![Page 1: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/1.jpg)
Pipeline AC Voltage Safety
Nicole Ash Colby
Senior Safety Specialist
![Page 2: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/2.jpg)
Induced AC Voltage
• Alternating current can be induced on to steel pipelines from the Electromagnetic Force (EMF)of parallel high-voltage AC overhead power lines.
• Underground pipelines are more at risk if they are well-coated and electrically isolated for cathodic protection.
![Page 3: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/3.jpg)
Induced AC Voltage
![Page 4: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/4.jpg)
AC Voltage
• A fault condition can also cause stray voltage on pipelines or other metallic structures in the vicinity.
![Page 5: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/5.jpg)
Mitigation
• Permanent mitigation in place
• 50 Volts below ground pipe
• 15 volts above ground pipe
• zinc ground grids, ground rods, crushed rock, decouplers , electric ground loop systems etc.
![Page 6: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/6.jpg)
Protecting Employees
• Unitil (follows NACE Standard) policy is greater than 15 volts must ground prior to work.
• Below 15 volts can proceed with work, although an abnormal condition exists and voltage must be monitored if choose not to ground.
![Page 7: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/7.jpg)
Testing for Voltage
• Employees will check for voltage on all steel pipe and structures prior to start of work.
• Use a Voltage indicator (tick tracer)
![Page 8: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/8.jpg)
Testing for Voltage
• If voltage is found, stop work and have technician check with a voltage meter.
• If voltage is less than 15
volts, proceed. Greater
than 15 volts – ground.
![Page 9: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/9.jpg)
Testing for Voltage
• A driven ground rod or telescopic cane is used for testing voltage to get a proper structure to electrolyte (or pipe to soil) measurement.
![Page 10: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/10.jpg)
Testing for Voltage
• Pipe coating must be removed carefully to get an accurate voltage reading. Class 0 rubber gloves are required when removing any coating to protect the employee in the event there is voltage on the pipe.
![Page 11: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/11.jpg)
Grounding
• If voltage is over 15 vAC, grounding is required.
• Grounding is accomplished using ground rods and clamps.
![Page 12: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/12.jpg)
Monitor voltage hourly
Following Testing Procedures for Approaching Structures
Test pipe with Voltmeter
Greater than 15
Volts
Document test, time, date, location, structures tested and current conditions
Ground structure to remove voltage per Unitil procedure
Below 15 volts
Stop Work if voltage
increases > 15vac
YES
Perform Work and monitor
hourlyNO
Perform Work
Test pipe with Voltmeter
![Page 13: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/13.jpg)
Grounding
• Ground rods should be installed a minimum of 4 feet deep, if terrain is rocky, use multiple rods to ensure system is well grounded.
![Page 14: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/14.jpg)
Why do we ground?
• Touch potential – voltage between an energized object and person in contact with the object.
![Page 15: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/15.jpg)
Why do we ground?
• Step potential – the voltage across a worker who steps across an energized path of earth.
![Page 16: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/16.jpg)
Protecting Employees
• Protecting employees from known hazards is our goal.
• Awareness, training, equipment and PPE are required to ensure everyone is safe.
![Page 17: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/17.jpg)
Recording Information
• Be sure to record all information and readings on internal forms – DOCUMENT!
Test Station Location / Date Time AC Voltage Reading Road Crossing
Station Number
![Page 18: Pipeline AC Voltage Safety - Northeast GasVoltmeter Greater than 15 Volts Document test, time, date, location, structures tested and current conditions Ground structure to remove voltage](https://reader033.vdocument.in/reader033/viewer/2022052813/6096554a5110db37336633c3/html5/thumbnails/18.jpg)
For More Information
• Contact me – Nicole Colby
• 603-918-7381
• Contact Joe Pikas, VP P.L. Integrity
• 832-758-0009