ThyssenKrupp CSA Companhia Siderúrgica DATE: 10-01-2011 Jumatatu AREA: C56-FGD-PIPING DIRECT MANPOWER: 35 REPORTED BY: Manuel Bartilotti Pict.#1 Pict.#2 Pict.#3 Fabric Filter Bag Cleaning, been lifted to the Platform EL+32.000, where is gone be Installed and Connected with Rubber Hoses to the Fabric Filters Bag Cleaning. Picture#1, Shows the Air Pressure Pipes For Both Ends Already Welded, who comes from Daily Report BOILER, FGD and PIPING COSTRUCTION HIGHTLIGHTS: PICTURES Product Silo, in the West Side of the Battery-B. Placed on the Top of the Plates who Covering the Fabric Filter Hoppers. Picture#2, Shows The Air Pressure Pipes Ash Conveying Blow Tanks to feed into the Picture#3, Shows the one of Gummed Bends Inwardly Lined with Porcelaine with the A ThyssenKrup p Steel Company

Upload: manuel-bartilotti

Post on 10-Aug-2015

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Piping Daily Report_FGD_10-01-2011

ThyssenKrupp CSA Companhia SiderúrgicaDATE: 10-01-2011 Jumatatu

AREA: C56-FGD-PIPING

DIRECT MANPOWER: 35

REPORTED BY: Manuel Bartilotti

Pict.#1

Pict.#2

Pict.#3

Fabric Filter Bag Cleaning, been lifted to the

Platform EL+32.000, where is gone be Installed

and Connected with Rubber Hoses to the

Fabric Filters Bag Cleaning.

Picture#1, Shows the Air Pressure Pipes For

Both Ends Already Welded, who comes from

Daily Report

BOILER, FGD and PIPING

COSTRUCTION HIGHTLIGHTS: PICTURES

Product Silo, in the West Side of the Battery-B.

Placed on the Top of the Plates who Covering

the Fabric Filter Hoppers.

Picture#2, Shows The Air Pressure Pipes

Ash Conveying Blow Tanks to feed into the

Picture#3, Shows the one of Gummed

Bends Inwardly Lined with Porcelaine with the

A ThyssenKrupp Steel Company

Page 2: Piping Daily Report_FGD_10-01-2011

ThyssenKrupp CSA Companhia SiderúrgicaDATE: 10-01-2011 Jumatatu

AREA: C56-FGD-PIPING

DIRECT MANPOWER: 35

REPORTED BY: Manuel Bartilotti

Pict.#4

Pict.#5

Pict.#6

Daily Report

BOILER, FGD and PIPING

AREAS of CONCERN: PICTURES

Concerning with not yet Installed Equipments

at "FGD-BATTERY-B", I still continue to inform

You the Missing Equipments, With his TAG.

NUMBERS, at the EL+0.000: Water Pumps:

(PP-13-61A) & (PP-13-61B).

Water for the Bearings of the Primary Fans and

the other is (OT02014-40) who is the Outlet

Water from the Bearings.

Picture#5, Shows the Electric Heater which

TAG: Nº is (AH-13-81A) already Fixed on their

Product Silo, in the East Side of the Battery-B.

Both Ends Already Welded, who comes from

Bends Inwardly Lined with Porcelaine with the

Supports. Now I can Start Connecting the Pipe

Work.

ones are (RW02006-40) who refill the Cooling

Picture#4, Shows the 1-1/2" Pipes which

Ash Conveying Blow Tanks to feed into the

Picture#6, Shows the other Gummed