pipeline & print rates & specifications gas journal€¦ · pipeline & print rates...
TRANSCRIPT
print rates & specificationsPipeline &Gas Journal
Materials: Digital files only, 300 dpi. Press optimized PDF files. For complete digital specifications contact: [email protected] or online at: www.pgjonline.com/advertise/printspecsLine Screen: 133 lines/inch, 150 max. Total Density: Not to exceed 260%. Color: 4/color refers to Process Color (CMYK). For 2/C please specify PMS inks.
Combined Frequency: Display space placed in Pipeline & Gas Journal, Underground Construction, and Pipeline News may be com-bined for determining the earned frequency rate.
Commission and Cash Discounts: Agency commis-sion is 15% of gross space and color billing allowed to recognized advertising agencies. Cash discount: terms from date of invoice.
2/3Full Page 1/2 pageisland
1/2 pagehorizontal
1/2 pagevertical
1/4 1/31/6
CLOSING DATES:
Closing date for orders is
12th of the month preceding
publication.
Closing date for ad materials is
20th of the month preceding
publication.
Print Ad Rates:4/C 1 mo. 3 mo. 6 mo. 12 mo. 18 mo. 24 mo.1 Page $9,070 $8,730 $8,435 $8,075 $7,815 $7,5602/3 Page $7,140 $6,990 $6,685 $6,380 $6,160 $5,9701/2 ISL $6,770 $6,545 $6,285 $5,915 $5,700 $5,490I/2 Page $6,125 $5,995 $5,800 $5,460 $5,210 $5,0601/3 Page $4,970 $4,870 $4,655 $4,370 $4,225 $4,1051/4 Page $4,270 $4,180 $4,055 $3,825 $3,670 $3,5251/6 Page $3,745 $3,660 $3,545 $3,365 $3,280 $3,075 B/W 1 Page $8,245 $8,005 $7,685 $7,420 $7,110 $6,8252/3 Page $6,025 $5,840 $5,560 $5,420 $5,295 $5,0901/2 ISL $5,580 $5,290 $4,960 $4,775 $4,615 $4,5601/2 Page $4,830 $4,665 $4,480 $4,265 $4,180 $4,0201/3 Page $3,420 $3,320 $3,115 $3,010 $2,915 $2,8101/4 Page $2,590 $2,495 $2,370 $2,325 $2,225 $2,1301/6 Page $1,985 $1,840 $1,770 $1,690 $1,590 $1,505
Business Card Directory: 6x (b/w) 6x (2c) 6x (4c)Single $ 960 $1,460 $1,960Double $1,920 $2,420 $2,920Triple $2,880 $3,840 $4,800Quad $3,840 $4,840 $5,840Quint $4,800 $6,050 $7,300 1 Page $6,600 $8,500 $14,000
Color Page Spread4-Color Process $1,450Single Process Color $500 $575Single PMS Color $650 $700Metallic Color $825 $900
Covers: 1 mo. 6 mo. 12 mo. Inside Front Cover $9,780 $9,235 $8,610Inside Back Cover $9,200 $8,600 $8,200Back Cover $9,950 $9,560 $8,725
Export Edition Advertising:Space charge is 75% of earned frequency rates. Covers not available.
Product Showcase:Showcase is published in the February, June and October issues.Print only: $700 eachAll 6x advertisers, 1/4 page or larger, qualify for 3 FREE Product Showcases. 12x advertisers qualify for 6 FREE Product Showcases.
Special Positioning:Specified editorial location, multiple units requiring facing positions, consecutive right-hand pages, other specified placement: 7% space rate.
Supplied Inserts: Space Rates Standard Custom2 page.................$9,000 Handling ............$250 .............quoted4 page .................14,000 Tip ........... 40/m .............quoted8 page .................22,500 Holding Stitch ........... 50/m12 page ............... 28,000 Polybag ........... 80/m16 page ............... 36,000Insert Quantity, Materials & Shipping: Contact publisher. Inserts are to be shipped prepaid, folded and ready for binding. Mock-up of insert must be submitted to publisher prior to acceptance of inserts. All inserts subject to U.S. Postal Service regulations. If questionable, check post office or submit dummy copy to art director. 70 lb. paper stock limitation.
Print Ad Specifications: Publication Trim Size: 7 3/4'' x 10 3/4'' (197 mm x 273 mm).
Live matter should be kept 1/4'' (6.35mm) in from trim.Bleed ads should be 1/8'' (3.175mm) larger on all sides.
Ad Sizes Inches Millimeters Width Depth Width Depth2 page spread, bleed 15 3/4 11 400 2802 page spread, live area 14 1/2 10 1/4 381 2601 page, bleed 8 11 203 2801 page, live area 7 10 1/4 184 2602/3 page, vertical 4 9/16 10 116 2541/2 page spread, bleed 15 3/4 5 5/6 406 1421/2 page spread, live area 14 1/2 4 7/8 394 1241/2 page, horizontal 7 4 7/8 178 124 1/2 page, vertical 3 3/8 10 86 2541/2 page, island 4 9/16 7 1/2 116 1911/3 page, vertical 2 1/4 10 57 2541/3 page, square 4 9/16 4 7/8 116 1241/4 page 3 3/8 4 7/8 86 1241/6 page 2 1/4 4 7/8 57 124Business Card DirectorySingle 3 3/8 1 7/8 86 48Vertical Double 3 3/8 3 7/8 86 98Horizontal Double 6 7/8 1 7/8 175 48Triple 3 3/8 5 7/8 86 149Horizontal Quad 6 7/8 3 7/8 175 98Vertical Quad 3 3/8 7 7/8 86 200Quint 3 3/8 9 7/8 86 251 1 page, bleed 8 11 203 280 1 page, live area 7 10 1/4 184 260
Ad closing: January 13Materials deadline: January 20In-home delivery date: February 19
Editorial focus:CybersecuritySCADA/Meas./Automation/InstrumentationLNGLeak DetectionLand Issues & ROWMidstream Update
Bonus features:ENTELEC Show IssueValve AutomationGIS Pipeline Integrity
Special section or supplements:PRODUCT SHOWCASE
Bonus Distribution:PLCAENTELECCGA Excav. & Safety Conference IPTC
M January M February M MarchAd closing: December 12Materials deadline: December 20In-home delivery date: January 22
Editorial focus:Natural Gas Outlook Pipeline Integrity AssessmentMarcellus/Utica/Bakken Update
Bonus features:Infrastructure Development and RepairWelding ProductsPipeline Construction Pipeline & Rail SGA Chair Profile
Special section or supplements:Worldwide Construction Preview
Bonus Distribution:UCT 2016Pigging Conference DCANACE
Ad closing: February 12Materials deadline: February 19In-home delivery date: March 21
Editorial focus:Pipeline Integrity Management/PiggingCorrosion ControlAPI/Liquids Pipeline Construction ReportField Applied Coating
Bonus features:Pipe CoatingsO & M: Replacement and Repair ReportINGAA Foundation Chair ProfilePipeline Integrity
Special section or supplements:Annual NAPCA Supplement
Bonus Distribution:Pipeline Opportunities ConferenceNAPCA, APCAINGAA, PLCACTube/Wire
Ad closing: March 14Materials deadline: March 21In-home delivery date: April 22
Editorial focus:Gas Distribution OperationsLDC Integrity/Risk AssessmentNGV’s
Bonus features:AGA/OTC/EGRC IssueGas DistributionPipeline Integrity: Leak Detection AGA Chair Profile
Special section or supplements:Special OTC Offshore Report
Bonus Distribution:AGA Operations ConferenceAPI Pipeline ConferenceOTC, ISHMSGA Management ConferenceEastern Gas Compression Roundtable
Ad closing: April 12Materials deadline: April 20In-home delivery date: May 23
Editorial focus:New Construction TechnologyCO2 Pipelines INGAA/Foundation Report Midstream Update Outsourcing ROWs and the Environment
Bonus features:Directional Drilling/BoringPipeline Integrity: Environmental ImpactGathering LinesTrenchingVacuum Excavation
Special section or supplements:BUYER’S GUIDEPipeline Construction Scorecard
Bonus Distribution:ILTA AGA Operations ConferencePTC
Ad closing: May 12Materials deadline: May 20In-home delivery date: June 20
Editorial focus:Compressor Station Maintenance & Ops.Rehab UpdateStorage & Peak ShavingMidstream Report/Shale Play Carbon Capture & Storage Regulatory Update
Bonus features:O & M: Replacement & Repair Rpt.Composite Repair SystemsCompressor PackagesNoise AbatementPipeline Integrity: Pipeline Rehab
Special section or supplements:PRODUCT SHOWCASE
2016 editorial calendarInvest in advertising that works!
26 Pipeline & Gas Journal / February 2015 / www.pgjonline.com
Africa7,015
Western Europe & EU Countries
1,669
FSU-Eastern Europe 12,632
Asia Pacific Region 31,348
Middle East 4,976
South & Central America and
Caribbean 8,327
North America 34,147
Under Construction: .......... 42,913Planned: ............................. 57,201
TOTAL: ..............100,114Note: All figures are in miles
2015 Worldwide Construction Report
Pipeline &Gas Journal’s
By Rita Tubb, Executive Editor
&GJ’s 2015 survey figures indi-cate 100,114 miles of pipelines are planned and under construction worldwide. Of these, 57,201 repre-
sent projects in the planning design phase while 42,913 reflect pipelines in various stages of construction.
Following is a look at new and planned pipeline miles in the seven basic regional groups (see area map). North America — 34,147; South/Central America and Caribbean – 8,327; Africa — 7,015; Asia Pacific – 31,348; Former Soviet Union and Eastern Europe – 12,632; Middle East — 4,976; and Western Europe and European Union — 1,669. For information on these and other pipeline projects, see P&GJ’s sister publication, Pipeline News.
Energy OutlookThe EIA’s Short Term Energy Outlook
released in November shows total U.S. crude oil production averaged an estimated 8.9 MMbpd in October, and monthly average production was forecast to surpass 9 MMbpd in December. Projected total crude oil pro-duction averages 9.4 MMbpd in 2015 and would be the highest annual average produc-tion since 1972. Natural gas plant liquids production is expected to increase from 2.6 MMbpd in 2013 to 3.2 MMbpd in 2015.
Natural gas working inventories on Oct. 31 totaled 3.57 Tcf, 0.24 Tcf (6%) below the level a year ago and 0.26 Tcf (7%) below the previous five-year average (2009-13). Despite the lower stocks at the start of the winter heating season, EIA expects the Henry Hub natural gas spot price to average $3.97/MMBtu compared with $4.53/MMBtu last winter. This price forecast reflects both lower expected heating demand and significantly higher natural gas production.
TrendsThe EIA’s report, Liquids Fuels and
Natural Gas In the Americas, points out the trend of foreign investors in hydrocarbon resources in the Americas and countries with the most open structures - like Canada, Brazil, Colombia, and the United States. Mexico, which has adopted new reforms that allow some foreign private investment in the energy sector, looks to join their ranks.
Investor focus is on developing and pro-ducing liquid fuels and natural gas. Moreover,
P
supplies and physical assets, such as refineries.
North AmericaNot surprisingly, the hot
topic in North America is TransCanada’s long-delayed Keystone XL pipeline to ship crude oil and diluted bitumen from Alberta’s oil stands to refin-eries in the U.S. The first three phases of the project have been built. The fourth phase, Keystone XL, calls for a 1,179-mile, 36-inch pipeline to move oil sands from Hardisty, Canada to Steele City, NB, and allow prod-uct to be shipped to Texas refineries on the Gulf Coast.
Now, with the U.S. House and Senate under Republican control, one of the first pieces of legislation was the Keystone XL bill. The House recently voted 266 to 155
both international oil companies and state-owned oil companies in the Americas have made the most substantial investments, fol-lowed by companies based in Europe, Asia and Oceania. Asian investments have dra-matically increased in the past five years, in particular, investment by China’s national oil companies to secure both crude oil
to approve construction. At the time of this writing, a similar bill was scheduled to go to the Senate for a vote, although President Obama has threatened a veto.
Worldwide Construction ReportJanuary
Innovative techniques, systems and equipment designed to save time and money...Innovative techniques, systems and equipment designed to save time and money...PRODUCTSHOWCASE
Trachte Trachte’s modular, pre-engineered,
pre-assembled enclosures are flexible in size/design, built around an expandable galvanized steel framework, and avail-able in transportable sizes from 4’-30’ wide. They are factory complete, fit-ted with customer specified equipment. More than 7,300 Trachte buildings have been installed for satisfied customers.
www.trachteusa.com
HYTORCThe Thrill gun is the World’s first
impact gun and torque multiplier in one! With a simple flip of the arm, the Thrill switches from impacting power to high-accuracy torqueing. The pat-ented safety paddle forces the opera-tor to keep both hands away from dangerous pinch points, preventing
one of the most common bolting related injuries. www.thrillgun.com
VermeerThe Vermeer D220x300 Navigator®
horizontal directional drill has a power-ful self-contained design featuring an onboard operator cabin, mud pump, crane and rod stager built in. A footprint of 37’ (8.2 m) by 8.5’ (2.6 m) provides versatile applications from urban work to remote pipeline installations.
Hydro XHydro X uses one of the planet’s most abundant natural resources to safely expose underground utilities; water. It’s safe, efficient and environmentally sound. Best yet, Hydro X delivers the precision and professionalism you expect from a leader in environmental projects.
www.hydrox.com
VACMASTERS VACMASTERS manufactures a
complete family of AIR-VACUUM EXCAVATION SYSTEMS and DIRECTIONAL BORING MUD VACUUMS. Our SYSTEM 4000, SYSTEM 3000 and SYSTEM 1000 air-vacuum excavators enable oper-ators to pothole using high pres-
sure air 95% of the time, while still having water available if required. Our SpoilVac mud vacuums, now available on-line/factory direct, are the highest quality, most economical systems available anywhere. To find out more visit us on-line at www.vacmasters.com or call us at (800) 466-7825.
www.vacmasters.com
NDT Systems & Services GmbH & Co. KG.
Introducing the LineExplorer UMp, NDT’s latest pipeline inspection innova-tion especially designed for high-resolu-tion pitting inspection. A higher sensor density and the use of ultrasound trans-ducers specifically tailored for small pittings ensure highest confidence levels
regarding detection and sizing accuracy as well as true quantitative wall thickness measurement capabilities.
www.ndt-global.com
EZ LineSupports the Oil & Gas Industry
Contact E-Z Line today for your Adjustable Pipe Supports, Pipe Clamps & Pipe Guides — 2'' thru 60'' Pipe Size, Shim Blocks - Steel or Epoxy, Pipe Shoes.
Structural Steel Fabricators of: Platforms, Structures, Pipe Racks, Embeds — ¼'' thru 1½'' Stud Gun Capacity, Skids, Plate Rolling and Pipe
Bending. E-Z Line utilizes 3-D Modeling Software to prepare shop and custom design drawings of platforms and structures. Schedules field trips to prepare custom design drawings to meet your requirements.
www.ezline.com
18 Pipeline & Gas Journal /February 2015 / www.pgjonline.com
Ball Winch Field Coating Services
Ball Winch Field Services has devel-oped advanced coating technology that meets the toughest requirements for today’s pipeline construction projects. Ball Winch teams deploy innovative blast cleaning, induction heating and powder equipment for mobile FBE and heat shrink sleeve applications. 936.228.0077
ballwinch.com
DENSOLEN AS 30-20DENSO GmbH, Germany, introduces
DENSOLEN® AS 30-20/R20 MP Tape System, the new very cost efficient real co-extruded 3- ply tape with maximum protection (class B 50 acc. EN 12068)
No risk of spiral corrosion, max oper-ating temperature + 85°C (185°F), tape thickness ≥ 0,5 mm . Pay Economy - Get First Class Quality !
www.denso.de
Dresser-RandDresser-Rand’s Enginuity® iFLEX
automation solution delivers engine/com-pressor control that provides analytic results aligned with your needs, from eco-friendly operations to increased productivity. Our proven methodology maximizes operating performance, quickly pinpoints trouble-shooting needs, and can improve the reli-ability of legacy equipment used in the natural gas pipeline industry.
www.dresser-rand.com
Product ShowcaseFebruary, June & October
International Offshore & Gulf of Mexico Report
2015 Offshore Technology Conference Highlights Trenchless Technologies Solve Marine Crossing ChallengeEIA: Gulf of Mexico Production to Increase Through 2016Keathley Canyon Connector Begins Serving Producers in Ultra-Deep Gulf WatersChevron Begins Production from Deepwater Gulf FieldsVarious Concepts of Pipe-In-Pipe Design and FabricationChevron Sanctions Deepwater Project in Gulf
6667
70
71
71
72
75
Pipeline &Gas Journal
P&GJ’s 2015 International Offshore and Gulf of Mexico Report provides an over view of the forthcoming Offshore Technology Conference (OTC) that is held annually in Houston and news on key industry projects and activities aimed at profitable oil, gas and pipeline developments.
Special OTC ReportApril
Pipeline &Gas Journal
M April M May M June
Ad closing: September 12Materials deadline: September 20In-home delivery date: October 22
Editorial focus:Pipeline Integrity ManagementCorrosion Control/Internal CoatingsILI UpdateUnpiggable Pipelines Rehab Update Cybersecurity
Bonus features:Large Directional Drilling Rig CensusO & M: Replacement & Repair Rpt.Pipeline Integrity: Pigs
Special section or supplements:PRODUCT SHOWCASEPipeline Construction Scorecard
Bonus Distribution:INGAAASME Offshore PipelineIPTCDCA Fall Board Meeting
Ad closing: October 12Materials deadline: October 20In-home delivery date: November 21Editorial focus:LNG ReportGas Transmission OutlookValves & Actuators Midstream Update
Bonus features:Odorization TechnologyHigh Pressure Non-steel PipePipeline Integrity: Risk Assessment Hot Tapping
Special section or supplements:34TH ANNUAL P&GJ 500 REPORT
Bonus Distribution:ADIPECValve World
Ad closing: November 14Materials deadline: November 21 In-home delivery date: December 19
Editorial focus:UCT 2017 Pre-Convention IssueLDC Integrity UpdateGas Curtailment and Seasonal Demand
Bonus features:O & M: Replacement & Repair Rpt.Polyurethane ApplicationsPigs & PiggingPipeline Integrity: HDPE
Special section or supplements:Line Pipe ReportPlastic Pipe ReportGas Distribution Report
Bonus Distribution:UCT 2017
*Ad Readership Study
66 | Pipeline & Gas Journal • May 2015
BAKER HUGHES PO Box 5050 Sugar Land, TX 77487-5050 Ph: (800) 231-3606 Fax: (281) 276-7218 www.bakerhughes.com [email protected]
BALL WINCH PIPELINE SERVICES 15786 Hwy 75 North PO Box 1255 Willis, TX 77378-1255 Ph: (936) 228-0077 Fax: (936) 856-9964 www.lbfoster.com [email protected]
BASIC SYSTEMS, INC. 10901 Clay Pike Road Derwent, OH 43733 Ph: (740) 685-2511 Fax: (740) 685-5516 www.bsinaturalgas.com [email protected]
BAYOU COATING LLC 5200 Curtis Ln New Iberia, LA 70560-0449 Ph: (318) 369-3761 Fax: (318) 369-9747 www.bayoupipe.com [email protected]
BAYOU FLOW TECHNOLOGIES, LLC 515 N. Sam Houston Pkwy E #630 Houston, TX 77060 Ph: (281) 591-1001 Fax: (281) 591-0284 www.bayoucompanies.com [email protected]
BAYOU WELDING WORKS, LLC 5200 Curtis Lane New Iberia, LA 70560 Ph: (337) 364-0298 Fax: (337) 365-9747 www.bayoucompanies.com
BERG STEEL PIPE CORP. 9225 Katy Freeway, Suite 428 Houston, TX 77024 Ph: (713) 465-1600 Fax: (713) 827-7423 www.bergpipe.com
BERRY PLASTICS 25 ForgeParkway Franklin, MA 02038 Ph: (800) 248-0149 Fax: (508) 918-1910 www.berryplastics.com [email protected]
BEST PUMP WORKS 8885 Monroe Houston, TX 77061 Ph: (713) 239-1527 www.bestpumpworks.com
BISHOP LIFTING PRODUCTS, INC. 125 McCarty Drive Houston, TX 77029 Ph: (713) 674-2266 Fax: (713) 672-9229
BKW, INC. Box 581611 Tulsa, OK 74158 Ph: (918) 836-6767 Fax: (918) 836-0141 www.bkwinc.com [email protected]
BLACKWELL ENTERPRISES, INC. 14634 Cotton Gin Avenue Wayne, OK 73095 Ph: (405) 449-7795 Fax: (405) 449-7795
BRADLEY B. BEAN, PE 419 E. Columbia St. Colorado Springs, CO 80907 Ph: (719) 578-9391 Fax: (719) 578-9394 www.b3pe.com [email protected]
BREDERO SHAW 3838 N Sam Houston Parkway E Suite # 300 Houston, TX 77032 Ph: (281) 886-2350 Fax: (281) 886-2353 www.brederoshaw.com [email protected]
AMERICAN AUGERS 135 US Route 42 West Salem, OH 44287 Ph: (419) 869-7107 Fax: (419) 869-7425 www.americanaugers.com [email protected]
AMERICAN PIPE BENDING 3207 Dawson Road Tulsa, OK 74110 Ph: (918) 749-2363 Fax: (918) 834-5910 www.apb-bend.com [email protected]
AMERICAN STEEL PIPE (ACIPCO) 1501 31st Avenue North Birmingham, AL 35207 Ph: (205) 325-7742 Fax: (205) 325-8194 www.acipco.com/steel [email protected]
AMETEK PROCESS INSTRUMENTS 455 Corporate Blvd. Newark, DE 19702 Ph: (302) 456-4400 Fax: (302) 456-4444 www.ametekpi.com
ANALYTICAL PIPELINE SOLUTIONS PO Box 51811 LaFayette, LA 70505 Ph: (337) 654-5455 www.analyticalps.com [email protected]
ANCHOR PIPE INTERNATIONAL, INC. 9310 Campbell Rd. Houston, TX 77080 Ph: (713) 465-8377 Fax: (713) 465-8393 www.anchorpipe.com [email protected]
APPLUS RTD 13131 Dairy Ashford Rd. Ste. 230 Sugar Land, TX 77478 Ph: (832) 295-5000 Fax: (832) 295-5001 www.applusrtd.us [email protected]
ARGUS MACHINE CO. LTD 5820-97 Street Edmonton, AB T6E 3J1 Canada www.argusmachine.com [email protected]
ARNTZEN CORP. 1025 School St. Rockford, IL 61105 Ph: (800) 821-3475 Fax: (815) 964-0045
ASPLUNDH TREE EXPERT CO. 708 Blair Mill Road Willow Grove, PA 19090 Ph: (215) 784-4206 Fax: (215) 784-1366 www.asplundh.com [email protected]
ATLAS COPCO CONSTRUCTION MINING TECHNIQUE USA LLC
3700 E. 68th Ave. Commerce City, CO 80022 Ph: (800) 732-6762 Fax: (303) 288-8828 www.atlascopco.us [email protected]
AUMA ACTUATORS, INC. Canonsburg, PA 15317 Ph: (724) 743-2862 www.auma-usa.com
AUMA RIESTER GMBH 79379 Muelheim Germany Ph: 49 7631 809-0 www.auma.com
AUTOMATED PIPE LINE INSTRUMENTS
7718 W 53rd Street North Maize, KS 67101 Ph: (316) 744-7600 www.apli2.com
AYUDA LLC 10921 Turkey Run Drive Edmond, OK 73025 Ph: (405) 293-3099 www.ayudallc.com
3M COMPANY 6801 River Place Blvd. Bldg. 147-4N-01 Austin, TX 78726 Ph: Ph: (512) 984-5863 www.mmm.com [email protected]
A & E CONSTRUCTION SUPPLY 54090 Loren Drive Route 9 Mankato, MN 56001 Ph: (507) 345-3252 [email protected]
A+ CORPORATION, LLC 41041 Black Bayou Road Gonzales, LA 70141 Ph: (225) 644-5255 www.geniefilters.com
ABB, INC. P.O. Box 8900 Bartlesville, OK 74005 Ph: (918) 338-4888 www.totalflow.com
ABOVE GROUND MARKERS 21705A Mueschke Road Unit A Tomball, TX 77377 Ph: (832) 467-3399 www.abovegroundmarkers.com
ABV S.R.L. Via di Coselli, 13/15 Coselli, Lucca 55060 Italy Ph: +39 0583 403587 Fax: +39 0583 949920 www.abvvalves.com [email protected]
ACIMEX (CBE GROUP) Zl Les Aubuis 26 rue Paul Langevi 37550, Saint Avertin 37550 France Ph: 33.2.4725 5785 www.acimex.net
ADVANCED GEODETIC SURVEYS, INC. – AGS
23111 FM 1462 Damon, TX 77430 Ph: (979) 553-4677 Fax: Fax: (979) 553-3756 www.agsgps.com [email protected]
AECOM 19219 Katy Freeway, Ste. 100 Houston, TX 77094 Ph: (281) 675-7629 www.aecom.com
AEGION CORPORATION 17988 Edison Avenue St. Louis, Missouri 63005 Ph: (636) 530-8000 Fax: (636) 530-8010 www.insituform.com [email protected]
AIR LOGISTICS 925 Todd Avenue Azusa, CA 91702 Ph: (626) 633-0294 www.airlog.com [email protected]
AIRPORT WINDSOCK CORP. 1616 Cliff Road East Burnsville, MN 55337 Ph: (952) 890-9214 Fax: (952) 890-9217 www.airportwindsocks.com [email protected]
ALLAN EDWARDS COMPANIES PO Box 9457 Tulsa, OK 74157-0457 Ph: (918) 583-7184 Fax: (918) 583-8423 www.allanedwards.com [email protected]
ALLU GROUP INC. 700 Huyler Street Teterboro, NJ 07608 Ph: (800) 939-2558 Fax: (201) 288-4479 www.allu.net [email protected]
BROWN BEAR CORPORATION PO Box 29 Corning, IA 50841 Ph: (641) 322-4220 Fax: (641) 322-3527 www.brownbearcorp.com [email protected]
BURNS 9400 World Parkway Kansas City, KS 64114 www.burnsmcd.com
CALCULATED CONTROLS 1177 Butler Road League City, TX 77573 Ph: (888) 790-9398 www.calc-controls.com
CANUSA-CPS DIVISION OF SHAWCOR
25 Bethridge Road Rexdale, ON M9W 1M7 Canada Ph: (416) 743-7111 Fax: (416) 743-5927 www.canusacps.com [email protected]
CAPPS VAN & TRUCK RENTAL 8555 John Carpenter Freeway Dallas, TX 75247 Ph: (972) 254-3400 www.cappsvanrental.com
CASE CONSTRUCTION EQUIPMENT 621 State St. Racine, WI 53404 Ph: (262) 636-6011 Fax: (262) 636-0876 www.casece.com
CATERPILLAR GLOBAL PIPELINE 13105 Northwest Freeway #1010 Houston, TX 77040 Ph: (713) 329-2259 www.cat.com/pipeline
CCI PIPELINE LLC 1058 O'Neal Lane Beaux Bridge, LA 70517 Ph: (337) 332-5808 www.ccipipe.com
CCI THERMAL TECHNOLOGIES INC. 5918 Roper Road Edmonton, AB T6B 3E1 Canada Ph: (780) 466-3178 Fax: (780) 468-5904 www.ccithermal.com [email protected]
CCSI 480 N. Sam Houston Parkway E. Ste. 380 Houston, TX 77060 Ph: (281) 591-1614
CECO COMPRESSOR ENGINEERING CORP.
5440 Alder Houston, TX 77081 Ph: (713) 664-7333 Fax: (713) 664-6444 www.tryceco.com [email protected]
CECO PIPELINE SERVICES CO. 5440 Alder Houston, TX 77081 Ph: (713) 663-1671 Fax: (713) 664-6444 www.cecopsc.com [email protected]
CELERITY CONSULTING 2 Gough Street, Suite 300 San Francisco, CA 94103 Ph: (866) 224-4333 www.consultcelerity.com [email protected]
CENTURY PRODUCTS, INC. W245 N5485 S Corporate Circle Sussex, WI 53089 Ph: (262) 820-3600 Fax: (262) 820-3700 www.centuryproducts.net
CERTIFIED SAFETY 1177 Butler Road League City, TX 77573 Ph: (800) 994-2339 www.certifiedsafety.net
AThis year’s buyer’s
guide highlights
companies from
every discipline in the
pipeline industry, from
transportation and
right-of-way services
to welding equipment
and insurance. Due
to space restrictions,
we cannot list every
company
featured in the online
version in the print
edition. But at buyers-
guide.pipelineandgas-
journal.com you can
see email, phone and
physical contact
information. You can
also browse by
category, search for
keywords, view
videos and read
in-depth profiles for
premium entrants—
and even add your
own company, if you’re
not listed already.
Basic listings are free
of charge and fully
searchable.
BUYER'S GUIDE M AY ' 1 5
P I P E L I N E & G A S J O U R N A L
B
C
Buyer’s GuideMay
CAPABILITY GUIDE w/FREEmatching Ad Space - July
38 Pipeline & Gas Journal / August 2014 / www.pgjonline.com
&GJ’s 2014 international pipeline sur-vey indicates 65,746 miles of pipeline are in various stages of construction
or planned. Of these, 33,801 miles account for projects in the planning and engineering phase, while 31,945 miles are in various stages of construction.
Construction Overview A breakdown of the pipeline mileage
planned and under construction in the six geo-political regions used in the report shows the following(see map): South-Central America and Caribbean – 6,099 miles; Middle East – 2,355 miles; Africa – 8,558 miles; Asia Pacific – 25,636 miles; former Soviet Union and Eastern European countries – 15,781 miles; and Western Europe and European Union countries – 2,381 miles. For further information on these and other pipeline proj-ects, see P&GJ’s sister publication, Pipeline News.
Africa Despite several African nations continu-
ing to deal with ongoing pipeline theft and threats to oil companies, industry analysts say
many hold promise for future activity. For example, East Africa exploration activity is projected to increase after foreign oil and gas companies made a series of sizable discover-ies in Mozambique, Tanzania, Uganda and Madagascar.
Moreover, the U.S. Energy Information Administration (EIA) estimates that South Africa holds 390 Tcf of technically recover-able shale gas resources. This came even after environmental concerns led the govern to place a moratorium on shale gas explora-tion from April 2011 to September 2012. In October 2013, the government released pro-posed new regulations on exploration of shale resources, however, international companies are still awaiting shale exploration permits.
Regardless of the challenges, pipelines are being planned and constructed in the region.
In Angola, ExxonMobil recently started up the CLOV project, expected to reach a capac-ity of 160,000 bpd. CLOV, located 87 miles off Luanda, includes 34 wells and eight manifolds connected by 112 miles of subsea pipelines to a floating production storage and offloading (FPSO) vessel and crude oil offloading terminal.
The 1,000-foot-long, 198-foot-wide FPSO can store up to 1.8 MMbbls of oil. Natural gas produced at CLOV is exported through a sub-sea pipeline to an Angola LNG plant in Soyo.
Technip is under contract to Total on the Moho Nord joint development project off the Republic of Congo. Located 46 miles south-west of Pointe-Noire in water depths of 1,500
Pipeline & Gas Journal’s 2014 International Construction ReportBy Rita Tubb, Executive Editor
World Report
South-Central America and Caribbean
6,099
Middle East
2,355
Africa
8,558Asia Pacific
25,636
Former Soviet Union and
Eastern Europe
15,781
Western Europe and European
Union
2,381
Under Construction ................ 31,945 Planned .................................... 33,801Total ......................................... 65,746(Note: all figures are in miles)
P
World Construction ReportAugust
96 Pipeline & Gas Journal / October 2014 / www.pgjonline.com
U.S. – GAS
Blueknight Energy Partners LP Madison County, TX 160 2016
Canyon Midstream Partners LLC Ector County, TX 120 2015
Capco Construction Bulldog NGL Pipeline/ 73 2015 Nacogdoches, TX
Cone Gathering Barbour County - 37 2015 Upshur County, WV
Crosstex Energy LP Howard, Martin and 35 2014 Glasscock counties, TX
Crosstex Energy LP Cajun-Sibon NGL 219 2014 Pipeline extension/LA
Devon Energy Corp. OK 450 2014
Driver, Southern Pipeline, R&R Pipeline Inc. Sterling III Pipeline/OK - TX 570 2013
Energy Transfer Edinburg Extension/ 51 2015 Partners LP Nueces County, TX - Live Oak, TX
Engineers Construction Addison Project/ 52 2015 Colchester, VT - Vergennes, VT
Gulf Interstate Wright Interconnect Project/NY N/A 2015 Engineering Co.
Major Pipeline LLC Ohio River 36 2016
MG Dyess Virginia Southside Expansion/ 100 2015 Kingsport, TN
Paso Norte Pipeline Group Deming, NM - Chihuahua, Mexico 340 2018
PVR Partners LP OH 45 2014
Ritter Construction Three Rivers, TX 54 2015
Rockford Corp. Tygart Valley Pipeline/ 42 2014 Randolph County, WV
Sawgrass Storage Downsville, LA 14 2015
Sheehan Pipeline Southeast Market 70 2015 Expansion/MS - AL
Southcross Energy Webb Pipeline/Webb County, TX 94 2015 Partners LP
Summit Natural Kennebec Valley, ME 130 2014 Gas of Maine
Sunland Construction Gillette, WY 180 2016
Tall Oak Midstream LLC Payne, Creek, Logan, Lincoln, 250 2014 Noble and Pawnee, OK
Texas Eastern PA 40 2015 Transmission
Welded Construction Southwest Michigan 1200B Pipeline/ 24 2015 St. Joseph County, MI
Willbros Group Inc. NET Mexico Pipeline/ 120 2014 Agua Dulce, TX - Starr County, TX
Xcel Energy Cherokee Pipeline/ 34 2015 Weld, Adams counties, CO
Xcel Energy West Main Pipeline 77 2015 Replacement/CO - WY
U.S. - OIL
Enbridge 6B Line Expansion/IN - MI 210 2014
Energy Transfer Partners South Texas Pipeline/ 82 2015 McMullen County, TX
Harvest Pipeline Gardendale, TX - Corpus Christi, TX 140 2014
Peterson Engineering Port of Albany, NY - Linden, NJ 166 2015
Plains All American Western Oklahoma Pipeline/ 95 2014 Pipeline LP Reydon, OK
Plains All American Cactus Pipeline/ 310 2015 Pipeline LP McCamey, TX - Gardendale, TX
CONTRACTOR/ PROJECT NAME/ MILES COMPLETION OWNER LOCATION DATE PIPELINES UNDER CONSTRUCTION: Quanta Services Inc. Houston Lateral Pipeline/ 48 2015
U.S. Gulf Coast
SemGroup/Rose Glass Mountain Pipeline/OK 210 2015 Rock Midstream LP
Snelson Companies Inc. BridgeTex Pipeline/ 162 2015 Abilene, TX - Texas City, TX
Summit Midstream Polar System Expansion/ Partners LLC Williams County, ND 45 2014
Sunland, Jomax, Sterling Double H Pipeline/ 462 2014 Dore, ND - Guernsey, WY
Sunoco Pipeline LP Granite Wash Extension/ 200 2014 Wheeler County, TX - Ringgold, TX
Tallgrass Energy Tallgrass Pony Express Pipeline/ Partners LP Guernsey, WY - Cushing, OK 690 2014
Tesoro Logistics Lignite, ND - Columbus, ND 7 2014
TexStar Midstream Karnes North Pipeline/ Logistics LP Karnes City, TX - Elmendorf, TX 50 2014
Trans-Foreland Trans-Foreland Pipeline/Cook Inlet, AK 23 2014 Pipeline Co.
OFFSHORE U.S.
Tata Steel Keathley Canyon Connector/ 214 2014 Gulf of Mexico
Technip/Enbridge Inc. Walker Ridge Gathering System/ 190 2015 Gulf of Mexico
Technip/Exxon Walker Ridge Gathering System/ Mobil Corp. Gulf of Mexico 30 2015
U.S. - PRODUCTS
Lineal Industries Allagheny Access Pipeline/ 159 2014 Pittsburg, PA - OH
MG Dyess ATEX Pipeline/Mont Belvieu, TX 135 2015
Phillips 66 Pipeline LLC Cross-Channel Connector N/A 2014 project/Houston
Williams Transco Texas Belle Pipeline/Mont Belvieu, TX 28 2015
CANADA - GAS
Keyera Corp. Wapiti Pipeline/AB - Simonette 56 2014
Pembina Pipeline Corp. Simonette Pipeline Expansion/ 37 2016 Simonette, AB - Fox Creek, AB
Pembina Pipeline Corp. Saturn Facility/AB 51.5 2014
Shell Canada Fort Saskatchewan, AB 50 2014
TransCanada Corp. Horn River Mainline/Rainbow Lake, AB 16.5 2014
CANADA - OIL
Access Pipeline Inc. Northeast Expansion/ Conklin, AB - Redwater, AB 185 2015
CH2M Hill Inc. Energy East Pipeline 2,858 2016
CH2M Hill Inc. Saint John Extension/ 932 2017 New Brunswick, AB
Enbridge Athabasca Athabasca Pipeline/ 214 2017 Winefred Lake, AB - Hardisty, AB
Enbridge Inc. Line 9B Reversal and Line 9 397 2014 Expansion/Ontario - Montreal
Enbridge Inc. Woodland Pipeline Extension/ 228 2014 Cheecham, AB - Edmonton, AB
Grand Rapids GP Stony Mountain Pipeline/ 114 2015 Fort McMurray, AB
Inter Pipeline Ltd. Mid-Saskatchewan Pipeline Expansion 56 2015
TexStar Midstream San Antonio, TX 50 2014 Logistics LP
TransCanada Corp. Grand Rapids Pipeline/ 310 2017 Fort McMurray, AB
U.S. Pipeline Southern Access Extension/ 165 2015 Pontiac, IL - Patoka, IL
North American Pipelines Under ConstructionConstructionScorecard
CONTRACTOR/ PROJECT NAME/ MILES COMPLETION OWNER LOCATION DATE
North American Pipelines Under Construction
Pipeline ScorecardMay, October
50 Pipeline & Gas Journal / December 2014 / www.pgjonline.com
nstead of light crude oil trucking through a hundred miles of dirt roads in a remote area of Australia, it is now being conveyed underground using a thermoplastic, flex-
ible composite pipe. This undertaking was recently awarded the Project of the Year by the Plastics Pipe Institute, Inc. (PPI) for its Energy Piping Systems Division (EPSD).
The project was selected for the honor due to the advanced technical composition of the pipe, the elimination of the environmental impact of heavy truck traffic, plus the extreme logistics that were met. PPI is the major North American trade association, representing all segments of the plastic pipe industry.
The 105.6-mile (170-km) reinforced ther-moplastic pipe (RTP) was installed in 2013 to transport light crude oil from Queensland to a processing facility in South Australia. The 4-inch diameter line had to meet the design pressure of 1,500 psi and a design temperature of 1800 F (820 C). The RTP line provided a 50% savings compared to steel pipe, was easy and fast to install and also met the technical requirements of Australia’s pipeline standard AS 2885.1 Pipelines — Gas And Liquid Petroleum.
“Aside from being able to convey hot crude oil in an austere area of Australia, the pipe had to withstand chemicals, high heat, rough soil conditions and even termites,” said Tony Radoszewski, president of PPI. “HDPE pipe is always a top consideration for the tough jobs, but I think this is the first time I have ever seen an RFQ stating that a pipeline had to be termite-proof.”
He presented the award to PPI member com-pany and manufacturer of the pipe Flexpipe Systems, Inc. (Calgary, Alberta), a division of ShawCor Ltd., during the association’s annual meeting held last spring in Palm Springs, CA.
The Flexpipe Systems FP601 HT RTP has an outer jacket and an inner liner of HDPE-RT (raised-temperature resistance) and two layers of wound fiberglass. Manufactured at the Flexpipe plant in Calgary, the 100 miles of pipe journeyed 10,500-plus miles across the ocean, then more than 900 miles inland to the site. The reel-less, coiled pipe was installed by plowing at a depth of 30 inches to 6.5 feet at major roads, dunes and major creek crossings.
The average rate of plowing achieved was 2.42 miles a day and, at peak times, as high
Tough Thermoplastic Pipeline Moving Crude OilHundred-Mile Down Under Project Honored By Plastics Pipe Institute
Special To Pipeline & Gas Journal
I
rosion and have sacrificial anodes and tape wrap to protect against external cor-rosion.
The Flexpipe RTP passed a thorough compli-ance assessment, as well as a risk assessment to cover any sections that were not addressed by AS 2885.1 due to the material type. A detailed technical assess-
ment of the design basis and qualification pro-cess of the pipe and jointing system was done based on API RP 15S Recommended Practice for the Qualification of Spoolable Reinforced Plastic Line Pipe.
This included a comprehensive set of short- and long-term tests to validate RTP resistance to the anticipated service conditions of the pipe-line. This included a long-term pressure capa-bility test as per ASTM D2992 and conducted for 14 months at the pipe-rated temperature, in addition to chemical resistance testing, tem-perature cycling testing, elevated temperature testing and external loading capability.
“The RTP provided distinct advantages when compared with rigid, fixed-length tradi-tional pipe. Installing more than 100 miles of the pipe using low-impact plowing took just 95 days with a small crew and protected sensi-tive environmental areas,” said Radoszewski. “Now instead of trucks making somewhat dangerous 14-hour round trips, there is a cost-effective pipeline that also solves production shutdowns that frequently occurred due to wet weather closing the clay and dirt roads.” P&GJ
as 5.5 miles a day. Because RTP could be plowed into the ground, the time and cost of installation were drastically reduced. Other types of pipe, such as glass reinforced epoxy (GRE) or steel, were unable to meet all the cri-teria of capability, ease of installation, time to install, ongoing maintenance and environmen-tal impact. There was a capital cost reduction of nearly 50% compared to a steel pipeline.
“The RTP was a high-temperature variant to withstand the high inlet temperatures of the transported fluids,” said Randy Knapp, director of engineering for the Energy Piping Systems Division of PPI.
The construction of RTP isolates aromatic fluids from the reinforcement layer, which provided the pressure containment for the pipe. This allowed continuous aromatic con-tent up to 25% by volume in the pipeline at the required inlet temperature of 158° F (70° C). Also, the corrosion resistance of HDPE coupled with the pressure capability of RTP made it the best option for the project.
The fittings used in this RTP system are nickel coated to protect from internal cor-
Plastic Pipe Report
Plastic Pipe ReportDecember
M April M May M June M October M November M December
Ad closing: June 13Materials deadline: June 20In-home delivery date: July 25
Editorial focus:Measurement & Instrumentation AMR: Ultrasonic & Coriolis Metering Documentation & Record Keeping GIS
Bonus features:Pipeline CommissioningValvesPipeline Integrity: Monitoring & Cleaning
Special section or supplements:CAPABILITY GUIDE w/FREE matching Ad Space
Bonus Distribution:MEA Operations ConferenceAppalachian Measurement Short CourseSGA Distr./Trans. Conference INGAA
Ad closing: July 12Materials deadline: July 20In-home delivery date: August 22
Editorial focus:International & Offshore Pipelines Welding TechnologyLeak Detection Safety
Bonus features:Innovations in PiggingInternational Project ReviewRisk AssessmentPipeline Integrity: Pigs
Special section or supplements:Pigging Products & Svcs. Association UpdateWorld Construction Report
Bonus Distribution:IPLOCASGA Offshore ConferenceOffshore Northern SeasASCE Pipelines Conference
Ad closing: August 12Materials deadline: August 19In-home delivery date: September 23
Editorial focus: Manufacturing and Pipelines Liquids Pipelines SCADA/Technology Report Contractor Partnerships CompressionBonus features:Gas RegulatorsThird Party InspectionPipeline Integrity: Line Pipe
Bonus Distribution:GITAASGMGas Machinery ConferenceCEPA
M July M August M September*
monthly columns and every issue contentEditor’s Notebook: Every month, P&GJ editor Jeff Share offers his award-winning perspective of events that impact, or have the potential to impact, virtually every sec-tor of the energy industry.
In The News: The latest information from around the nation and the world affecting the energy transportation business, pre-sented in a brief, concise format.
World News: Every month P&GJ takes a special look at oil and gas pipeline-related news globally, in addition to highlights from challenging subsea projects.
Projects: P&GJ maintains an ongoing watch on pipeline projects of all sizes either under way or in the planning stages, designed to bring oil and gas to consumers throughout North America and the rest of the world.
Government Guidelines: From Washington, D.C., P&GJ Contributing Editor Stephen Barlas keeps readers closely informed on all regulatory and legislative rulings and decisions that affect pipeline industry operations and economics along with reaction from industry association executives.
Offshore Review: Each month, P&GJ pro-vides exclusive coverage of major offshore pipeline projects, in addition to informing readers about recent events or changes that might impact future development activity.
Features: Every issue, P&GJ focuses on the latest technical information relevant to pipeline operations. P&GJ editors also interview exclusively and at length the lead-ing executives who make the vital decisions upon which the pipeline industry functions.
Q&A, Executive Profile: Interviews with industry leaders and personalities.
Business: Who’s been hired, promoted or changed jobs is listed for key personnel among energy companies and suppliers. Corporate mergers and acquisitions, relo-cations, name changes and honors.
What’s New: The newest in a vast array of equipment and services available to pipe-line companies and gas distribution utilities is presented every month.
Meetings: A complete menu of key semi-nars, conferences, exhibitions and other meetings related to the energy business is published monthly in the Calendar.
partnerships and show distribution
Offering the most lucrative advertisig opportunities in the pipeline market.sales staffSOUTHWEST & MIDWEST: Jim Donnelly PO Box 851471, Richardson, TX 75085Ph.: (972) 437-9557, Fax: (972) 437-9558E-mail: [email protected]
NORTHEAST: Denis O’Malley5 Hillandale Ave, Suite 101, Stamford, Ct. 06902Ph.: (203) 356-9694, Fax: (203) 356-9695 E-mail: [email protected]_SOUTHEAST: Doug Fix590 Hickory Flat Rd. Alpharetta, GA 30004Ph.: (770) 740-2078, Fax: (770) 740-1889 Cell: (770) 315-9033, E-mail: [email protected]_WEST COAST: Mike Lance, Kiefer Lance27943 Seco Canyon Rd. #414, Santa Clarita, CA 91350Ph.: (805) 620-0586, Cell: (661) 618-4067, E-mail: [email protected], [email protected]
MID CENTRAL: Donna Harbacek644 Hanging Branch Ridge, Cape Fair, MO 65624Ph.: (417) 559-3207, Fax: (708) 486-0525E-mail: [email protected]
UK, NETHERLANDS, NORTHERN BELGIUM, SCANDINAVIA: Roger Kingswell9 Tarragon Road, Maidstone Kent, ME16 0UR UKPh.: +44 (1622) 721222, Fax: +44 (1622) 721333E-mail: [email protected]
FRANCE, GERMANY, SOUTHERN BELGIUM, SPAIN, GREECE, PORTUGAL, NORTH AFRICA, SWITZERLAND, TURKEY, MIDDLE EAST: Jim & Catherine Watkins30 rue Paul Vaillant Couturier, 78114 Magny-les-HameauxPh. +33 1 30 47 92 51, Fax +33 1 30 47 92 40E-mail: [email protected]
ITALY, EASTERN EUROPE: Fabio PotestaCorte Lambruschini - Corso Buenos Aires8 - 5° piano, interno 9, 16129 Genova - ItalyPh.: 0039/010/5704948, Fax: 0039/010/5530088E-mail. [email protected]
RUSSIA: Arkady KomarovUI. Molodogvardeyskaya 43/17, kv. 53-54, Moscow 121351 RussiaPh.: 7 (495) 416-0658, Fax: 7 (495) 769-5732, E-mail: [email protected]
CHINA: Mike Xu14/F, Jinjiang Xiangyang Tower, 993 Nan Jing Road(W),Jing An District, Shanghai, 200041Cell: 13902475517, Email: [email protected]
January: UCT 2016Pigging Conference DCANACE
February:PLCAENTELECCGA Excav. & Safety Conference
March:Pipeline Opportunities ConferenceNAPCAAPCAINGAAPLCACTube/Wire
April:AGA Operations ConferenceAPI Pipeline ConferenceOTC, ISHMSGA Management ConferenceEastern Gas Compression RoundtableCEPA
May:ILTA AGA Operations ConferencePTC
July:MEA Operations ConferenceAppalachian Measurement Short CourseSGA Distr./Trans. Conference INGAA
August:IPLOCASGA Offshore ConferenceOffshore Northern SeasASCE Pipelines Conferenc September:GITAASGMGas Machinery ConferenceCEPA
October:INGAAASME Offshore PipelineIPTCDCA Fall Board Meeting
November:ADIPECValve World
December:UCT 2017