pile work presentation at iitk summer camp 08

82
PILE WORK AT DLF HOUSING PROJECT, NEWTOWN, KOLKATA PRAKASH AGARWAL SVNIT, Surat

Upload: praxie

Post on 15-Jun-2015

1.366 views

Category:

Documents


0 download

DESCRIPTION

This is the presentation i gave on "Pile Work at DLF Site, Newtown, Kolkata" during the CE Summer Camp 2008 at IIT Kanpur . Its having info on different types of piles used on the site with pictures, and also pictures of the condominium as it would look like after completion.

TRANSCRIPT

Page 1: Pile Work Presentation at IITK Summer Camp 08

PILE WORK AT DLF HOUSING PROJECT, NEWTOWN, KOLKATA

PRAKASH AGARWAL

SVNIT, Surat

Page 2: Pile Work Presentation at IITK Summer Camp 08
Page 3: Pile Work Presentation at IITK Summer Camp 08

PILE ? Definition: A long timber, concrete

or steel structural element that is driven or otherwise embedded into the ground for the purpose of transferring the load of a superstructure to deeper soil strata.

Page 4: Pile Work Presentation at IITK Summer Camp 08

NEED OF PILES……… The growing need for housing and

construction has forced authorities and development agencies to exploit lands with poor soil characteristics.This has led to the emergence and development of pile foundations which transfers the load to deeper soil strata or rock of high bearing capacity, thus avoiding the shallow soil of low load bearing capacity.

Page 5: Pile Work Presentation at IITK Summer Camp 08

NEED OF PILES………(Contd.) A structure can be founded on piles if

the soil immediately beneath its base does not have adequate bearing capacity. If the results of site investigation show that the shallow soil is unstable and weak or if the magnitude of the estimated settlement is not acceptable a pile foundation may is generally considered.

Page 6: Pile Work Presentation at IITK Summer Camp 08

NEED OF PILES………(Contd.) Further, a cost estimate may indicate that a

pile foundation may be cheaper than any other compared ground improvement costs.

In the cases of heavy constructions, it is likely that the bearing capacity of the shallow soil will not be satisfactory, and the construction should be built on pile foundations.

Page 7: Pile Work Presentation at IITK Summer Camp 08

FUNCTION OF PILES Transmit foundation loads to strata

beyond the practical reach of shallow foundations.

Anchor structures against uplift forces

Assist structures in resisting lateral and overturning forces.

Page 8: Pile Work Presentation at IITK Summer Camp 08

CLASSIFICATION OF PILES Based on load transmission and

functional behaviour: 1. End bearing piles (point bearing piles) 2. Friction piles (cohesion piles ) 3. Combination of friction and cohesion piles Based on the type of material: 1. Timber piles 2. Concrete piles 3. Steel piles 4. Composite piles

Page 9: Pile Work Presentation at IITK Summer Camp 08

CLASSIFICATION OF PILES (Contd.) Based on the effect on soil: 1. Driven pile 2. Bored pile

Page 10: Pile Work Presentation at IITK Summer Camp 08

FACTORS INFLUENCING CHOICE OF PILE Location & Type of structure Ground conditions Durability Cost

Page 11: Pile Work Presentation at IITK Summer Camp 08

EQUPIMENTS INVOLVED DRIVEN PILING : i. Direct push rig (type of drilling rig) ii. 3 drum winch iii. Hollow cylindrical tube of

required length and diameter iv. Pile shoe

Page 12: Pile Work Presentation at IITK Summer Camp 08

DIRECT PUSH RIG

Page 13: Pile Work Presentation at IITK Summer Camp 08

3 DRUM WINCH

Page 14: Pile Work Presentation at IITK Summer Camp 08

THE HOLLOW STEEL TUBE

Page 15: Pile Work Presentation at IITK Summer Camp 08

A GROUP OF PILE SHOES

Page 16: Pile Work Presentation at IITK Summer Camp 08

EQUPIMENTS INVOLVED (Contd.) BORE PILING : i. Rig vii. Bentonite ii. Winch viii. Trimmie pipes iii. Baler ix. Hooper iv. Casing v. Chisel vi. Jet pipes

Page 17: Pile Work Presentation at IITK Summer Camp 08

A RIG

Page 18: Pile Work Presentation at IITK Summer Camp 08

WINCH

Page 19: Pile Work Presentation at IITK Summer Camp 08

BALER

Page 20: Pile Work Presentation at IITK Summer Camp 08

IRON CASING

Page 21: Pile Work Presentation at IITK Summer Camp 08

CHISEL

Page 22: Pile Work Presentation at IITK Summer Camp 08

JET PIPES

Page 23: Pile Work Presentation at IITK Summer Camp 08

TRIMMIE PIPES

Page 24: Pile Work Presentation at IITK Summer Camp 08

HOOPER

Page 25: Pile Work Presentation at IITK Summer Camp 08

PROCESS OF DRIVEN PILE Locating the pile center and subsequent

placing of a pile shoe of required diameter and thickness over the center.

Centering and placing the hollow cylindrical tube over the pile shoe.

Continuous hammering of the tube by means of winch and drop hammer, leading to the formation of a bore for the pile.

Required depth being achieved, reinforcement and concreting follows.

Page 26: Pile Work Presentation at IITK Summer Camp 08

PROCESS OF DRIVEN PILE (Contd.) Immediate pulling out of the tube

accompanied with ramming of the concrete at short intervals.

Shifting of the rig to the next pile center.

Page 27: Pile Work Presentation at IITK Summer Camp 08
Page 28: Pile Work Presentation at IITK Summer Camp 08
Page 29: Pile Work Presentation at IITK Summer Camp 08
Page 30: Pile Work Presentation at IITK Summer Camp 08
Page 31: Pile Work Presentation at IITK Summer Camp 08
Page 32: Pile Work Presentation at IITK Summer Camp 08
Page 33: Pile Work Presentation at IITK Summer Camp 08

DRIVEN PILE SPECIFICATIONS Pile shoe: 1. Internal Dia = 490mm/640mm 2. Thickness = 12mm Hollow cylindrical tube: 1. Length = 26.950m/27.950m 2. Internal Dia = 450mm/600mm 3. Thickness = 20mm 4. Weight = 6 – 8 MT Rig height = 27m/28m

Page 34: Pile Work Presentation at IITK Summer Camp 08

DRIVEN PILE SPECIFICATIONS (Contd.) Pile: 1. Depth = 25.250m/26.8m/27.4m 2. Diameter = 450mm/600mm 3. COL = 5.250m for 25.05m pile 4. Shaft length = 20m/21m 5. Bearing capacity = 60MT/120MT Time taken = 1–1.5 hrs (approx.)

Page 35: Pile Work Presentation at IITK Summer Camp 08

PROCESS OF BORE PILE Centering of rig on pile point & turning

the designated area’s ground muddy and loose by adding water & continuous ramming with baler.

Inserting the iron casing upto 2-3m depth & replacing the baler with chisel.

Continuous up down movement of chisel marking the onset of soil cutting by turning the mud into slurry.

As chisel gets deeper into ground, jet pipes are attached at its top and on one another till required depth is achieved.

Page 36: Pile Work Presentation at IITK Summer Camp 08

PROCESS OF BORE PILE (Contd.) All this time, the slurry comes out of the

bore due to & fro movement of chisel & jet pipes. Method known as direct mud circulation.

Replacement of chisel & jet pipes with a no. of trimmie pipes, used for washing the bore.

Bentonite used during washing for increasing soil cohesion & S.G. of slurry checked with hydrometer whether 1.1 or not.

Page 37: Pile Work Presentation at IITK Summer Camp 08

PROCESS OF BORE PILE (Contd.) Reinforcement & feeding the

hooper at the top of the trimmie pipes with concrete.

Concreting being over, trimmie pipes are being lifted up accompanied with ramming at short intervals.

Page 38: Pile Work Presentation at IITK Summer Camp 08
Page 39: Pile Work Presentation at IITK Summer Camp 08
Page 40: Pile Work Presentation at IITK Summer Camp 08
Page 41: Pile Work Presentation at IITK Summer Camp 08
Page 42: Pile Work Presentation at IITK Summer Camp 08
Page 43: Pile Work Presentation at IITK Summer Camp 08
Page 44: Pile Work Presentation at IITK Summer Camp 08
Page 45: Pile Work Presentation at IITK Summer Camp 08
Page 46: Pile Work Presentation at IITK Summer Camp 08
Page 47: Pile Work Presentation at IITK Summer Camp 08
Page 48: Pile Work Presentation at IITK Summer Camp 08
Page 49: Pile Work Presentation at IITK Summer Camp 08

BORE PILE SPECIFICATIONS Dia. Of iron casing = 750mm Dia of chisel < 750mm Pile: 1. Depth = 42m 2. Diameter = 750mm 3. Shaft length = 39m 4. Bearing capacity = 250 MT Time taken = 12-13 hrs. (approx.)

Page 50: Pile Work Presentation at IITK Summer Camp 08

REINFORCEMENT IN PILE The rebar beam cage consists of main

rods, helical rods, circular rods known as stiffner and cover blocks.

Helical rods provide more strength against tensile stresses.

Stiffner is provided for holding the main rods, thus keeping diameter of the cage constant throughout its length.

Cover blocks in helical rods provide exact fitting of the cage in the hollow cylindrical tube.

Page 51: Pile Work Presentation at IITK Summer Camp 08

REINFORCEMENT IN PILE (Contd.) Some specifications of the cage: 1. Diameter = 430mm/580mm/730mm 2. Length = 20.590m/21.656m/39.821m 3. Interval between stiffners = 2m 4. Interval in helical rods = 150mm/200mm 5. Dia. of main rods = 12mm/16mm/20mm 6. Dia. of stiffners = 12mm/16mm/20mm 7. Dia. of helical rods = 6mm/8mm/10mm

Page 52: Pile Work Presentation at IITK Summer Camp 08
Page 53: Pile Work Presentation at IITK Summer Camp 08
Page 54: Pile Work Presentation at IITK Summer Camp 08

BEARING CAPACITY OF PILE Formula for computing bearing capacity

of a driven pile: U = U = Ultimate Load N = No. of blows by hammer W = Wt. Of hammer in tons H = Fall of hammer in feet (usually 1m) L = Driven length in feet P = Set / blows in inch (10mm / 10 blows) Factor of safety = 3

50*

1

**

L

P

HW

L

N

Page 55: Pile Work Presentation at IITK Summer Camp 08

FEATURES OF DRIVEN PILE Distribution of load is in

longitudinal direction. Process is faster. Around 1-1.5 hrs.

for a pile of dia. 600mm and depth 27m.

High soil compaction is achieved, especially in group piles.

Around 3 times less expensive than bore piles.

Page 56: Pile Work Presentation at IITK Summer Camp 08

FEATURES OF DRIVEN PILE (Contd.) Bearing capacity is much lower. Max. dia. & depth achievable is

600mm and 29m respectively. Practiced outside city limits only. Source of noise pollution.

Page 57: Pile Work Presentation at IITK Summer Camp 08

FEATURES OF BORE PILE Distribution of load is in longitudinal

as well as lateral direction. Bearing capacity is higher due to

more frictional resistance between soil and concrete column.

Max. dia. & depth achievable is more than 2000mm & 1000m respectively.

Preferred in rocky areas.

Page 58: Pile Work Presentation at IITK Summer Camp 08

FEATURES OF BORE PILE (Contd.) Process is time consuming. Around

12-13 hrs. for a pile of dia. 750mm and depth 42m.

Compaction of soil not achieved. Practiced in city areas as creates

lesser noise. More expensive than driven piles.

Page 59: Pile Work Presentation at IITK Summer Camp 08
Page 60: Pile Work Presentation at IITK Summer Camp 08
Page 61: Pile Work Presentation at IITK Summer Camp 08
Page 62: Pile Work Presentation at IITK Summer Camp 08

READY MIX CONCRETE Cement Grade 43 & 53: The grade 43 n

53 corresponds to the avg. compressive strength attained after 6724 hrs in MPa of at least 3 mortar cubes of face area 15 sq. cm composed of 1 part cement, 3 parts of sand (conforming to IS 650:1966) by mass and P/4 (P is the % of water required to produce a paste of standard consistency as per IS standard) + 3% (of combined mass of cement + sand) of water, prepared and tested in the manner described in methods of physical test for hydraulic cement.

Page 63: Pile Work Presentation at IITK Summer Camp 08

READY MIX CONCRETE (Contd.) 1. After 721 hrs: Not less than 23 MPa for 43 grade, 27 MPa for 53 grade. 2. After 1682 hrs: Not less than 33MPa for 43 grade, 37MPa for 53 grade. 3. After 6724 hrs: Not less than 43MPa for 43 grade, 53 MPa for 53 grade. M 25 Concrete: Gives strength of 25 N/sq.

mm after 28 days of its laying. For moderate environment, the min. cement content of M 25 concrete is 6 bags per cubic metre.

Page 64: Pile Work Presentation at IITK Summer Camp 08

HEAVY EQUIPMENTS Batching Plant Transit Mixer Concrete Pump Excavator Hydraulic Mobile Crane Backhoe Loader

Page 65: Pile Work Presentation at IITK Summer Camp 08
Page 66: Pile Work Presentation at IITK Summer Camp 08

TRANSIT MIXER

Page 67: Pile Work Presentation at IITK Summer Camp 08

CONCRETE PUMP

Page 68: Pile Work Presentation at IITK Summer Camp 08

EXCAVATOR

Page 69: Pile Work Presentation at IITK Summer Camp 08

HYDRAULIC MOBILE CRANE

Page 70: Pile Work Presentation at IITK Summer Camp 08

BACKHOE LOADER

Page 71: Pile Work Presentation at IITK Summer Camp 08
Page 72: Pile Work Presentation at IITK Summer Camp 08
Page 73: Pile Work Presentation at IITK Summer Camp 08
Page 74: Pile Work Presentation at IITK Summer Camp 08
Page 75: Pile Work Presentation at IITK Summer Camp 08
Page 76: Pile Work Presentation at IITK Summer Camp 08
Page 77: Pile Work Presentation at IITK Summer Camp 08
Page 78: Pile Work Presentation at IITK Summer Camp 08
Page 79: Pile Work Presentation at IITK Summer Camp 08
Page 80: Pile Work Presentation at IITK Summer Camp 08
Page 81: Pile Work Presentation at IITK Summer Camp 08
Page 82: Pile Work Presentation at IITK Summer Camp 08