pipeline lifting - connector subsea solutions...correction, maintenance and repair of subsea...

2
CONNECTOR SUBSEA SOLUTIONS Head office: Kokstadflaten 17, 5257 Kokstad, Norway Locations in: Brazil, UK, Croatia & Bosnia www.connectorsubsea.com // [email protected] +47 99 70 11 11 // connector-subsea-solutions PIPELINE LIFTING & HANDLING FRAME PRODUCT GROUP PIPELINE REPAIR & TIE-IN Product ID: 20502-0014-01 // Page: 1/2 PRODUCT DESCRIPTION Pipeline Lifting & Handling Frames facilitate inspection, free span correction, maintenance and repair of subsea pipelines. Incorporating a modular foot design for multiple seabed con- ditions and independent leg length configuration, the frame can provide secure, stable and controlled interface with the pipeline, regardless of the location, water depth or sea current. Lightweight and easy to handle, the entire Pipeline Lifting & Han- dling Frame can fold and pack into a standard 10ft shipping con- tainer. This makes it an applicable option regardless of vessel size or location. This solution provides an increased level of safety and control when manipulating subsea pipelines, reducing operational risk. CAPACITIES Pipeline size 4-20 in Lifting capacity (SWL) 25 t Lifting height (stroke of telescopic cyl.) 2046 mm Transversal travel ± 500 mm (from centre) Legs vertical stroke 2085 mm Allowable slope for operation 15 deg Water depth (m) 3000 m DIMMENSIONS & WEIGHT Unfolded dimensions (HxWxD) 2900 x 4268 x 5102mm Folded dimensions (HxWxD) 2900 x 2352 x 3053mm Mass of tool 5000 kg Weight of tool in air 49 050 N (5000 kgf) Weight of tool in water 42 674 N (4350 kgf) 2 0 4 8 , 5 1000 5 1 0 2 2 0 4 6 3 0 5 3 4268 2 8 4 8 , 5 ( 5 0 4 ) 20in 3668 CoG (CoB) Fully opened cylinders ( 1 8 8 7 )

Upload: others

Post on 26-Mar-2021

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PIPELINE LIFTING - Connector Subsea Solutions...correction, maintenance and repair of subsea pipelines. Incorporating a modular foot design for multiple seabed con-ditions and independent

CONNECTOR SUBSEA SOLUTIONSHead office: Kokstadflaten 17, 5257 Kokstad, NorwayLocations in: Brazil, UK, Croatia & Bosnia

www.connectorsubsea.com // [email protected]

+47 99 70 11 11 // connector-subsea-solutions

PIPELINE LIFTING & HANDLING FRAME PRODUCT GROUP

PIPELINE REPAIR & TIE-IN

Product ID: 20502-0014-01 // Page: 1/2

PRODUCT DESCRIPTION

Pipeline Lifting & Handling Frames facilitate inspection, free span correction, maintenance and repair of subsea pipelines.

Incorporating a modular foot design for multiple seabed con-ditions and independent leg length configuration, the frame can provide secure, stable and controlled interface with the pipeline, regardless of the location, water depth or sea current.

Lightweight and easy to handle, the entire Pipeline Lifting & Han-dling Frame can fold and pack into a standard 10ft shipping con-tainer. This makes it an applicable option regardless of vessel size or location.

This solution provides an increased level of safety and control when manipulating subsea pipelines, reducing operational risk.

CAPACITIES

Pipeline size 4-20 in

Lifting capacity (SWL) 25 t

Lifting height (stroke of telescopic cyl.) 2046 mm

Transversal travel ± 500 mm (from centre)

Legs vertical stroke 2085 mm

Allowable slope for operation 15 deg

Water depth (m) 3000 m

DIMMENSIONS & WEIGHT

Unfolded dimensions (HxWxD) 2900 x 4268 x 5102mm

Folded dimensions (HxWxD) 2900 x 2352 x 3053mm

Mass of tool 5000 kg

Weight of tool in air 49 050 N (5000 kgf)

Weight of tool in water 42 674 N (4350 kgf)

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DWG REV:SCALE:

DWG No.:DESCRIPTION:

TITLE:

SHEET:

PROJECT:

WEIGHT:

This drawing is the property of CONNECTOR SUBSEA SOLUTIONS. It must not be copied, altered or distribued in any way without prior consent from the company!

PROJECTION:

N/A

SN-18512 - PLT Development

PIPELINE LIFTING TOOLSWL 25 T

D00021224

2 of 4 61 :25FORMAT:

A3

Part No.:

PN00022554

DBBDRAWN BY:

DBBCREATED BY:

GADRAWING TYPE:

2048

,5

1000

5102

2046

3053

4268

2848

,5

(504

)

20in

3668

CoG(CoB)

Fully opened cylinders

(188

7)

Page 2: PIPELINE LIFTING - Connector Subsea Solutions...correction, maintenance and repair of subsea pipelines. Incorporating a modular foot design for multiple seabed con-ditions and independent

CONNECTOR SUBSEA SOLUTIONSHead office: Kokstadflaten 17, 5257 Kokstad, NorwayLocations in: Brazil, UK, Croatia & Bosnia

www.connectorsubsea.com // [email protected]

+47 99 70 11 11 // connector-subsea-solutions

PIPELINE LIFTING & HANDLING FRAMEPIPELINE REPAIR & TIE-IN

Product ID: 20502-0014-01 // Page: 2/2

For more information on this and related products, visit us at: www.connectorsubsea.com

INTERFACES

ROV operated Compliant with CSS ROV skid and topside control system

ROV Interface Specification 4 Line stab and Receptacle, Ø35, 10k, API 17D (x4)

Max. working pressure 207 bar /3000 psi

Hydraulic oil Shell Tellus S2 22/32 (typical) NAS8/ISO 4406 19/17/14

Installation Deck Crane & WROV

ADDITIONAL INFO

Design codes DNVGL 2.7-3 Portable offshore units DNVGL-OS-C101 Design of offshore steel structures

Operation Class DNV 2.7-3 R45-Sxx

Portable Offshore Unit Type A

Coating NORSOK 7B, Marine epoxy paint system

Cathodic protection Yes

Packing 10 ft offshore container, open top required

01 // Factory acceptance testing through remote interface

02 // Tool folded and packed into standard 10ft shipping container ready for transport or storage 04 // ROV footage of subsea operation

03 // Offshore mobilisation and deployment

A ( 1 : 8 )

PN0002438873.39 kgASSEMBLY1 ROV PANEL7 PN000244462.24 kgASSEMBLY4 LOCKING PIN6 PN00024516359.43 kgEN 10025-2 GRADE S355J2+N1 LIFTING FRAME5 PN0002261417.47 kgEN 10083-3 GRADE 42CrMo44 LEG MAIN SHAFT4 PN00022567555.44 kgASSEMBLY4 LEG MAIN ASSEMBLY 3 PN000224761239.51 kgASSEMBLY1 TROLLEY w TELESCOPIC CYLINDER ASSEMBLY2 PN00022485820.55 kgEN 10025-2 GRADE S355J2+N1MachiningMAIN FRAME1MATERIAL CERT.PART NUMBERMASS (kg)MATERIALQTYDESCRIPTIONTITLEITEM

A

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DWG REV:SCALE:

DWG No.:DESCRIPTION:

TITLE:

SHEET:

PROJECT:

WEIGHT:

This drawing is the property of CONNECTOR SUBSEA SOLUTIONS. It must not be copied, altered or distribued in any way without prior consent from the company!

PROJECTION:

N/A

SN-18512 - PLT Development

PIPELINE LIFTING TOOLSWL 25 T

D00021224

1 of 4 61 : 26FORMAT:

A3

Part No.:

PN00022554

DBBDRAWN BY:

DBBCREATED BY:

GADRAWING TYPE:

3

21

47 6

6 14.10.2019. Drawing update JUV Released5 1.10.2019. Note updates JUV Released4 6.9.2019. Design updated JUV Released

REV DATE COMMENT RESPONSIBLE STATE

Note:1. Weigt in air 4841.77 kg2. Submerged weight 4203 kg

5

R15 R16 R17 R18

ROV Receptacles

6

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DWG REV:SCALE:

DWG No.:DESCRIPTION:

TITLE:

SHEET:

PROJECT:

WEIGHT:

This drawing is the property of CONNECTOR SUBSEA SOLUTIONS. It must not be copied, altered or distribued in any way without prior consent from the company!

PROJECTION:

N/A

SN-18512 - PLT Development

PIPELINE LIFTING TOOLSWL 25 T

D00021224

3 of 4 61 :15FORMAT:

A3

Part No.:

PN00022554

DBBDRAWN BY:

DBBCREATED BY:

GADRAWING TYPE:

2091

3053

3053

2352

CoG CoG

(186

3)

(22)

Folded position for packing and shipping