simple Payback
w/incentive (yrs)
Lighting $265 $300 $100 $200 $29 7.0
Water $616 $700 $10 $690 $49 14.1
HVAC Cntrls $500 $600 $0 $600 $1,139 0.5
$1,000 $1,000 N/A N/A N/A N/A
$2,381 $2,600 $110 $2,490 $1,217 2.0
Total energy savings (MMBtu/yr)
Electric energy savings (kWh/yr)
Electric demand savings (kW-yr)*
Natural gas savings (Therms)
Water savings (gallons/yr)
Total energy & water cost savings,
Year 1 ($/yr)
Lighting 1 248 1 0 0 $29
Water 1 0 0 10 8,965 $49
HVAC Cntrls 63 3,892 0 500 0 $1,139
65 4,140 1 510 8,965 $1,217
Note: The information contained within this report is based on findings from the Investment Grade Audit and contains preliminary estimates for implementation price and simple payback of the measures under consideration. The information provided is not to be construed as a formal proposal or guarantee of savings, rather it is to serve as a basis for agency review of the project's direction prior to the development of the final proposal by the ESCO.
First Year Guaranteed Cost Savings: TBDNotes
MMBtu = 106 Btu = 293 kWh*Annual electric demand savings (kW/yr) is the sum of the monthly demand savings.
ECM Description
1-Lighting Upgrade
2-Water Conservation Upgrade
3-HVAC Controls Upgrade
Total Savings
Total
ECM Description
1-Lighting Upgrade
2-Water Conservation Upgrade
3-HVAC Controls Upgrade
Project Development Cost
6/1/20136/20/2013
Project Highlights Federal Agency ABC Example Project
USA ESCO
Annual Energy and Cost Savings Summary
Project Overview
Lighting2%
Water4%
HVAC Cntrls94%
Cost Savings by ECM
Electricity (kWh), $413
Electricity (Demand), $5
Natural Gas, $760
Water, $30
Cost Savings by Utility Type
Lighting1%
Water2%
HVAC Cntrls97%
Total Energy Savings by ECM
Lighting6%Water
0%
HVAC Cntrls94%
Electricity Savings by ECM
Lighting0%
Water2%
HVAC Cntrls98%
Natural Gas Savings by ECM
IGA Summary Report- Energy and Cost Savings Tables (M&V Plan)- Financial TO Schedule #4 (TO-4)- ECM Equipment Summaries
outputs
Energy Exchange: Federal Sustainability for the Next Decade13
IGA/Award: Final Proposal
Once the agency reviews the Summary IGA Report, they will request that the ESCO prepare the FP. The FP should adhere to the requirements established in the NOO and the agency’s SOW.
The ESCO’s Proposal will consist of the following: A Project Overview A Price Proposal (TO Financial Schedules) A Technical Proposal
– ECM descriptions– Measurement and Verification Plan– Management approach
Once negotiations complete, agency CO will notify ESCO to solicit financing offers
Energy Exchange: Federal Sustainability for the Next Decade14
ESPC ENABLE Process, Installation and Acceptance
Activities: Estimated timeline – 8 Weeks Installation Commissioning* Measurement and Verification (M&V)* Agency Acceptance*
* Indicates FEMP provided plan templates and report outlines
Installation
Energy Exchange: Federal Sustainability for the Next Decade15
ESPC ENABLE Process, Performance Period
An annual M&V audit is performed to verify the achievement of annual cost savings performance guarantees provided by the ESCO ESCO or agency must perform annual M&V
audit Equipment inspections are performed as
prescribed in the M&V plan to verify savings achievement
Primarily Option A An annual M&V Report* is generated by the
ESCO and submitted to the agency
* Indicates FEMP provided report outline
Performance Period
Energy Exchange: Federal Sustainability for the Next Decade16
Verify project sites and scope Confirm site leadership buy-in Commence acquisition planning Populate Notice of Opportunity/RFQ Identify and finalize core team members Schedule project kick-off meeting
ESPC ENABLE: Getting a Project Started
Energy Exchange: Federal Sustainability for the Next Decade17
ESPC ENABLE: Program Status as of August 2015
Updates in the Program• 20 qualified ESCOs under GSA Schedule 84
– Nine Small Business vendors• IGA tool being converted to web environment• 3 awards to date
Project Status• Multiple projects underway ($18M Pipeline)• Project scopes range from one to multiple ECMs• Efforts are leading to other performance
contracting projects (IDIQ, Schedule 84, UESC)
Energy Exchange: Federal Sustainability for the Next Decade18
ESPC ENABLE: Agencies and Projects
Agencies Developing Projects• DHS: ICE, CBP• DOD: USAF• DOS• GSA• USDA: USFS
3 awards 8 under development
Acqu
isitio
n P
lanni
ngES
CO Se
lectio
n
IGA
& Awar
d
Insta
llatio
n &
Acce
ptan
cePe
rform
ance
Per
iod
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
Investment by Project Phase
Energy Exchange: Federal Sustainability for the Next Decade19
FEMP Federal Project Executives (FPEs)
– Covering ESPCs and All AFOs –
Scott WolfWestern Region including N. Marianas, Palau, Guam, American Samoa; plus East, South, and Central Asia;the Pacific; and Near East360-866-9163 [email protected]
Tom HatteryNortheast Regionplus State [email protected]
Doug CulbrethSoutheast Region plus Europe and Western [email protected]
Northeast
WestMidwest
SoutheastMidwest
Ira BirnbaumFEMP ENABLE [email protected] http://energy.gov/eere/femp/espc-enable
Energy Exchange: Federal Sustainability for the Next Decade20
Questions