pjm data integration - osisoft data integration ed kovler, pjm interconnection jason berney,...
TRANSCRIPT
PJM©20171
Presented by
PJM Data Integration
Ed Kovler, PJM Interconnection
Jason Berney, Integral GIS
PJM©20172
PJM ‒ Focus on Just 3 Things
Market Operation
• Energy
• Capacity
• Ancillary Services
Regional Planning
• 15-Year Outlook
Reliability
•Grid Operations
•Supply/Demand Balance
•Transmission monitoring
2
1
3
www.pjm.com
PJM©20173
Booth #21
T
PJM©20174
RESULTSCHALLENGE SOLUTION
COMPANY and GOAL
PJM Interconnection manages 160GW of
electricity over 13 states and DC.
A. Utilize PI System
Tools to integrate
data: Integrator for
ARCGIS
B. DIMA – Dispatch
Interactive Map
Application
• Improved situational
awareness
• “Best tool ever developed
for Dispatchers”
• “Quick way to get an
overview of the PJM
system”
A.Integrating real time
data from disparate
sources
B.Improving
situational
awareness for end
users
PJM©20175
Goal of Presentation
www.pjm.com
Fundamental building blocks of consuming real-time PI System Data
in a web GIS application
Geospatial world and the PI System
PI Integrator for Esri
ArcGISPI Web API
PJM©20176www.pjm.com
PJM © 2016. All Rights Reserved
PJM©20177
Data Flow
Raw Data PI Interface PI Tags AF ModelPI Integrator
for EsriGeoEvent Processor
ArcGIS Server Feature Service
Display Data
Raw Data PI Interface PI Tags AF Model PI Web APIPI Web API Channels
Display Data
DIMA Implementation
PI Web API Implementation
PJM©20178
Raw Data to PI Data Archive
www.pjm.com
PJM©20179
PI Web API
PI Tags data and AF Elements accessible from the PI Web API REST endpoint
PJM©201710
PI Web API
without PI Web API Channels
PI Web API
with PI Web API Channels
AF Database
PI Data
Archive
W E B S O C K E T C O M M U N I C A T I O N
Data Retrieval
REQUESTGET
REQUEST
Raw Data PI Interface PI Tags AF Model PI Web APIPI Web API Channels
Consume Data
Display Data
PJM©201711
PJM©201712
Moving Forward
PI Web API Channels could be valuable asset for your organization.
Mapping platform agnostic.
Start simple, prove the concept, promote it.
You can do this.
PJM©201713
Real Results
Integrating data resulted in the successful implementation of DIMA
Come see DIMA at the Integral Booth #21
PJM © 2016. All Rights Reserved
PJM©201714
Contact Information
Ed Kovler
Lead Solutions Architect
PJM Interconnection
Jason Berney
GIS Specialist
Integral GIS
14
PJM©201715 15
Questions
Please wait for the
microphone before asking
your questions
Please remember to…
Complete the Online Survey
for this session
State your
name & companyhttp://bit.ly/uc2017-app