Pisa District Community Plan August 2009 Page 1

máë~=máë~=máë~=máë~=afpqof`qafpqof`qafpqof`qafpqof`q=`çããìåáíó=mä~å=`çããìåáíó=mä~å=`çããìåáíó=mä~å=`çããìåáíó=mä~å====

Pisa District Community Plan August 2009 Page 2

Table of Contents

Executive Summary 3

Vision 4

Map of Area 5

Community Profile 6

Location 6

History 6

Economy 7

Environment 7

Lifestyle 9

Social Infrastructure 9

Specific Features of the Area 10

Discussion Points

Community Development 11

Community 11

Recreation 13

Community Facilities 14

Lake Dunstan 15

Physical Infrastructure 17

Roading 17

Rubbish and Recycling 19

Planning 20

What is important to the Community? 22

Pisa District Community Plan August 2009 Page 3

The Pisa District Community Plan

Executive Summary

Process

This Community Plan has emerged from a consultative process designed to encourage

community participation. Emphasis has been placed on obtaining community views

regarding the Pisa District, identifying its points of difference and determining what

opportunities there might be to ensure it remains an attractive and desirable place in which

to live, work and play.

This Plan has distilled the individual opinions into a collective community vision and

proposes a number of key recommendations that will assist in the development of the Pisa

District as a sustainable community. While the Plan has no legal status, it does provide an

important insight on the direction the community would like to head and provides direction

for many of the organisations involved or who identify with the Pisa District. To this end,

having a community group to oversee the aims of this Plan, on behalf of the community, will

be important and help to drive many of its recommendations. Currently, a local group of

volunteers is helping to develop and implement the plan.

Community Plan Process

The Outline planning process and time frame is as follows:

Initial Community meeting – held October 2008

Community Workshop – held February 2009

Draft Plan developed – March–May 2009

Draft Plan available for comment – June/July 2009

Submissions reviewed by Working Party – August 2009

Changes made to Community Plan – August 2009

Community Plan signed off – August 2009

Pisa District Community Plan August 2009 Page 4

Vision

We Value

Our Environment

• Lake Dunstan

• The rural aspect

• The vineyard and boating ambience

• Low density development

• The unique landscape with the ring of mountains including the Sugar Loaf, Pisa

Range and St Bathans Range

• The aquatic wildlife

Our Community

• A safe place to live

• Where people communicate and know one another

• Has a sense of community

• Is unique and independent from Cromwell, but retains links to it

• Has a plan for its future

• Respect of peoples places and spaces.

Recreation

• Lake Dunstan – asset to be maintained and enhanced; with walkways and a family-

friendly lake shore; the opportunities for water activities

• Green spaces

• Suitable spaces for all recreational pursuits and their users

• Safe walking and cycling access ways

Pisa District Community Plan August 2009 Page 5

Pisa District

Pisa District Community Plan August 2009 Page 6

Community Profile

Location

This Community Plan comprises both sides of State Highway 6 from Lowburn bridge north to

the head of Lake Dunstan. The area enjoys the immediate and visually stunning boundaries

of Lake Dunstan in the east and the flat-topped Sugar Loaf in the west (with the Pisa Range

beyond it).

The area is a series of residential subdivisions, lifestyle blocks and farmland situated along

Lake Dunstan and State Highway 6. The Parkburn Quarry, operated by Fulton Hogan, is just

north of the urban community. It serves as a boundary to the urban community, limiting

expansion in that direction. Sheep farming, viticulture, orchards and lifestyle blocks

characterise the largely rural aspect of the area, particularly between State Highway 6 and

the Sugar Loaf and west and north of the Parkburn Quarry.

Pisa Moorings is 8 kilometres north of Cromwell, 41 kilometres to Alexandra, 45 kilometres

from Wanaka, 54 kilometres from Arrowtown and 72km to Queenstown.

History

The Pisa District presumably takes it name from the Pisa Range to its west. The highest point

is Mt Pisa (1961m). It was so named by Otago surveyor John Turnbull Thomson and his

assistant Alexander Garvie on a trek through the Lindis Pass in 1857, because a rocky

outcrop reminded them of Italy’s ‘leaning tower of Pisa’. (Discover New Zealand: A Wises Guide, 1994)

The Pisa District was until recent times, predominately rural farm land. Mt Pisa Station has a

long and continuous history in the area. Its original homestead was built in 1865 from stone

quarried from above the building site. The farm was subdivided after the first World War

and sold to returning soldiers. Today, Pisa Station is a 4691ha sheep and cattle farm that has

been in the same family since 1924. (www.totaltravel.co.nz)

Since the late 1990s viticulture has become increasingly prominent in the area, which is

proving agreeable to pinot noir grape growing.

The building of homes in Pisa Moorings began in the early 1990s. It was the first residential

subdivision in the area and intended to be a rural-style subdivision; the original

developments were clearly promoted as a low level infrastructure developments by the

developers.

Pisa District Community Plan August 2009 Page 7

Economy

Historically, the local economy has been based on farming, particularly sheep farming.

Farming remains important, but there has been growing diversity with the emergence of

orchards and since the 1990s, vineyards and residential subdivisions. While there are a

number of holiday homes the residential population would appear to be largely a mix of

retired people and families. Most working people are either self-employed, employed in

nearby centres or in land related activities such as horticulture, viticulture and farming.

Central Otago has been subject to rapid economic development during the past five years.

The Cromwell basin has experienced the effects of this growth with the price of land and

houses increasing from the lows experienced in the 1990s. In the Pisa District, both Pisa

Village and Perriam Cove residential developments have emerged and the number of new

homes in the district increased substantially during this economically buoyant period.

According to Statistics New Zealand in the meshblock area from Lowburn to the top of the

Lake and therefore, including the Pisa District, median household income in 2006 was

$57,300. For Central Otago the average household income in 2006 was $43,400.

Wineries offer the only retail outlets in the area and there is provision for a retail space at

Perriam Cove, which is unutilised. There is also some tourist, home/farm stay

accommodation in the area.

Parkburn Quarry falls within the Pisa District. This industrial area has gravel and bitumen

operations on the site with a further bitumen plant proposed.

Environment

The Pisa District has a predominately rural setting of farm land, orchards and vineyards.

State Highway 6 effectively runs through its centre with subdivisions and some rural

properties on the lakeside and rural holdings on the other side up to the foot of the Sugar

Loaf. On the top of the Sugar Loaf is an old airstrip which is still used infrequently by small

aircraft.

The area has stunning and distinctive landscape qualities, which include Lake Dunstan; the

surrounding mountains, particularly the Pisa range in the west and most immediately, the

Sugar Loaf beneath it.

The Sugar Loaf has a CODC Significant Landscape Feature classification. This classification

recognises the Sugar Loaf as a clearly visible and distinct local feature due to its unique

glacial river terraces with flat tops and steep side slopes. Similar to those at Bendigo and in

parts of the Ardgour Valley, they rise out of the flat river plains to more than 300 metres

Pisa District Community Plan August 2009 Page 8

above sea level. The CODC review says that in general, this feature should be retained.

(Central Otago District Rural Review) Most of the lower river terracing was lost with the formation of

Lake Dunstan.

Any proposed development is now subject to strict regulations and would require resource

consent. The area that this relates to has grown over time as awareness of its values has

heightened.

The 27-hectare, Department of Conservation managed Mahaka Katia Scientific Reserve (Pisa

Flats) identifies the formerly widespread “river terrace cushion” as best represented in this

area and notes other unique characteristics.

Although small and significantly modified, this area represents the best remaining

native saline vegetation on the Upper Clutha terraces. Small areas of saline soils

were formerly a characteristic feature of the basins of the Central Otago Ecological

Region. Lindis, Pisa, and Dunstan Ecological District: A Survey Report for the Protected Natural Areas Programme (1994)

Lake Dunstan in the east of the district is visually appealing and within close proximity,

particularly to those living in the residential subdivisions, for recreational pursuits including

boating, swimming, walking and picnicking.

The Pisa District enjoys a typical Central Otago continental climate. The prevailing wind is

the nor-westerly with the impact of the wind decreasing as you approach the mountains.

The west of the district is somewhat sheltered from the wind and therefore, probably has

its own microclimate.

Pisa District Community Plan August 2009 Page 9

Lifestyle

The population in the Pisa District has grown substantially in the past decade with many

families making their homes in the area. The Statistics New Zealand meshblock, which

includes the Pisa District has a recorded population of 86 in 2001 and 219 in 2006. This is an

increase of 160 percent. Anecdotal evidence suggests the population has continued to

grow. There are some absentee owners who come for holidays. Its lake front location also

attracts day visitors.

There is a mix of ‘ages and stages’ in the community with both retired people and families.

They enjoy the rural/vine-growing ambience of the area, which contributes to the special

nature of this community, but also acknowledge the challenges such diversity brings.

Social Infrastructure

The social infrastructure of the Pisa District is undeveloped. However, a wide range of

health, education, recreation and emergency services can be comfortably accessed in

Cromwell, 8 kilometres away. The nearest community hall is at Lowburn at the southern end

of the Pisa District. The nearest church is at Lowburn. Since the building of the new

Presbyterian Church in Cromwell, regular services are no longer held at Lowburn but the

church is available for functions eg weddings, funerals. The church is currently available for

use by anyone.

Pisa District Community Plan August 2009 Page 10

Specific Features

Characteristics Pastoral farming, orchards, vineyards, residential subdivisions.

Population The Statistics NZ meshblock from Lowburn to the top of Lake Dunstan,

which includes the Pisa District recorded the resident population in

2006 at 219. This is up from 84 in 2001; an increase of 160 percent.

Occupied Dwellings There were 96 occupied dwellings in 2006 in the wider Pisa area. In

the residential subdivisions there are a total of 455 sections (note

some of these already have houses on them) that have been

subdivided (or could be potentially subdivided) within the zone under

current District Plan conditions.

Ethnicity Occupants regarded themselves as European 75%; Maori 1.3%.

Climate Continential.

The average rainfall is approximately 400mm. There are on average

70 wet days per year.

There is a marked variation between winter temperatures (down to -

10 degrees C) and summer temperatures (up to 35 degrees C).

The prevailing wind is nor-westerly.

Features Lake Dunstan

The Sugar Loaf (Significant Landscape Feature)

Pisa Mountain range directly behind the Sugar Loaf

St Bathans Range

Mount Pisa Station

45th Parallel

Rural holdings

Vineyards

Orchards

Natural, rural setting

Close proximity to Cromwell

Lowburn Collie Club

Airstrip on the Sugar Loaf

Industries Pastoral, viticulture, horticulture, quarrying, tourism, technology

businesses based at home

Pisa District Community Plan August 2009 Page 11

Community Development

Community

The people of the Pisa District are keen to preserve their lifestyle, which they characterise as

peaceful, with a rural aspect and a lake and vineyard ambience.

The district has experienced rapid population growth and corresponding housing

development in the past decade. This has resulted in a mix of people at various ‘ages and

stages’ of life, including retired people and employed people with families. The challenge of

managing the diverse expectations of the age and stage life variance; rural land activities

and residential activities; and permanent residents and absentee (holiday) home owners,

was acknowledged at the meeting. These expectations relate to the extent and nature of

future development including what community facilities should be established and where.

There was overwhelming support for the coming together of the various communities and

people in the district. They want to build a sense of community and to achieve an integrated

community for consensus decision-making in relation to planning and the communities’

wellbeing.

It is important in building a community that those that live there feel secure. This includes

personal safety of people in the community, support in the event of an emergency and a

support network for the elderly and sick. These matters involve a number of agencies as

well as the surrounding community. Residents in the community possess a wide range of

skills that may be utilised in the event of an emergency or when a need is identified. As a

general rule such people only become known when there is an emergency and some

centralised knowledge of peoples special skills would be helpful. This could be done on a

voluntary basis of people supplying information.

It was identified as an issue that respect of individual property and access to privately

owned areas is often a privilege provided by the owner and not a right. Respect of these

privately owned areas as well as public spaces is important in a community. This includes

travelling within the community at speeds which respect the peaceful community

environment.

Communication was considered an important element, with all voices being heard.

Pisa District Community Plan August 2009 Page 12

There were suggestions for social gatherings, community events and a website/blog/email.

There was interest in continuing to have the district represented with suggestions made for

the longer term, which included continued representation on the community board/council

and a ratepayers’ association.

Objective

To build a strong sense of community within the Pisa District that has respect for the

varying needs and shared values of residents.

Recommendations for action:

• Involve as many people as possible in the formulation of this Community Plan and

its subsequent implementation.

• Hold community meetings in relation to ideas in this plan.

• Determine the best method of communication to inform them about meetings,

participatory processes and outcomes, eg, newsletter, emails, column in

community newspaper.

• Investigate the formation of a community association or other representative

organisation.

• Carry out a voluntary community audit of peoples skills in the community.

• Education on accessibility to public and private areas and encourage respect of

these areas.

Pisa District Community Plan August 2009 Page 13

Recreation

Opportunities for recreation in the Pisa District are high given its proximity to Lake Dunstan

and its rural and largely undeveloped location.

Some aspects of recreation are discussed elsewhere in this report. They include

development of a children’s playground (community facilities section), tennis courts, a bird

sanctuary and safe spaces for water activities (Lake Dunstan section).

Interlinking walkways and cycleways through reserve land, around the lake and extending to

Cromwell and Wanaka were the most supported recreational activity put forward. These

walkways would require toilets and rubbish bins at appropriate places. There is some cross

over here in relation to roading. With the rural nature of the housing subdivisions,

walkways were suggested as safe route for those on foot and bikes.

Reserves and the preservation of green spaces gained consistent interest. Most existing

reserve area is in strips and pockets around the subdivisions. Beautification of key sites

including tree planting within the district was favoured but any such plan must be in

harmony with the surrounding landscape. The lake front area, which has the greatest

potential for developing reserve areas (see also, Lake Dunstan section), is administered by

Land Information New Zealand (LINZ). The development of a picnic area was suggested,

with some possible locations indicated, including alongside a proposed children’s

playground and on the lake front.

It was identified that a community garden or orchard could be developed which would

enhance the community spirit while providing fruit/vegetables to the community.

Objective

To ensure recreational opportunities are developed and maintained in line with the values

and needs of the community.

Recommendations for action

• Develop a plan for a network of walkways/cycleways that meet recreational

desires and safety concerns. The network should consider linking key areas

including reserves and Lake Dunstan.

• Create walkways/cycleways to an appropriate standard, which promote

community use.

• Identify existing green spaces and reserves and potential ones and consider how

they might be used, maintained and/or developed.

• Identify potential picnic sites and how these may be developed.

• Develop a community garden.

Pisa District Community Plan August 2009 Page 14

Community Facilities

A number of community facilities were mooted. Suggestions for the future included a

community hall, volunteer fire station, a place for sports/concerts, a meeting point, art

gallery/boutique/tourism shop, a kindergarten/preschool and public toilets were raised, but

there was limited community support for these. There was interest in establishing a

cafe/wine bar, a children’s playground, a park area and to a lesser extent, a playground for

adults (eg, tennis courts).

Objective

To develop a realistic level of facilities that meets the needs of the community.

Recommendations for action

• Talk to CODC Parks and Reserves department about plans already in motion for a

children’s playground.

• Investigate appropriateness of and possibilities for a cafe/wine bar (including

designated retail space in the area) and how a business of this type could be

attracted to the district.

Pisa District Community Plan August 2009 Page 15

Lake Dunstan

Lake Dunstan is a significant part of the Pisa District landscape. It is a natural asset that

contributes to the area and makes it a desirable place to live and play. It offers many

recreational opportunities in, on and around the lake. Currently these are occurring in a

spontaneous, ad hoc way. The community expressed a strong interest in maintaining and

enhancing the lake and lake area to facilitate greater enjoyment of it and to ensure the

diversity of activities and users are adequately and safely accommodated.

Lake Dunstan is administered by The Clutha Management Committee and LINZ and any

development of the shore would have to be coordinated with these groups.

Access to the lake and walkways along the shore were a reoccurring theme that is discussed

elsewhere in this report (recreation section).

There was strong support for an upgrade to the boat ramp; maintaining the lakeshore, the

lake and reserves (including clearing weed from the lake); and some natural landscaping.

There was also some interest in having a jetty and pontoon and in streetscape planting

along the lake front for beautification, wind break and shade purposes.

There was concern about conflict of use on the lake and whether there should be

designated areas for specific uses to ensure a safer environment. These include: a swimming

area away from the boat ramp; a ski lane by the boat ramp.

It was noted that the shoreline areas are valuable habitat for endangered bird species.

Development within the Pisa Moorings district is already compromising wildlife habitat.

There is a black billed gull colony (a nationally threatened species) that is found only on the

small shingle spit between Pisa Moorings and Perriam Cove. Similarly there are banded

dotterils and pied stilts at a number of sites around the lake, particularly on the very barren

looking land to the north of North Pisa village. Falcons are also present in the area. The

crested grebe has been doing well on the lake and protection of some of the special bird

habitats before further encroachment on the lake by people means these birds will not be

lost. It was suggested a no-boating, wildlife (bird) reserve on nesting areas of the lake,

which could encompass the habitat of the Southern Crested Grebe.

It was acknowledged that some of the challenges relating to these changes might include

educating water users about designated areas and enforcing regulations and requirements

relating to access of both vehicles and foot traffic. The intention of these improvements is to

enhance the lifestyle of the community. They may also attract recreational users from

outside the Pisa District.

Pisa District Community Plan August 2009 Page 16

Objective:

To plan for the safety and enjoyment of various interests and recreational pursuits on and

in Lake Dunstan, while preserving and enhancing the area’s special, natural environment.

Recommendations for action:

• Get the boat ramp assessed to determine future requirements and costs.

• Investigate the feasibility of developing and maintaining a jetty and/or pontoon.

• Develop landscape concept drawings that show reserves on the lake shore and

plantings along the lake front.

• Identify specific issues for lake maintenance.

• Liaise with appropriate agencies to coordinate development on the lake shore.

• Liaise with the Clutha Management Committee to determine demarcation of in/on

water activities (boating, jet skies, swimming) to avoid conflict of use.

• Discuss with Clutha Management Committee how rules on and around the lake can

be enforced.

• Gather data on the purpose, nature and area required for a bird sanctuary and

how it might be protected.

Pisa District Community Plan August 2009 Page 17

Physical Infrastructure

Infrastructure is critically important for all communities. The Pisa community has

experienced significant population growth in the past decade and there is room for further

housing development and population growth in the future based on the current subdivided

area. It is important the community prioritise and decide on the nature of any additional

infrastructure.

The initial subdivision of Pisa Moorings was designed by developers and accepted by the

Central Otago District Council as a rural subdivision: the original developments were clearly

promoted as a low level infrastructure development by the developers. This distinction was

in sympathy to its rural location and resulted in less physical infrastructure such as footpaths

and street lighting.

Subsequent residential developments have taken a more suburban approach to

infrastructure, most obvious in the newest residential subdivision of Pisa Cove.

Roading

Roading is integral to any community and particularly for Pisa with State Highway 6 running

through it. Most residents need to access this highway on a daily basis to get to work, school

and for most, if not all, social and commercial services. Many considered that travelling

through the Pisa district is special and the roading network should be like a scenic corridor

with stops for various activities associated with the wine industry.

There was discussion about getting clear and visible signs on State Highway 6 to identify the

Pisa District. There was interest in making access off the highway welcoming and safer by

lowering the highway speed zone in the area.

It was suggested that there needed to be better signage within the residential area to

identify key public amenities available.

It was also suggested that speed limits be reduced within the community and that speed

restrictions be introduced along the lake front with enforceable rules defining vehicle and

foot traffic accessways.

A suggestion for the future was to have footpaths beside roads, but there was more

immediate interest in developing walkways and cycleways to access the lake, within Pisa

Moorings and even linking to Cromwell. While this introduces a recreational element,

walkways also offer obvious practical and safety aspects that relate to reducing foot and

cycle traffic on roads around the area. (See recreation section.) Other future improvements

Pisa District Community Plan August 2009 Page 18

raised included kerbing and channelling eg Ferry Road, to improve road drainage and

protect the road infrastructure.

Some interest was expressed in having public transport available to Cromwell.

The issue of school bus safety (routes, bus stops, turnaround point) was previously raised

and it was suggested that investigation could occur to develop a joint commercial bus

stop/school bus stop.

Objective

To have a road network that is safe and practical for all users.

Recommendations for action:

• Lobby New Zealand Transport Agency to improve the intersection at the entrance

to Pisa Moorings.

• Investigate welcoming signs to the district.

• Advocate for reduced speed restrictions within the residential area, including the

lake front.

• Develop appropriate parking at the lake.

• Investigate a bus stop for the area.

• Assess the need for signage to identify amenities within the residential area.

Pisa District Community Plan August 2009 Page 19

Rubbish and Recycling

There was some interest in having a rubbish collection from bins on the waterfront to

ensure the area stayed tidy. Recycling attracted greater support. Recycling bins for glass

and other materials were suggested as there is currently no household collection service

for recyclables. The idea of a recycling depot was put forward, but there was uncertainty

about a suitable location for it. It was suggested that while there is wheelie bin

collection services currently that this service could come under the Council based

system.

Objective

To have a rubbish and recycling system that meets the needs of the community.

Recommendations for action

• Assess demand for a rubbish collection service around the lake front.

• Investigate the feasibility of having recycling bins or a recycling collection

service for households.

Pisa District Community Plan August 2009 Page 20

Planning

In the past, development in the Pisa area has been somewhat adhoc. Residents of this

fledgling district believe there needs to be clear direction for the future so they can continue

to enjoy the lifestyle that attracted many of them to the area. Within the residential area

there have been a number of subdivisions occur including Wakefield Bay, Pisa North, Pisa

Vineyard, Pisa Moorings, Pisa Village, Perriam Cove and Orchard Bank with a further

subdivision across the State Highway on Clarks Road.

At the meeting there was clear acknowledgment of, and a resolve to, manage the challenges

of differing interests: rural and residential; and the wide range of residents’ life stages and

associated needs.

There was a strong emphasis on maintaining the rural aspect of the Pisa District, on

maintaining and developing reserves, developing walkways and cycleways (recreation

section) and improving access to the lake.

Some concern was raised about how all proposed development would fit into the area and

funding was identified as a challenge in relation to realising and maintaining the

improvements. The topic of community liaison in relation to emergency planning, civil

defence and/or neighbourhood watch was broached on a number of occasions.

Strong support was given for stricter dog control, but there was limited support for a dog

park.

There was also interest in the size of sections. Discussion gave consideration to enforcing a

minimum section size (1,000sqm), closing loopholes for subdivision and how these

suggestions would impact on older, single folk who might prefer smaller section sizes.

While further subdivision was not necessarily favoured there was strong support that should

subdivision occur that land should be taken for recreation purposes as part of consent

conditions.

A suggestion for gaining an understanding and possible consolidation of council bylaws

(building/planning regulations between communities) gained good support.

Some concern was also expressed about the operation of the Parkburn Quarry and finishing

of the buffer zone between the quarry and the residential area.

Pisa District Community Plan August 2009 Page 21

Objective:

To plan for and manage the varying interests and requirements of the Pisa District.

Recommendations for action

• Create a plan for future development that realistically meets the various needs and

shared values of the Pisa District community. Include development and

maintenance costings.

• Investigate how stricter dog control can be implemented and whether the

suggestion for a dog park would be supported with options for locations.

• Discuss issues in relation to section size and other bylaws; and how consolidation

of bylaws can be realistically achieved.

Pisa District Community Plan August 2009 Page 22

What is important to the Community?

From the community workshop the working party have attempted to prioritise

recommendations for the community. From these priorities, timelines for working on these

recommendations can be developed.

High – Action required immediately

Med – To be considered once high actions are completed.

Low – To be considered once medium priorities are completed.

Pg Recommendation Priority

12 Involve as many people as possible in the formulation of this Community

Plan and its subsequent implementation.

High

12 Hold community meetings in relation to ideas in this plan. High

12 Determine the best method of communication to inform them about

meetings, participatory processes and outcomes, eg, newsletter, emails,

column in community newspaper.

High

12 Investigate the formation of a community association or other

representative organisation.

High

12 Carry out a voluntary community audit of peoples skills in the community. High

12 Education on accessibility to public and private areas and encourage

respect of these areas.

High

13 Develop a plan for a network of walkways/cycleways that meet

recreational desires and safety concerns. The network should consider

linking key areas including reserves and Lake Dunstan.

High

13 Create walkways/cycleways to an appropriate standard, which promote

community use.

Med

13 Identify existing green spaces and reserves and potential ones and

consider how they might be used, maintained and/or developed.

Med

13 Identify potential picnic sites and how these may be developed. Med

13 Develop a community garden. Med

14 Talk to CODC Parks and Reserves department about plans already in

motion for a children’s playground.

High

14 Investigate appropriateness of and possibilities for a cafe/wine bar

(including designated retail space in the area) and how a business of this

type could be attracted to the district.

Low

16 Get the boat ramp assessed to determine future requirements and costs. High

16 Investigate the feasibility of developing and maintaining a jetty and/or

pontoon.

Low

16 Develop landscape concept drawings that show reserves on the lake shore Low

Pisa District Community Plan August 2009 Page 23

and plantings along the lake front.

16 Identify specific issues for lake maintenance. Med

16 Liaise with appropriate agencies to coordinate development on the lake

shore.

Med

16 Liaise with the Clutha Management Committee to determine demarcation

of in/on water activities (boating, jet skies, swimming) to avoid conflict of

use.

Med

16 Discuss with Clutha Management Committee how rules on and around

the lake can be enforced.

Med

16 Gather data on the purpose, nature and area required for a bird sanctuary

and how it might be protected.

Low

18 Lobby New Zealand Transport Agency to improve the intersection at the

entrance to Pisa Moorings.

High

18 Investigate welcoming signs to the district. Low

18 Advocate for reduced speed restrictions within the residential area,

including the lake front.

Med

18 Develop appropriate parking at the lake. High

18 Investigate a bus stop for the area. High

18 Assess the need for signage to identify amenities within the residential

area.

Med

19 Assess demand for a rubbish collection service around the lake front. Low

19 Investigate the feasibility of having recycling bins or a recycling collection

service for households.

Low

21 Create a plan for future development that realistically meets the various

needs and shared values of the Pisa District community. Include

development and maintenance costings.

High

21 Investigate how stricter dog control can be implemented and whether the

suggestion for a dog park would be supported with options for locations.

Med

21 Discuss issues in relation to section size and other bylaws; and how

consolidation of bylaws can be realistically achieved.

High