pile driving monitor (pdm)€¢ the pile driving monitor is a new pile testing device being offered...
TRANSCRIPT
PDM : a transformation in pile driving QA
• Current methods of pile verification – by set card, target set or blow counting are inaccurate flawed and unsafe
• The Pile Driving Monitor is a new pile testing device being offered to industry by AFT and Pile Dynamics Inc.
• The purpose of the PDM is to extend the benefits of PDA testing to every pile across theproject
• It does this by simple, safe and accurate measurements of pile movement and pile velocity
• The PDA and PDM are correlated, and the PDM is then used to monitor the capacity and integrity of every pile
• The PDM is NOT just a set/TC measuring device
© Advanced Foundation Technologies2017
Hardware - PDM Components
EDM(not visible)
PDM Charger
PDM - Tablet USB
Connector Cable
Pile Driving Monitor (PDM)
Target Reflectors
© Advanced Foundation Technologies2017
[3] USB connector
[4] Charging connector
[1] Power toggle switch
PDM Rear Face – Main Operational Area
[2] Status lights WiFi Data Power
6
© Advanced Foundation Technologies2017
LED Optical Receiver
2 laser positioning pointers (typ)PDM Optics (Front)
• The PDM uses LED technology to scan a section of pile for a high intensity reflection.
• The 4 LED optical transmitters each monitor one section of the active zone.
• A single LED optical receiver collects all signals.
• The lasers are optically safe.
4 LED Optical Transmitters (typ)
© Advanced Foundation Technologies2017
EDM Mounting Screw
• A critical input to the PDM is the distance from the PDM unit to the target reflector.
• The Electronic Distance Measurement (EDM) unit is attached securely to the PDM with a standard camera mounting screw
• EDM distance should be recorded to 10mm accuracy
1 : EDM
© Advanced Foundation Technologies2017
PDM sand bag
• We recommend the PDM be placed on the ground on the sand bag provided to minimize wind and vibration effects.
Microsoft Surface Pro 4 Tablet
• PDM is controlled by software on a Microsoft Surface Pro 4
• The tablet is supplied with a rugged case
• Wireless connection to PDM unit or USB connection
• Hi visibility screen for field conditions
• Stores full QA records –continuous data signal
© Advanced Foundation Technologies2017
Basic operating principle
Vert
ical
Mo
vem
ent,
V
• The PDM determines the position of the centre of the reflector by the angle in the vertical plane.
• As the reflector moves with the pile motion, the PDM tracks the reflector at about 4000Hz.
• The change in vertical position (pile movement) is computed as ΔV = H. (tan α1-tan α2)
• Measurements are made before the ground wave arrives
α1
α2
Offset Distance, H
© Advanced Foundation Technologies2017
Field Setup - 1
1
© Advanced Foundation Technologies2017
3
2
• Choose position based on
o Safety;
o Line of sight to target;
o Other sources of vibration;
o Position of sun;
• Place PDM firmly on sand bag in direction of pile
• Typical offset 6m - 12m
Field Setup - 2
6
4
© Advanced Foundation Technologies2017
5
• Aim PDM so the active zone (2 red laser dots) is in the midline of the pile and (just) above ground
• Place reflective strip towards the top of the active zone
• Measure the distance to the pile with the supplied EDM
PDM Active Zone
0.5
0m
11.0 m offset
Offset Distance (m)
5.5
10.0
11.0
16.5
20.0
Active Zone Height (m)
0.25
0.45
0.50
0.75
0.90
Approximately horizontal
Act
ive
Zon
eH
eigh
© Advanced Foundation Technologies2017
Why are we making these measurements?
© Advanced Foundation Technologies2017
• NOT just to measure set and TC
• When we drive and sign off piles we are relying on
1. A reliable relationship between energy, capacity and movement (ECM) for the site or for a group of piles
2. Safe and accurate measurements of movement for every pile
3. An accurate estimate of energy for every pile
Real measurement of movement
• In the US blow counts are measured ‘by eye’ from a distance
• For dynamic formulas, measurement of set and TC is often poor
• The accuracy of capacity estimates is compromised
Hong Kong
© Advanced Foundation Technologies2017
Australia Australia
Accuracy of Traditional Set Card
Pile SP4
Set =14mm/blow
TC = 4mm
© Advanced Foundation Technologies2017
Pile SP37
Set =0.9mm/blow
TC = 3mm