photo courtesy of steven holl architects -...
TRANSCRIPT
Photo courtesy of Steven Holl Architects
Photo courtesy of Steven Holl Architects
Photo courtesy of Turner Construction Co.
T h e P e r f o r m i n g A r t s C e n t e r | 1
T h e P e r f o r m i n g A r t s C e n t e r | 2
T h e P e r f o r m i n g A r t s C e n t e r | 3
T h e P e r f o r m i n g A r t s C e n t e r | 4
Figure 1: Structural Steel Frame model provided by Turner
Construction Company
T h e P e r f o r m i n g A r t s C e n t e r | 5
Figure 2: 100% Contract Documents – Volume 6 – Turner Construction – Exterior Wall
Sections – A300
T h e P e r f o r m i n g A r t s C e n t e r | 6
T h e P e r f o r m i n g A r t s C e n t e r | 7
Table 1: Major system breakdown costs including material and labor cost
T h e P e r f o r m i n g A r t s C e n t e r | 8
T h e P e r f o r m i n g A r t s C e n t e r | 9
T h e P e r f o r m i n g A r t s C e n t e r | 10
T h e P e r f o r m i n g A r t s C e n t e r | 11
Town
Campus
T h e P e r f o r m i n g A r t s C e n t e r | 12
RS Means Source Model #
Page(s) Ext Wall Type
Area Frame
Area Falls Between and
Base cost per SF
Cost Adj Type: Per SF Adj
Cost Adj Type: Per SF Adj
Adj Base cost per SF
Base Bldg Cost 172.75 x 125,900 =
Adj Base Cost / SF FloorArea
Basement Cost 30.15 x 30,023 =
Basement Cost / SF Basement Area
Total Base Bldg Cost
Additive Source Type Quantity Price/Unit
RS Means Additions Closed Circuit Sur 3 1975 Amount
RS Means Additions Seating 200 320 Amount
RS Means Additions Emergency Lighting 100 $780 Amount
RS Means Additions Sound System 2700 $130 Amount
New Subtotal Cost
Multiplier Type Value
Multiplier Type Value
New Subtotal Cost
Total Cost $
Perimeter
Story Height
Time
$22,852,349.99
$22,852,349.99
$5,925.00
$23,153,343.45
Location
$351,000.00
The Performing Arts Center - Square Ft. Schematic Estimate
R.S. Means Square Foot Costs 2015
86-87
125,900
M.040 Auditorim
Steel Frame
Face Brick with Concrete
$64,000.00
$78,000.00
125,900 +
1.05
0.94
$137.40
$45.35
-$10.00
$172.75
$21,749,225.00
$905,193.45
$22,654,418.45
Total
The Performing Arts Center – Square Foot Schematic Estimate
Cost Data based off of:
Phelan, Marilyn, AIA. R.S. Means Square Foot Costs 2015. N.d. Construction Cost Data. Norwell, Massachusetts.
T h e P e r f o r m i n g A r t s C e n t e r | 13
Assembly % of Total Cost per SF
A Substructure 7.50% $13.61
B Shell $45.71
B10 Superstructure 8.80% $19.41
B20 Exterior Enclosure 21.70% $20.46
B30 Roofing 4.60% $5.84
C Interiors 18.80% $26.19
D Services $0.64
D10 Conveying 2.70% $6.90
D20 Plumbing 9.50% $23.33
D30 HVAC 9.60% $2.91
D40 Fire Protection 2.90% $15.69
D50 Electrical 13.90% $2.93
E Equipment & Furnishings 0.00% $0.00
F Special Construction 0.00% $0.00
G Building Sitework N/A N/A
Additions N/A N/A
Subtotal
Jobsite OH & GC's 20.00%
Contractors Fee 5.00%
Designer's Fee 5.00%
Total
State College Area High School Square Foot Estimation Breakdown
N/A
N/A
$29,708,054.98
$22,852,349.99
$4,570,470.00
$1,142,617.50
$1,142,617.50
$2,170,973.25
$2,193,825.60
$662,718.15
$3,176,476.65
$0.00
$4,296,241.80
$0.00
$617,013.45
Total Cost
$0.00
$2,011,006.80
$4,958,959.95
$1,051,208.10
$1,713,926.25
$0.00
Assumptions and Clarifications:
Assume building type is M.040 Auditorium Assume Face Brick Concrete Block Back Up based on the given parameters and actual Lecce Limestone façade. Assume steel frame structural system Assume maximum ceiling height of 16'
T h e P e r f o r m i n g A r t s C e n t e r | 14
Square Foot Takeoff and Calculations:
Perimeter Area
Forum Level 996.75' 49,860 SF Takeoffs
Mezzanine Level (All from above) 16,705 3,751
891
630
11,433
Plaza Level 16,262 4,711
2,345
4,369
3,065
1,772
Level 2 Plan 24,715 532
4,447
15,522
4,214
Level 3 Plan 18,357 13,565
1,532
3,260
Total Area: 125,899
Perimeter: 996.75'
T h e P e r f o r m i n g A r t s C e n t e r | 15