Wind Farms 101

Gary Snyder, RES, Oklahoma State UniversityWade Patterson, Garfield County Assessor

Page 2: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

What is wind energy and how is it generated?

Wind energy is a source of renewable energy that harnesses the kinetic energy of the wind or, in other

words, of the air in movement.

Once transformed to mechanical energy, wind energy can be used for various applications (windmills to

pump water or grind cereals).

The most common use nowadays is to generate electricity using wind turbines.

Page 3: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Picture of new and old “wind mills”

Page 4: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

How do wind turbines work?

The wind’s kinetic energy is transformed into electricity by wind turbines.

These are made up of a tower, a gondola comprising a rotor and an anemometer (measures wind speed), a

weather vane or “weathercock” to indicate wind directions and a lightning conductor.

Page 5: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Source: Way2Science

Wind turbine diagram expanded

Page 6: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

How do wind turbines work?

A Rotor is composed of the blades and an axle, attached to each other by a bearing, this allows for

the pitch of the blade to be adjusted.

The blades, moved by the wind, transmit force to the low speed shaft, which is connected to a multiplier

(gearbox) that increases the axle speed.

The mechanical energy is transferred from the multiplier to an electricity generator, which

transforms it into electricity for subsequent injection into the grid.

Source: AWEA

Page 7: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Basic diagram of a wind turbine

Page 8: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

How do wind turbines work?

The range of wind turbine power goes from 100 W with a blade diameter of around 1 meter, which

are mainly used for residential purposes, to about 5 MW (5,000,000 watts) with a blade diameter

and tower height greater than 100 meters.

Page 9: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

400 Watt Turbine 600 Watt Turbine

Page 10: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

One 1.6 MW turbine will provide enough power for 500 typical homes

Page 11: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

1.8 Megawatt Turbine, or the equivalent of

4,500 small 400 Watt turbines

Page 12: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

• Renewable Energy - Energy derived from resources that are regenerative or that cannot be depleted. Types of renewable energy resources include wind, solar, biomass, geothermal, and moving water.

• Grid (also “Power Grid” and “Utility Grid”) - A common term referring to an electricity transmission and distribution system.

• Wind Turbine - A term used for a wind energy conversion device that produces electricity.

Definitions

Page 13: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Definitions

• Generator - A device for converting mechanical energy to electrical energy.

• Met Tower - Meteorological towers erected to verify the wind resource found within a certain area of land.

• Nacelle - The cover for the gearbox, drive train, and generator of a wind turbine.

• Rotor - The blades and other rotating components of a wind energy conversion turbine .

Page 14: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Definitions

• Watt (W) - The rate of energy transfer (from an outlet to an appliance, for example). Wattage is calculated by multiplying voltage by current.

• Kilowatt (kW) - A standard unit of electrical power equal to 1,000 watts.

• Megawatt (MW) - The standard measure of electric power plant generating capacity. One megawatt is equal to one thousand kilowatts or 1 million watts.

• Gigawatt (GW) - A unit of power equal to 1 million kilowatts.

Page 15: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

• Capacity Factor - The amount of power a turbine actually produces over a period of time divided by the amount of power it could have produced if it had run at its full rated capacity over that time period.

• Specific Yield - Measurement of the annual energy output per square meter of area swept by the turbine blades as they rotate.

• Rated Power Output - Used by wind generator manufacturers to provide a baseline for measuring performance. Rated output may vary by manufacturer.

• Rated Wind Speed - The wind speed at which the turbine is producing its nameplate-rated power production. For most small wind turbines this is around 30 to 35 miles per hour.

Definitions

Page 16: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

• Start-Up - The wind speed at which a wind turbine rotor starts to rotate. It does not necessarily produce any power until it reaches cut-in speed.

• Cut-In-Speed - The rotational speed at which an alternator or generator starts pushing electricity hard enough (has a high enough voltage) to make electricity flow in a circuit.

• Cut-Out Speed - The wind speed at which the turbine automatically stops the blades from turning and rotates out of the wind to avoid damage to the turbine.

Definitions

Page 17: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

• Power curve - The instantaneous power output of a specific turbine design at various wind speeds. Used with wind resource data to determine the potential for electricity generation at a project site.

• Furling - The act of a wind generator Yawing out of the wind either horizontally or vertically to protect itself from high wind speeds.

• Yaw - Rotation parallel to the ground. A wind generator Yaws to face winds coming from different directions.

Definitions

Page 18: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind farms

It is normal practice, to group wind turbines together within wind farms to harness the maximum wind

force and obtain greater quantities of energy.

The turbines are separated from each other in these parks by a minimum distance of three times the

diameter of the rotor and a maximum of nine times this diameter, in order to avoid wind turbulence and make it easier to connect the wind turbines to the

electricity grid.

Page 19: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind turbine turbulence

Page 20: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind farms

When evaluating a potential wind farm site, the ground conditions have to be taken into account, such as

unevenness, the existence of obstacles and the area's orography (the study of the formation and relief of

mountains), so that the best return possible is achieved.

Uneven ground reduces wind speed, while obstacles such as trees, buildings, and outcrops cause

turbulence, which has a negative effect on the wind harnessed for electricity generation. These factors

also cause wind turbines to wear faster.

Page 21: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind farms

Making good use of an area’s orography can have advantages and result in improved performance.

Thus, a good option is to position turbines in “tunnels” between, for example, two rock outcrops, where the

wind speed is greater.

Wind farms are also frequently installed on hilltops since the wind speed is greater at higher altitudes.

Page 22: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind turbines at Blue Canyon Wind Farm, SW Oklahoma

Page 23: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind turbines at Blue Canyon Wind Farm, SW Oklahoma

Page 24: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

The Production Tax Credit (PTC)

--American wind power's key federal incentive (the 2.2 cents per kilowatt-hour Production Tax Credit, or PTC) only applies to projects that succeed in putting electricity on the grid. It will expire Dec. 31, 2012, unless Congress extends it.

--The PTC has not been allowed to expire since 2005, when President George W. Bush extended it as part of the Energy Policy Act.

--This successful policy over the past several years has incentivized $15.5 billion a year on average in private investment in the United States. Wind facilities account for 35% of all new energy production capacity (measured in megawatts) in the United States. This is a close second to natural gas.

Source: AWEA

Page 25: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

The PTC, the main policy tool in the deployment of U.S. wind power, was first adopted during the administration

of President George H.W. Bush as part of the Energy Policy Act of 1992 (P.L. 102-486).

It has been a significant driver of the recent growth of the U.S. wind industry. In each of the years during which the

PTC lapsed (2000, 2002, and 2004), meaning that it expired prior to being renewed, the level of additional

deployed wind capacity slowed or collapsed when compared to the previous year’s total: 93% in 2000, 73%

in 2002, and 77% in 2004

The Production Tax Credit (PTC)

Page 26: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

History of new wind production capacity in relation to the Production Tax Credit (AWEA)

Page 27: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

The wind energy Production Tax Credit

Congress provided a three-year extension of the PTC through December 31, 2012, as part of the American

Recovery and Reinvestment Act.

The PTC provides an inflation-adjusted per kilowatt-hour (kWh) income tax benefit over the first ten years of a wind project’s operations, which in 2010 was 2.2 cents per kWh,

and is a critical factor in financing new wind farms.

In order to qualify, a wind farm must be completed and start generating power while the credit is in place, which would

be by the end of 2012.

Page 28: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

National Renewable Energy Laboratory Innovation for Our Energy Future

Page 29: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Notice the huge increase in wind production from the slide showing 1999 production!

Page 30: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Find a windy site. Look for sites where the average wind speed is appropriate for the turbines to be

used.

Make sure the site has nearby transmission lines. It’s not enough to find wind. There has to be a way

to transport the electricity generated by a wind farm to a main power grid.

Define the boundaries. After you find a windy place that’s near a power grid, define the boundaries of

the prospect area.

How a wind farm is developed

Bennett
There has to be a good joke here if you think about it. In Oklahoma, it is speculated that the windiest site is outside the front doors of the capitol building. Ha, ha.
Page 31: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

By: TheWINDCOALITION

(North American Electric Reliability Corporation)

Florida Reliability Coordinating Council

Midwest Reliability Organization

Northeast Power Coordinating Council

Reliability First Corporation

SERC Reliability Corporation

Southwest Power Pool Western Electricity Coordinating Council

Electric Reliability Council of Texas

ERCOT

Page 32: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Determine who owns the land within the prospect boundaries. The owners of the land within the prospect

boundaries are potential partners.

Contact the landowners. In order to gauge interest in wind farm development, the wind energy company contacts the

landowners about the possibility of a partnership.

Call a town meeting. If there are many landowners in the same area, a town meeting helps explain the ins and outs

of wind farm royalty payments and natural resource management.

How a wind farm is developed

Page 33: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Settle the contracts. A company and the landowners will negotiate agreements for test towers and options for

lease agreements.

Create blueprints. The company lays out potential wind farm configurations to give landowners an idea of where

the turbines might be placed.

Watch the wind. A company typically monitors the wind for 6 months to 2 years to corroborate their data with

publicly available wind data.

How a wind farm is developed

Page 34: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Get the necessary permits. While testing the wind’s power, the company is also acquiring the necessary

permits at the federal, state, and county levels.

Perform environmental analyses. The company is required to ensure the safety of local wildlife and the

environment.

Test the wires. Testing grid connections is very important. Companies will perform additional

transmission research.

How a wind farm is developed

Page 35: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Sell the electricity. Selling wind generated electricity is the “Holy Grail” in the business.

Most wind energy companies cannot build a project until a customer is found.

Because of the huge upfront cost, projects are feasible only after a customer, such as a large utility, has committed to a long-term energy

purchase (power purchase agreement or PPA) of 10 to 20 years in duration.

How a wind farm is developed

Page 36: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Begin construction. The construction phase usually takes about 9 months to a year.

Work with landowners to minimize disturbance to the land. The company will build roads and

erect turbines. The company will establish the electrical and engineering work to connect the

turbines to the grid.

Wind turbines and access roads occupy less than 3% of the land in a typical wind farm.

How a wind farm is developed

Page 37: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Electricity distribution diagram

Page 38: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded
Page 39: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

What are the components of a

wind farm?

Page 40: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Meteorological (Met) tower

Page 41: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Met tower being constructed

Bennett
Potential for humor:No, this is not the Mars Rover. It is actually a meteorlogical tower.
Page 42: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

80 meter met tower, approximately 265’

Page 43: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Turbine base pad excavation

Page 44: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded
Page 45: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Turbine base sub-frame

Page 46: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Pouring concrete for the base

Page 47: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Installing conduit for lines

Page 48: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Completed tower base, ready for a tower

Page 49: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Tower lay down site

Bennett
I could see a question arising here about the space needed for assembly versus the space for the final towers. If it is in a corn field I anticipate that the issue will arise with the farmer-landowner.
Page 50: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded
Page 51: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Installation of the bottom section of the

tower

Page 52: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Installation of the middle section of

the tower

Page 53: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Final adjustments

Page 54: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Second section weight

Page 55: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Maneuvering the a section of the tower

into place

Nerves of steel!

Page 56: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

View from inside the tower

Page 57: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Top 10 wind turbine manufacturers by annual market share (installed capacity) in 2011 by IHS Inc.

Vestas 12.7% Sinovel 9.0% Goldwind 8.7% Gamesa 8.0% Enercon 7.8% GE Wind Energy 7.7% Suzlon Group 7.6% Guodian United Power 7.4% Siemens Wind Power 6.3% Ming Yang 3.6%

Source;: Wikipedia

Page 58: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Nacelle and hub lay down site

Page 59: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Close-up of the nacelle

Page 60: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Starting to connect the nacelle and the hub

Page 61: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Connecting the nacelle and the hub

Page 62: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Final adjustments before nacelle and hub

are connected

Easy does it!

Page 63: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Lifting the nacelle into place

Page 64: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Lifting the nacelle to the top of the tower

Page 65: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Nacelle installation

Page 66: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Attaching the nacelle to the tower

Page 67: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Blade lay down yard

Page 68: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded
Page 69: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Blade being transported to the

tower site

Page 70: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

In-air blade installation

Page 71: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

In-air blade installation

Page 72: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

In-air blade final attachment to the hub

Page 73: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Assembled blade and hub being lifted into

place

Page 74: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Installed blade and hub

Page 75: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Tower base and access door

Page 76: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Completed tower

Page 77: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Every tower will have a

connection box

Bennett
Another opportunity to comment about the farmer's filed being extensively trenched. Presumably they do it after fall harvest and before spring planting?
Page 78: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Trench for the interconnect lines

Page 79: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind farm substation

Page 80: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Completed wind turbine and pad site

Page 81: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Aerial view of a wind farm

Page 82: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Aerial view of a wind farm

Bennett
Possibility for humor here:Windy Farms Golf Course, beautiful but treacherous.
Page 83: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

View of the inside of the nacelle

Page 84: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Removing the “internal organs” of the nacelle

Page 85: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Image: © VESTAS WIND SYSTEMS A/S

Picture of a “climbing crane”

Page 86: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Image: © VESTAS WIND SYSTEMS A/S

Page 87: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Project Location:

The Chisholm View Wind Project is located approximately 15 miles North and East of Enid,

Oklahoma and directly adjacent to Hunter, OK. The project sits within Garfield and Grant Counties.

Chisholm View Wind Project

Page 88: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded
Page 89: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Wind Power Classes

Wind Power Class 10 meter 50 meter

Wind Power density

Speed m/s (mph)

Wind Power Density

Wind Speed m/s (mph)

1 0 0 0 0

2 100 - 150 4.4 (9.8) / 5.11 (11.5) 200 - 300 5.6 (12.5) / 6.4

(14.3)

3 150 - 200 5.1 (11.5) / 5.6 (12.5) 300 - 400 6.4 (14.3) / 7.0

(15.7)

4 200 - 250 5.6 (12.5) / 6.0 (13.4) 400 - 500 7.0 (15.7) / (16.8)

5 250 - 300 6.0 (13.4)/6.4 (14.3) 500 - 600 7.5 (16.8)/8.0

(17.9)

6 300 - 400 6.4 (14.3)/7.0 (15.7) 600 - 800 8.0 (17.9)/8.8

(19.7)

7 >400 >7.0 (15.7) >800 >8.8 (19.7)

Page 90: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Chisholm View

Wind rating for Oklahoma

Page 91: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Chisholm View

Page 92: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded
Page 93: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Chisholm View Wind Farm, Garfield Co. OK

Page 94: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Close-up of Chisholm View

Page 95: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Project Interconnection:

An existing 345kv line owned by Oklahoma Gas & Electric runs through the project site.

Chisholm View will interconnect directly onto this line and have the ability to deliver energy South to load

centers such as Oklahoma City and North to load centers in and around Wichita, KS.

Chisholm View Wind Project

Page 96: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Project Size:235 MW (140 Turbines)

Project Turbines:GE 1.6 MW

Landowners and Acreage Involved:Chisholm View encompasses approximately 45,000

acres and involves over 150 landowners.

Chisholm View Wind Project

Page 97: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Utility Buyers:

The power produced by Chisholm View (located in the SPP grid region) will be sold to Alabama Power

Company, a subsidiary of Atlanta-based Southern Company. (located in the SERC grid region)

The Chisholm View Wind Project will deliver clean, low cost electricity to communities in Alabama.

Chisholm View Wind Project

Page 98: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

By: TheWINDCOALITION

(North American Electric Reliability Corporation)

Florida Reliability Coordinating Council

Midwest Reliability Organization

Northeast Power Coordinating Council

Reliability First Corporation

SERC Reliability Corporation

Southwest Power Pool Western Electricity Coordinating Council

Electric Reliability Council of Texas

ERCOT

Page 99: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Key Project Attributes:

A 235 MW Chisholm View Wind Project would produce enough power for approximately 80,000 Alabama homes.

The project will take only approximately 1-2 percent of land out of service to build, including all land for roads, turbine

foundations, and maintenance buildings.

Chisholm View is one of the most energetic wind development sites in North Central Oklahoma.

Chisholm View Wind Project

Page 100: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Key Project Attributes continued:

Once fully developed, Chisholm View Wind project will contribute up to $5 million per year in total annual

landowner payments.

The project enjoys broad community support from landowners and local government agencies.

The project is expected to have no material effect on any threatened and endangered species of birds or animals

based on third party studies commissioned by TradeWind Energy.

Chisholm View Wind Project

Page 101: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

“Primary Roads” are identified – i.e. major construction traffic corridors

Designation of condition and/or type of road

Site plan is approved by county as part of agreement

County authorizes project’s use and improvement of said roads

Counties waive weight restrictions in return for payment and/or upgrade/repair obligations

Road Maintenance Agreement Overview

Page 102: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

County to continue routine maintenance during construction

Project agrees to specific payments due and/or upgrade and restoration obligations and specs

Culverts and bridges needing replacement or repair are identified

County allows Project to make routine improvements and initiate routine maintenance of Primary roads at its own expense

County authorizes crane crossing of ROW, increasing radiusesof intersections, etc

Road Maintenance Agreement Overview

Page 103: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Permitting Requirements

Page 104: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Avian Migration, Raptor Migration, Raptor Nest, Bat Monitoring, Cultural Resources, Wetlands, Threatened and

Endangered Species Habitat Assessment, Phase I Environmental Site Assessment,

Microwave Beam Path, TV, AM/FM

Environmental Studies Completed

Chisholm View Wind Project

Page 105: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Site Prospecting and Selection Q1 2008

Interconnection Feasibility Request Filed (SPP) Q1 2008

Assessor Supplied GIS Ownership Q1 2008

Begin Contacting Landowners to Gauge Interest Q1 2008

Met Tower Installation (1st of many) Q1 2008

Initiate Land Leasing Campaign Q2 2008

Conduct Town Hall Meetings (1st of many) Q2 2008

Initial Field Environmental Surveys Q1 2009

Continue Environmental Surveys, Wind Data Collection, Leasing, PR all 2009

Initiate Power Marketing Efforts 2009

Land Leasing Substantially Complete Q1 2010

Generator Interconnection Agreement Executed (SPP) Q3 2010

Continue Environmental Surveys, Wind Data Collection, Leasing, PR all 2010

Power Purchase Agreement Executed Q3 2011

Initiate Permitting Q3 2011

Initiate Final Engineering Q3 2011

Procure Major Equipment Q4 2011

Complete Road Maintenance Agreement w/ County Q1 2012

Permitting Complete Q1 2012

Construction Commencement Q1 2012

Turbine Erection Begins Q3 2012

Final Completion - Commercial Operation Q4 2012

Construction Restoration Complete (roads, bridges, private) Q1 2013

Wind Project Operations Q1 2013 and on

Chisholm View project time line of

events

Page 106: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

The first completed tower in the

Chisholm View Wind Farm.

Picture taken July 27, 2012!

Page 107: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Sources

• AWEA• EDP Renewable North America / Horizon Wind Energy• ENEL Green Power, North America• FEMA• Garfield County Commissioners• NREL• The WINDCOALITION• Trade Wind Energy• Vestas Wind Systems• Way2Science• Wikipedia

Page 108: Picture of new and old “wind mills” Source: Way2Science Wind turbine diagram expanded

Questions?