ThyssenKrupp CSA Companhia SiderúrgicaDATE: 10-01-2011 Jumatatu
AREA: C56-FGD-PIPING
DIRECT MANPOWER: 35
REPORTED BY: Manuel Bartilotti
Pict.#1
Pict.#2
Pict.#3
Fabric Filter Bag Cleaning, been lifted to the
Platform EL+32.000, where is gone be Installed
and Connected with Rubber Hoses to the
Fabric Filters Bag Cleaning.
Picture#1, Shows the Air Pressure Pipes For
Both Ends Already Welded, who comes from
Daily Report
BOILER, FGD and PIPING
COSTRUCTION HIGHTLIGHTS: PICTURES
Product Silo, in the West Side of the Battery-B.
Placed on the Top of the Plates who Covering
the Fabric Filter Hoppers.
Picture#2, Shows The Air Pressure Pipes
Ash Conveying Blow Tanks to feed into the
Picture#3, Shows the one of Gummed
Bends Inwardly Lined with Porcelaine with the
A ThyssenKrupp Steel Company
ThyssenKrupp CSA Companhia SiderúrgicaDATE: 10-01-2011 Jumatatu
AREA: C56-FGD-PIPING
DIRECT MANPOWER: 35
REPORTED BY: Manuel Bartilotti
Pict.#4
Pict.#5
Pict.#6
Daily Report
BOILER, FGD and PIPING
AREAS of CONCERN: PICTURES
Concerning with not yet Installed Equipments
at "FGD-BATTERY-B", I still continue to inform
You the Missing Equipments, With his TAG.
NUMBERS, at the EL+0.000: Water Pumps:
(PP-13-61A) & (PP-13-61B).
Water for the Bearings of the Primary Fans and
the other is (OT02014-40) who is the Outlet
Water from the Bearings.
Picture#5, Shows the Electric Heater which
TAG: Nº is (AH-13-81A) already Fixed on their
Product Silo, in the East Side of the Battery-B.
Both Ends Already Welded, who comes from
Bends Inwardly Lined with Porcelaine with the
Supports. Now I can Start Connecting the Pipe
Work.
ones are (RW02006-40) who refill the Cooling
Picture#4, Shows the 1-1/2" Pipes which
Ash Conveying Blow Tanks to feed into the
Picture#6, Shows the other Gummed