pitch
TRANSCRIPT
![Page 1: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/1.jpg)
‘SAS: Who Dares Wins’By Josh Bateman
![Page 2: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/2.jpg)
Content Outline
In this proposal I will be explaining and showing the different elements of my short film. I will be outlining these different elements:• Target audience• Resources• Personnel requirements, e.g. cast and crew, team, specialists;
budget; project schedule
![Page 3: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/3.jpg)
Target Audience
The audience I will be targeting will be teenagers and adults from the ages of 16-45. The reason I will be targeting this audience is because it is the average age that people who would watch an action production, also younger and older generations don’t watch sort films as much as the age range I’m targeting do.
![Page 4: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/4.jpg)
ResourcesIn my short film I will need different types of resources such as production equipment, properties, costume.For production equipment I will be using a:• Canon Legria HF R28 (camera)• Tribec T650 (tripod)• Tascam DR-40 Linear PCM Recorder (audio)• Advid software (Editing software)
For the props I will be using a:• SVD BB gun • Army back pack• Army vest• Fake blood
For Costumes I will be using:• Army vest • Back pack• Camo paint• Bandana• Boots• Heavy duty trousers
![Page 5: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/5.jpg)
Personnel Requirements – Cast & CrewFor my cast I will need 4 male actors to play the part of the squadron and 1 to be the antagonist.For my crew I will use a skeleton crew which will consist of a:• DOP- Director Of Photography• Grip• Sound recorder• Make up• Editor
![Page 6: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/6.jpg)
Personnel Requirements - TeamI will need a team of individuals to help with the production, these people would be a:• Transporter ;so that we can move
equipment the cast/crew around.• Production Assistant ;this person
will be the runner and get important things for the cast and crew.
![Page 7: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/7.jpg)
Personnel Requirements - Specialists
The specialists that I would need for my production would be an editor, DoP and make-up artist. The reason why I would need a specialist in editing is so that I can have good edits in chase scene and special effect when needed. I would want a specialist DoP because they will provide good shots of the scene which will allow the editor to improve the productions. Finally I feel like having a make-up specialist would make sure that the character fits the scene and it looks realistic.
![Page 8: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/8.jpg)
Personnel Requirements – Budget
Cameras: Production Equipment:Cameras Duration Detail of
costsTotal of costs
Canon C300 EF mount 8.3MP
5-7 days £140 per day
£700 - £980
Canon 5d mk3 22.3MP
5-7 days £80 per day £400 - £560
Red scarlet-X 14MP
5-7 days £264 Inc. VAT per day
£1320 - £1848
Equipment Duration Detail of costs Total of costs
Sound - Tascam DR - 40
5-7 days £42.50 per day £212.50-£297.50
Tripod - Manfrotto Advanced Fluid Tripod
5-7 days £11 per day £55-£77
Sliders - Kessler Crane Philip Bloom Signature Pocket Dolly 1m
5-7 days £37.50 per day £187.50-£262.50
Lighting - Litepanels Micro Pro
5-7 days £11.50 per day £57.50-£80.50
![Page 9: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/9.jpg)
Personnel Requirements – Budget
Crew Time Per day Full production
DoP 5-7 days £371-£620 £1855-£3720
Editor 2-3 days £157-£176 £785-£1056
Make-up artist
5-7 days £100 £500-£700
Type of vehicle
Duration Detail of costs
Total of costs
Mini bus (holds 9)
20-60 mins £48.50 for 60 mins
£48.50
Taxi 20-60 mins £25.30 for 30 mins
£50.60
Crew: Travel:
![Page 10: Pitch](https://reader035.vdocument.in/reader035/viewer/2022070520/58f204401a28ab647b8b4577/html5/thumbnails/10.jpg)
Personnel Requirements - Project Schedule
Starting date Finishing date23/05/2016 27/05/2016